If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Guernsey_County,_Ohio|Guernsey]] | | County: [[Guernsey_County,_Ohio|Guernsey]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Londonderry Township,_Guernsey_County,_Ohio|Londonderry Township]] |
|- | |- | ||
| Operator Name: [[ECLIPSE RESOURCES I LP]] | | Operator Name: [[ECLIPSE RESOURCES I LP]] | ||
Line 33: | Line 33: | ||
| Configuration: Horizontal | | Configuration: Horizontal | ||
|- | |- | ||
− | | Latitude: | + | | Latitude: <Latitude> |
|- | |- | ||
| Longitude: -81.26489724 | | Longitude: -81.26489724 |
Well ID: 34-059-24411 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.084732735,"lon":-81.26489724,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Londonderry Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001087 | |
Farm/Lease Name: ABE TROYER | |
License Status: Producing | |
License Date: 2014-08-08 | |
Spud Date: 2014-09-24 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-11-11 | |
Well Total Depth: 16004 ft | |
Configuration: Horizontal | |
Latitude: <Latitude> | |
Longitude: -81.26489724 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-08-08 | Proposed Formations:POINT PLEASANT, Issued Date:8/8/2014, Expired Date:8/7/2016 12:00:00 PM, Drilling unit acres:698.607, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-11-11 | |
Construction Permit Expires | 2016-08-07 | |
Completion Report Received | 2017-05-23 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-05-30 | 8597 | 8450 | 36 |
2017-05-30 | 15539 | 15621 | 36 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/17/2016 | 12/03/2016 | 7929 | 17,044,500.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 |
SAND-COMMON WHITE-100 MESH, SSA-2 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.244617 | 393677 | |
FDP-S1225-15 | Halliburton | Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 88.2218 | 141,981,000.0 | |
Hydrochloric acid | 7647-01-0 | 15 | 0.0366158 | 58928 | ||||
Glycerine | 56-81-5 | 5 | 0.00002548 | 41 | ||||
Ethylene oxide | 75-21-8 | 0.01 | 0.00000062 | 1 | ||||
Acetic acid | 64-19-7 | 60 | 0.000646842 | 1041 | ||||
Olefins | Proprietary | 5 | 0.00005468 | 88 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 11.5321 | 18,559,200.0 | ||||
Methanol | 67-56-1 | 60 | 0.000265323 | 427 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00004474 | 72 | ||||
Reaction product of acetophenone, formaldehyde, thiourea and oleic acid in dimethyl formamide | 68527-49-1 | 30 | 0.000132972 | 214 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000132972 | 214 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000132972 | 214 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00106937 | 1721 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00002548 | 41 | ||||
Alcohols, C12-13, ethoxylated | 66455-14-9 | 30 | 0.000154099 | 248 | ||||
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-11-17 | H2O | 15 | 406047 Gal | 385800 | Halliburton | STAGE 1/48
STAGES 2-47 SEE IMAGES |
2016-12-03 | H2O | 15 | 315848 Gal | 381300 | Halliburton | STAGE 48/48
STAGES 2-47 SEE IMAGES |
0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | 1204039 | 153049 | 352 |
2018 | ECLIPSE RESOURCES I LP | 812965 | 47667 | 362 |
2019 | ECLIPSE RESOURCES I LP | 138563 | 6446 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | Brine | 24208 | 352 |
2018 | ECLIPSE RESOURCES I LP | Brine | 12909 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 2073 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0358980296 | 2018-10-04 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of eight 400-barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one combustor. Identification was located on the well. |
0399416860 | 2017-01-10 | Completion Testing | No Violations | The well was equipped with a plunger lift system with valves in the closed position with annular pressure monitoring in place. Tetra Technologies was onsite setting flowback equipment with flowback to begin on Friday. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 6H and 8H. I met with Consultant Cristo Giannareas and completed walk around revealing installation of production equipment was on going. |
0495152550 | 2017-06-06 | Production Wells | No Violations | The well was equipped with a plunger lift system with valves in the open position. Gauges present read 1990pounds per square inch on the casing and 2240 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 6H and 8H. |
0597484580 | 2019-05-20 | Production Wells | No Violations | The purpose of my inspection was a status check. On 4/25/2019 inspection found two slips have developed along the access road and on the topsoil stockpile. I contacted ODNR horizontal well pad Engineer Mark Atkinson and made him aware of the problem areas. During my inspection today the slips remain but have not increased in severability. The current slips will not effect pad stability and performance. |
0611060016 | 2016-10-24 | Completion Testing | No Violations | On the day of my inspection following up on Complaint ID 5456, I witnessed the well was equipped with a Sweco tubing head and a FMH frac valve stack with all valves in the closed position. I met with Eclipse Consultant Will Ochampaugh who stated the well has not been fraced yet and completed walk around revealing proper secondary containment was in place. I then reviewed the bond log for the 5.5 inch casing provided by Nine Wireline revealing the production casing was cemented in accordance with OAC 1501:9-1-08 (7) (a) (i). |
0660568842 | 2018-07-10 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 400 barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one flare. Identification was located on the well. |
0663091212 | 2017-09-11 | Production Wells | No Violations | The well was equipped with a plunger lift system with valves in the open position. Gauges present read 1630 pounds per square inch on the casing and 1230 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 6H and 8H. |
0929033300 | 2015-04-09 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
1438553194 | 2014-10-26 | Casing String Witnessed | No Violations | I was onsite to witness the cementing of the surface casing. When I arrived onsite they were washing down the last 15ft of pipe. Nomac 359 has ran there 13-5/8 surface casing to a depth of 1408. Halliburton was onsite to cement the pipe back to the surface. They used a total of 1435sks of cement with 32bbls return to the surface. |
For data sources see[10]