X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-157-25416"

m
m
Line 11: Line 11:
 
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]]
 
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]]
 
|-
 
|-
| Municipality: [[Rush_Township,_Tuscarawas_County,_Ohio|Rush Township]]
+
| Municipality: [[Rush Township,_Tuscarawas_County,_Ohio|Rush Township]]
 
|-
 
|-
 
| Operator Name: [[LLP GAS AND OIL CORPORATION]]
 
| Operator Name: [[LLP GAS AND OIL CORPORATION]]

Revision as of 01:37, 15 August 2019

Well Details

Well ID: 34-157-25416
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Rush Township
Operator Name: LLP GAS AND OIL CORPORATION
Well Pad ID:
Farm/Lease Name: PHILLIPS
License Status: Producing
License Date: 2008-09-08
Spud Date: 2008-08-14
Spud Drilling Contractor: G & H DRLG
Final Drill Date: 2008-08-20
Well Total Depth: 5424 ft
Configuration: Vertical
Latitude: 40.322387306
Longitude: -81.38309448

For data sources see[1]

Well History

Well Status Well Status Date Comment
Reached Total Depth 2008-08-20
APP 2008-09-08 Proposed Formations:ORISKANY/CLINTON, Issued Date:9/8/2008, Expired Date:9/8/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Completion Report Received 2008-11-25
Construction Permit Expires 2009-09-08
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-01-13 5152 5210 28

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 3000 Bbl 25700

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 LLP GAS AND OIL CORPORATION 0 466 365
2009 LLP GAS AND OIL CORPORATION 5663 1149 365
2010 LLP GAS AND OIL CORPORATION 2601 719 365
2011 LLP GAS AND OIL CORPORATION 1951 571 365
2012 LLP GAS AND OIL CORPORATION 0 0 366
2013 LLP GAS AND OIL CORPORATION 1424 350 365
2014 LLP GAS AND OIL CORPORATION 1040 306 365
2015 LLP GAS AND OIL CORPORATION 1001 309 365
2016 LLP GAS AND OIL CORPORATION 976 199 365
2017 LLP GAS AND OIL CORPORATION 898 228 365
2018 LLP GAS AND OIL CORPORATION 1039 232 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 LLP GAS AND OIL CORPORATION Brine 510 365
2009 LLP GAS AND OIL CORPORATION Brine 375 365
2010 LLP GAS AND OIL CORPORATION Brine 140 365
2011 LLP GAS AND OIL CORPORATION Brine 370 365
2012 LLP GAS AND OIL CORPORATION Brine 0 366
2013 LLP GAS AND OIL CORPORATION Brine 40 365
2014 LLP GAS AND OIL CORPORATION Brine 0 365
2015 LLP GAS AND OIL CORPORATION Brine 110 365
2016 LLP GAS AND OIL CORPORATION Brine 0 365
2017 LLP GAS AND OIL CORPORATION Brine 0 365
2018 LLP GAS AND OIL CORPORATION Brine 175 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0325699819 2009-10-26 Preliminary Restoration No Violations no violations
0874669186 2016-02-01 Production Wells No Violations On the day of my inspection I found an 8 X 4 inch wellhead and a 4 X 2 inch wellhead with 2 inch tubing and rods, operated by pumping unit with an electric motor. The valves are in the open position. The tank battery is made up of one 210 bbl. tank, a vertical separator, a 30 bbl. brine tank, and a recording gauge, all in an earthen dike. The production reporting is up to date. There are no violations at this time.
1473999696 2009-10-26 Preliminary Restoration No Violations restoration approved

For data sources see[9]

References