X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-157-24750"

m
m
Line 11: Line 11:
 
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]]
 
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]]
 
|-
 
|-
| Municipality: [[Perry_Township,_Tuscarawas_County,_Ohio|Perry Township]]
+
| Municipality: [[Perry Township,_Tuscarawas_County,_Ohio|Perry Township]]
 
|-
 
|-
 
| Operator Name: [[AW TIPKA OIL & GAS INC]]
 
| Operator Name: [[AW TIPKA OIL & GAS INC]]

Revision as of 01:17, 15 August 2019

Well Details

Well ID: 34-157-24750
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Perry Township
Operator Name: AW TIPKA OIL & GAS INC
Well Pad ID:
Farm/Lease Name: PARKER RAY
License Status: Producing
License Date: 1989-12-20
Spud Date: 1990-02-17
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1990-02-22
Well Total Depth: 5794 ft
Configuration: Vertical
Latitude: 40.238766623
Longitude: -81.37104538

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1989-12-20 2700 TIPKA AW OIL & GAS INC GeoDate 12/20/89
Oil and Gas 1989-12-20 Issued Date 12/20/89 Expired Date 12/20/90 Acres 0050000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05794 Proposed Drill Depth 05794
Original Spud 1990-02-17
Completed 1990-02-22
Reached Total Depth 1990-02-22
Completion Report Received 1990-03-15
Construction Permit Expires 1990-12-20
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 5587 5699 0
2006-09-11 5594 5696 17

