If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Medina_County,_Ohio|Medina]] | | County: [[Medina_County,_Ohio|Medina]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Sharon Township,_Medina_County,_Ohio|Sharon Township]] |
|- | |- | ||
| Operator Name: [[HEHNS QUALITY GARDENS INC]] | | Operator Name: [[HEHNS QUALITY GARDENS INC]] |
Well ID: 34-103-23043 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.072448443,"lon":-81.73715586,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Sharon Township | |
Operator Name: HEHNS QUALITY GARDENS INC | |
Well Pad ID: | |
Farm/Lease Name: BURR & DIXON | |
License Status: Producing | |
License Date: 1982-09-13 | |
Spud Date: 1982-11-10 | |
Spud Drilling Contractor: [[HESS DRLG [H & H DRLG]]] | |
Final Drill Date: 1982-12-12 | |
Well Total Depth: 3790 ft | |
Configuration: Vertical | |
Latitude: 41.072448443 | |
Longitude: -81.73715586 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-09-13 | Issued Date 9/13/82 Expired Date 3/1/83 Acres 0030500 Tool Type CT Proposed Formation CLINTON Proposed Depth 03790 Proposed Drill Depth 03790 |
Original Spud | 1982-11-10 | |
Completed | 1982-12-12 | |
Reached Total Depth | 1982-12-12 | |
CO | 1982-12-27 | 646 COASTAL PETROLEUM CORP GeoDate 9/13/82 |
Construction Permit Expires | 1983-03-01 | |
Completion Report Received | 1983-03-07 | |
CO | 1992-11-06 | 2348 TRIAD RESOURCES INC GeoDate 9/13/82 |
CO | 1996-04-04 | 1217 HARRISON ENERGY GeoDate 9/13/82 |
Change of Owner | 2004-04-19 | Operator changed from 1217, HARRISON ENERGY to 6886, HEHNS QUALITY GARDENS INC. |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3622 | 2 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 0 | 50000 | FRAC: N2, 50M SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | TRIAD RESOURCES INC | 287 | 237 | 365 |
1992 | TRIAD RESOURCES INC | 354 | 81 | 365 |
1993 | TRIAD RESOURCES INC | 587 | 66 | 365 |
1994 | TRIAD RESOURCES INC | 379 | 39 | 365 |
1995 | TRIAD RESOURCES INC | 213 | 48 | 365 |
1997 | HARRISON ENERGY | 260 | 0 | 180 |
1998 | HARRISON ENERGY | 913 | 0 | 365 |
1999 | HARRISON ENERGY | 1267 | 0 | 365 |
2000 | HARRISON ENERGY | 0 | 0 | 365 |
2005 | HEHNS QUALITY GARDENS INC | 61 | 77 | 65 |
2006 | HEHNS QUALITY GARDENS INC | 455 | 50 | 365 |
2007 | HEHNS QUALITY GARDENS INC | 583 | 60 | 365 |
2008 | HEHNS QUALITY GARDENS INC | 1238 | 0 | 365 |
2009 | HEHNS QUALITY GARDENS INC | 678 | 68 | 365 |
2010 | HEHNS QUALITY GARDENS INC | 226 | 50 | 365 |
2012 | HEHNS QUALITY GARDENS INC | 280 | 20 | 366 |
2013 | HEHNS QUALITY GARDENS INC | 330 | 0 | 180 |
2014 | HEHNS QUALITY GARDENS INC | 330 | 0 | 365 |
2015 | HEHNS QUALITY GARDENS INC | 330 | 0 | 365 |
2016 | HEHNS QUALITY GARDENS INC | 330 | 0 | 365 |
2017 | HEHNS QUALITY GARDENS INC | 120 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | TRIAD RESOURCES INC | Brine | 0 | 365 |
1992 | TRIAD RESOURCES INC | Brine | 0 | 365 |
1993 | TRIAD RESOURCES INC | Brine | 40 | 365 |
1994 | TRIAD RESOURCES INC | Brine | 40 | 365 |
1995 | TRIAD RESOURCES INC | Brine | 0 | 365 |
1997 | HARRISON ENERGY | Brine | 0 | 180 |
1998 | HARRISON ENERGY | Brine | 0 | 365 |
1999 | HARRISON ENERGY | Brine | 0 | 365 |
2000 | HARRISON ENERGY | Brine | 0 | 365 |
2005 | HEHNS QUALITY GARDENS INC | Brine | 25 | 65 |
2006 | HEHNS QUALITY GARDENS INC | Brine | 35 | 365 |
2007 | HEHNS QUALITY GARDENS INC | Brine | 0 | 365 |
2008 | HEHNS QUALITY GARDENS INC | Brine | 57 | 365 |
2009 | HEHNS QUALITY GARDENS INC | Brine | 34 | 365 |
2010 | HEHNS QUALITY GARDENS INC | Brine | 30 | 365 |
2012 | HEHNS QUALITY GARDENS INC | Brine | 0 | 366 |
2013 | HEHNS QUALITY GARDENS INC | Brine | 0 | 180 |
2014 | HEHNS QUALITY GARDENS INC | Brine | 0 | 365 |
2015 | HEHNS QUALITY GARDENS INC | Brine | 0 | 365 |
2016 | HEHNS QUALITY GARDENS INC | Brine | 0 | 365 |
2017 | HEHNS QUALITY GARDENS INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000PL11952 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
1001441272 | 2014-07-25 | Production Wells | No Violations | Visited location on 07/25/2014 to follow-up on gas leak repairs. Spoke with Pyramid Pipeline regarding status of repair operations. OUPS only marked lines on one side of the road, rather than both as needed, therefore repairs cannot take place until next week. Repair progress will be monitored. |
1233985156 | 2014-07-22 | Production Wells | No Violations | Inspected production well on 07/22/2014 to follow-up on a gas leak at the gasline marker at 7330 State Rd. A gurgling and odor of gas was noted by the landowner and reported to the local fire department on 07/21/2014. The owner was notified and the well and all of their other wells in the area were shut-in. Pyramid Pipeline has been contracted to repair the line by the owner. OUPS was notified of the impending repair and will need 48 hours to get the line marked. The tank battery consists of 1-210 bbl steel tank, 1-25 bbl steel tank, and 1-vertical separator located within an overgrown earthen dike. The well is equipped with a pump jack with an electric motor. No well identification is posted at either the tank battery or the wellhead as required, but Dave Pekarek, the pumper, was notified onsite at another well later in the day, and will get proper identification posted directly. Repairs to the well will be monitored. |
For data sources see[9]