If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Morrow_County,_Ohio|Morrow]] | | County: [[Morrow_County,_Ohio|Morrow]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Congress Township,_Morrow_County,_Ohio|Congress Township]] |
|- | |- | ||
| Operator Name: [[OHIO PRODUCTION CORP]] | | Operator Name: [[OHIO PRODUCTION CORP]] |
Well ID: 34-117-23929 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.557399766,"lon":-82.73697891,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morrow | |
Municipality: Congress Township | |
Operator Name: OHIO PRODUCTION CORP | |
Well Pad ID: | |
Farm/Lease Name: DUMBAUGH PHILLIP S & CLARA L | |
License Status: Final Restoration | |
License Date: 1989-08-28 | |
Spud Date: 1989-09-28 | |
Spud Drilling Contractor: COSHOCTON PIPE | |
Final Drill Date: 1989-10-05 | |
Well Total Depth: 3828 ft | |
Configuration: Vertical | |
Latitude: 40.557399766 | |
Longitude: -82.73697891 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1989-08-28 | 3243 OHIO PRODUCTION CORP GeoDate 8/28/89 |
Oil and Gas | 1989-08-28 | Issued Date 8/28/89 Expired Date 8/28/90 Acres 0020000 Tool Type RTAF Proposed Formation TREMPEALEAU Proposed Depth 03828 Proposed Drill Depth 03828 |
Original Spud | 1989-09-28 | |
Completed | 1989-10-05 | |
Reached Total Depth | 1989-10-05 | |
Plugged/Abandoned | 1989-10-07 | |
Completion Report Received | 1989-10-17 | |
Construction Permit Expires | 1990-08-28 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3746 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | DRY HOLE-NOT TREATED |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000DP6525 | Final Restoration | No Violations | Final Restoration done information from Data Point |
For data sources see[5]