X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-133-23616"

m
m
Line 11: Line 11:
 
| County: [[Portage_County,_Ohio|Portage]]
 
| County: [[Portage_County,_Ohio|Portage]]
 
|-
 
|-
| Municipality: [[Deerfield_Township,_Portage_County,_Ohio|Deerfield Township]]
+
| Municipality: [[Deerfield Township,_Portage_County,_Ohio|Deerfield Township]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]

Revision as of 15:42, 15 August 2019

Well Details

Well ID: 34-133-23616
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Deerfield Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: COBB M UNIT
License Status: Producing
License Date: 1987-08-25
Spud Date: 1988-01-13
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1988-01-18
Well Total Depth: 5144 ft
Configuration: Vertical
Latitude: 41.024093282
Longitude: -81.00893545

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1987-08-25 Issued Date 8/25/87 Expired Date 8/24/88 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05144 Proposed Drill Depth 05144
Original Spud 1988-01-13
Completed 1988-01-18
Reached Total Depth 1988-01-18
CO 1988-02-25 84 EVERFLOW EASTERN PTNS L P GeoDate 8/25/87
Completion Report Received 1988-02-29
Construction Permit Expires 1988-08-24
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4842 4971 0
2006-09-11 4877 4937 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 121190 Gal 65000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1989 EVERFLOW EASTERN PTNS L P 71564 2854 365
1990 EVERFLOW EASTERN PTNS L P 51955 1683 365
1991 EVERFLOW EASTERN PTNS L P 39276 1241 365
1992 EVERFLOW EASTERN PTNS L P 30523 1076 365
1993 EVERFLOW EASTERN PTNS L P 22248 991 365
1994 EVERFLOW EASTERN PTNS L P 22578 1072 365
1995 EVERFLOW EASTERN PTNS L P 25617 1157 365
1996 EVERFLOW EASTERN PTNS L P 19312 641 365
1997 EVERFLOW EASTERN PTNS L P 15879 688 365
1998 EVERFLOW EASTERN PTNS L P 12114 582 365
1999 EVERFLOW EASTERN PTNS L P 12393 591 365
2000 EVERFLOW EASTERN PTNS L P 13703 657 365
2001 EVERFLOW EASTERN PTNS L P 11545 347 365
2002 EVERFLOW EASTERN PTNS L P 9811 525 365
2003 EVERFLOW EASTERN PTNS L P 9263 340 365
2004 EVERFLOW EASTERN PTNS L P 8167 329 365
2005 EVERFLOW EASTERN PTNS L P 7786 334 365
2006 EVERFLOW EASTERN PTNS L P 8500 331 1
2007 EVERFLOW EASTERN PTNS L P 8340 322 365
2008 EVERFLOW EASTERN PTNS L P 7436 335 365
2009 EVERFLOW EASTERN PTNS L P 7552 142 365
2010 EVERFLOW EASTERN PTNS L P 8693 236 365
2011 EVERFLOW EASTERN PTNS L P 8488 214 365
2012 EVERFLOW EASTERN PTNS L P 7588 268 366
2013 EVERFLOW EASTERN PTNS L P 7327 236 365
2014 EVERFLOW EASTERN PTNS L P 7340 157 365
2015 EVERFLOW EASTERN PTNS L P 5293 134 365
2016 EVERFLOW EASTERN PTNS L P 6255 131 365
2017 EVERFLOW EASTERN PTNS L P 5956 265 365
2018 EVERFLOW EASTERN PTNS L P 5526 152 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1989 EVERFLOW EASTERN PTNS L P Brine 570 365
1990 EVERFLOW EASTERN PTNS L P Brine 85 365
1991 EVERFLOW EASTERN PTNS L P Brine 0 365
1992 EVERFLOW EASTERN PTNS L P Brine 120 365
1993 EVERFLOW EASTERN PTNS L P Brine 40 365
1994 EVERFLOW EASTERN PTNS L P Brine 150 365
1995 EVERFLOW EASTERN PTNS L P Brine 100 365
1996 EVERFLOW EASTERN PTNS L P Brine 81 365
1997 EVERFLOW EASTERN PTNS L P Brine 43 365
1998 EVERFLOW EASTERN PTNS L P Brine 39 365
1999 EVERFLOW EASTERN PTNS L P Brine 53 365
2000 EVERFLOW EASTERN PTNS L P Brine 40 365
2001 EVERFLOW EASTERN PTNS L P Brine 35 365
2002 EVERFLOW EASTERN PTNS L P Brine 45 365
2003 EVERFLOW EASTERN PTNS L P Brine 0 365
2004 EVERFLOW EASTERN PTNS L P Brine 50 365
2005 EVERFLOW EASTERN PTNS L P Brine 0 365
2006 EVERFLOW EASTERN PTNS L P Brine 0 1
2007 EVERFLOW EASTERN PTNS L P Brine 17 365
2008 EVERFLOW EASTERN PTNS L P Brine 62 365
2009 EVERFLOW EASTERN PTNS L P Brine 0 365
2010 EVERFLOW EASTERN PTNS L P Brine 50 365
2011 EVERFLOW EASTERN PTNS L P Brine 0 365
2012 EVERFLOW EASTERN PTNS L P Brine 60 366
2013 EVERFLOW EASTERN PTNS L P Brine 0 365
2014 EVERFLOW EASTERN PTNS L P Brine 70 365
2015 EVERFLOW EASTERN PTNS L P Brine 0 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 60 365
2018 EVERFLOW EASTERN PTNS L P Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL5848 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
1989905756 2017-11-17 Production Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped with 2.375 rods and tubing and producing with the aid of an electric powered pumping unit. The wellhead is fenced and locked and the required ID is posted on the fencing. The well produces to a diked tank battery to the north that is fenced and locked. The battery contains one (1) 210 barrel tank, one (1) 50 barrel tank, and a horizontal separator. There is a domestic tap and meter on the sales line equipped with a line heater. The required ID is posted at the tank battery. I found no violations at this time.

For data sources see[9]

References