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 70000 Gal 40000 FRAC:WATER&SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1990 AW TIPKA OIL & GAS INC 19606 120 257
1991 AW TIPKA OIL & GAS INC 19407 99 365
1992 AW TIPKA OIL & GAS INC 12403 83 365
1993 AW TIPKA OIL & GAS INC 8834 0 365
1994 AW TIPKA OIL & GAS INC 5133 48 365
1995 AW TIPKA OIL & GAS INC 3787 18 365
1996 AW TIPKA OIL & GAS INC 3570 0 365
1997 AW TIPKA OIL & GAS INC 2704 0 365
1998 AW TIPKA OIL & GAS INC 2150 0 365
1999 AW TIPKA OIL & GAS INC 1646 19 365
2000 AW TIPKA OIL & GAS INC 2150 0 365
2001 AW TIPKA OIL & GAS INC 2229 0 365
2002 AW TIPKA OIL & GAS INC 1774 28 365
2003 AW TIPKA OIL & GAS INC 1602 0 365
2004 AW TIPKA OIL & GAS INC 842 19 365
2005 AW TIPKA OIL & GAS INC 1109 0 365
2006 AW TIPKA OIL & GAS INC 1329 0 365
2007 AW TIPKA OIL & GAS INC 1189 0 365
2008 AW TIPKA OIL & GAS INC 1669 0 365
2009 AW TIPKA OIL & GAS INC 1628 0 365
2010 AW TIPKA OIL & GAS INC 1399 0 365
2011 AW TIPKA OIL & GAS INC 1130 0 365
2012 AW TIPKA OIL & GAS INC 1367 0 366
2013 AW TIPKA OIL & GAS INC 1031 43 365
2014 AW TIPKA OIL & GAS INC 830 0 365
2015 AW TIPKA OIL & GAS INC 1125 0 365
2016 AW TIPKA OIL & GAS INC 807 19 365
2017 AW TIPKA OIL & GAS INC 901 24 365
2018 AW TIPKA OIL & GAS INC 1184 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1990 AW TIPKA OIL & GAS INC Brine 555 257
1991 AW TIPKA OIL & GAS INC Brine 243 365
1992 AW TIPKA OIL & GAS INC Brine 213 365
1993 AW TIPKA OIL & GAS INC Brine 133 365
1994 AW TIPKA OIL & GAS INC Brine 27 365
1995 AW TIPKA OIL & GAS INC Brine 0 365
1996 AW TIPKA OIL & GAS INC Brine 35 365
1997 AW TIPKA OIL & GAS INC Brine 0 365
1998 AW TIPKA OIL & GAS INC Brine 26 365
1999 AW TIPKA OIL & GAS INC Brine 14 365
2000 AW TIPKA OIL & GAS INC Brine 101 365
2001 AW TIPKA OIL & GAS INC Brine 101 365
2002 AW TIPKA OIL & GAS INC Brine 0 365
2003 AW TIPKA OIL & GAS INC Brine 0 365
2004 AW TIPKA OIL & GAS INC Brine 0 365
2005 AW TIPKA OIL & GAS INC Brine 0 365
2006 AW TIPKA OIL & GAS INC Brine 0 365
2007 AW TIPKA OIL & GAS INC Brine 0 365
2008 AW TIPKA OIL & GAS INC Brine 75 365
2009 AW TIPKA OIL & GAS INC Brine 0 365
2010 AW TIPKA OIL & GAS INC Brine 0 365
2011 AW TIPKA OIL & GAS INC Brine 37 365
2012 AW TIPKA OIL & GAS INC Brine 112 366
2013 AW TIPKA OIL & GAS INC Brine 129 365
2014 AW TIPKA OIL & GAS INC Brine 0 365
2015 AW TIPKA OIL & GAS INC Brine 0 365
2016 AW TIPKA OIL & GAS INC Brine 53 365
2017 AW TIPKA OIL & GAS INC Brine 47 365
2018 AW TIPKA OIL & GAS INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL2346 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0613614433 2016-10-31 Production Wells No Violations Today I am onsite responding to a citizen complaint. I notified of a spill on the lease road. When I arrived onsite with inspector Randy Akins, we saw black staining in the middle of the lease road all the way back to the production tanks. This staining varied from approximately 2 feet wide up to approximately 7 feet in places. Some oil globules could be see floating on the standing water in puddles on the road. The tank dike is saturated with both crude and brine. Crude residue reaches approximately 8 inch from the current water surface up the side of the tanks. I notified Alan with AW Tipka Oil and Gas and he met us out at the site. The Terry Whitehair with the Emergency Management Response group was notified of the situation and will have someone on site on 11/1/16.
1478114640 2016-11-01 Production Wells Violations Noted Upon arrival on location I met with Allen Tipka, James Stafford, and Terry Whitehair, Terry and I proceeded by way of the lease road, an observation of the lease road it was determined that brine water and oil was released on the lease road. At that tank battery we found that two of the 210 bbl. tanks had leak and that discharge was contained in the dike area. Clean up was discussed and a plan was agreed on. Pelletize lime and manure will be spread on the lease road. The 210 bbl. tanks will be removed, and the area will then be steamed and the liquids will be hauled away. The dike area will then be bio remedied to complete the cleanup process. The site will need monitoring until completed.
1478611480 2016-11-08 Production Wells No Violations
1479487081 2016-11-18 Production Wells No Violations On the day of my inspection I was accompanied by Fred Romeo with ODNR. The site is still in need of some cleanup. I spoke with Kent Adams with Locus to get an update on when the Bio-remediation was going to start. He stated that they have been working on cultures that will stand the colder temperatures. I stated that they have something in place within the next two weeks or we will need to cleanup with a different procedure.
1491387546 2016-10-31 Production Wells No Violations I was notified by inspector Scott Scheiner of a spill on well 34-157-2-4750. I accompanied Scott to the tank battery. Please refer to Inspector Scheiner report.
1500305281 2017-07-17 Production Wells No Violations This is a follow up inspection to a meeting held with Ken Stafford. The cleanup is under way. The tanks and the material in the dike has been removed. Some of the material has been hauled out, but some material remains. The remaining material needs to be hauled out to a landfill. A test for chlorides shows that 4121 ppm chloride remain in the water in the sump hole. The test was performed with high range Quantabs. An attempt to call Ken Stafford has been made to when the remaining material was going to be hauled out.
1501246166 2017-07-28 Production Wells No Violations Upon arrival on location I found that the cleanup has been completed. The tanks have been replaced with one 100 bbl. steel tank and one 50 bbl. plastic tank. The contaminated material have been removed and replaced with new lime stone. I took a water sample using high range Quantabs and resulted in 1121 ppm. chlorides. I will contact Alan Tipka, and discuss further cleanup needed. Additional monitoring is needed.
1504701090 2017-09-06 Production Wells No Violations Upon arrival on location I found that the cleanup has been completed. The tanks have been replaced with one 100 bbl. steel tank and one 50 bbl. plastic tank. The contaminated material has been removed and replaced with new lime stone. I took a water samples with low range Quantabs and resulted in 1633 ppm. chlorides. I will contact Alan Tipka, and discuss further cleanup needed. Additional monitoring is needed.
1590626597 2017-06-30 Production Wells No Violations On the day of my inspection I was accompanied by Terry Whitehair with ODNR, and Ken Stafford with doing work for Allen Tipka, AW Tipka Oil & Gas. It was discussed that more cleanup needs to be done. Quantabs were used for sampling in different areas of the dike. We used low range and found areas of 680 ppm. Chlorides, and use high range and found an area of 1659 ppm. Chlorides. It was explained to Ken Stafford that the water needed to be removed and properly disposed of in a UIC disposal well. Then the straw is to be remove from the dike area and lime is to be applied. At that time, Ken is to inform Inspector Akins and then more sampling is to be done. At that time, it will be determined of more Bio-remediation is needed. Ken was also advised that they have 30 days from todays date to complete cleanup.
1660971320 2016-12-08 Production Wells No Violations This is a follow up inspection to a prior oil and brine spill. The dike are has been started with the Bio-remediation. The area has been covered with straw to insulate the bio cultures. The area will need to have more monitoring.
1696001926 2019-05-31 Production Wells No Violations This inspection was a follow up to a compliance notice number 470686626, issued on 7/8/14, by ODNR Inspector Randy Akins for a tank leak. Upon arrival on location, accompanied by ODNR Inspector Randy Akins, I witnessed the earthen dike area had been remediated. Vegetation is growing on the inside and outside of the dike area. The production equipment included a steel 100 barrel tank, a plastic 50 barrel tank, two horizonal separators and two chart recorders with 2 x 1 inch orifice plates within an earthen dike. The well was equipped with 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The tubing valves and the casing valves were open. The production tanks were being shared with the Parker 3A ( Permit # 4734 ). The production report was up to date. Proper identification was not present on the new tank. I contacted the well owner to have a new decal put on the tank. He will install the new decals after he paints the new tank.
1959399094 2017-06-28 Production Wells No Violations This is a follow up inspection to a prior oil and brine spill. The dike area has been started with the Bio-remediation. The area has been covered with straw to insulate the bio cultures. The area has had testing and the results are to be forwarded to us by Friday 6/30/2017. The area will need to have more monitoring. A phone call to Allen Tipka for an update.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1478114640 US-OH-113671 2016-11-21 Well operation causing pollution and contamination

For data sources see[9]