If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Portage_County,_Ohio|Portage]] | | County: [[Portage_County,_Ohio|Portage]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Deerfield Township,_Portage_County,_Ohio|Deerfield Township]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-133-23645 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.993476382,"lon":-81.01897377,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Deerfield Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: BROWN M UNIT | |
License Status: Producing | |
License Date: 1988-01-08 | |
Spud Date: 1988-01-25 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1988-01-30 | |
Well Total Depth: 5143 ft | |
Configuration: Vertical | |
Latitude: 40.993476382 | |
Longitude: -81.01897377 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1988-01-08 | Issued Date 12/31/87 Expired Date 12/30/88 Acres 0041600 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05143 Proposed Drill Depth 05143 |
Original Spud | 1988-01-25 | |
Completed | 1988-01-30 | |
Reached Total Depth | 1988-01-30 | |
CO | 1988-03-02 | 84 EVERFLOW EASTERN PTNS L P GeoDate 1/8/88 |
Completion Report Received | 1988-03-11 | |
Construction Permit Expires | 1988-12-30 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4885 | 5012 | 0 |
2006-09-11 | 4912 | 4980 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 121240 Gal | 65000 | FRAC: H2O,SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL5831 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0421194968 | 2017-12-14 | Production Wells | No Violations | Status check inspection of this directional Clinton Sandstone well. My inspection found the wellhead fenced and locked. The well is equipped with 1.5 tubing and operating with the aid of a plunger lift system. A gauge on the flow line indicates a pressure of 60psi and the required ID is posted on the fencing. The well produces to a diked tank battery on location and contains one (1) 140 barrel tank, a 50 barrel tank, and a horizontal separator. The battery is fenced and locked and identification is posted on the fencing. I found no violations at this time. |
For data sources see[9]