If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Portage_County,_Ohio|Portage]] | | County: [[Portage_County,_Ohio|Portage]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Deerfield Township,_Portage_County,_Ohio|Deerfield Township]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-133-24122 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.989031529,"lon":-81.09424211,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Deerfield Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: SHINN | |
License Status: Producing | |
License Date: 1997-05-21 | |
Spud Date: 1997-06-26 | |
Spud Drilling Contractor: IPSCO | |
Final Drill Date: 1997-07-02 | |
Well Total Depth: 5170 ft | |
Configuration: Directional | |
Latitude: 40.989031529 | |
Longitude: -81.09424211 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1997-05-21 | 198 VIKING RESOURCES CORP GeoDt 5/21/97 |
Oil and Gas | 1997-05-21 | Issued Date 5/21/97 Expired Date 5/21/98 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth |
Original Spud | 1997-06-26 | RBDMS Rec |
Completed | 1997-07-02 | RBDMS Rec |
Reached Total Depth | 1997-07-02 | RBDMS Rec |
Completion Report Received | 1997-07-30 | RBDMS Rec |
Correction to Well | 1997-08-08 | Change in TARGET FOOTAGE: 713'SL & 662'EL OF LOT 60. Change in Coordinates: X=2,388,835 Y= 485,233. |
Change of Owner | 2014-04-04 | Operator changed from 198, VIKING RESOURCES LLC to 84, EVERFLOW EASTERN PTNS L P |
Record Last Modified | 2019-06-14 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-10-08 | 4940 | 5036 | 51 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 118604 Gal | 100500 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0884886291 | 2018-03-13 | Production Wells | No Violations | Status check inspection of this directional Clinton Sandstone well. My inspection found the wellhead fenced and equipped with 1.5 tubing and a plunger lift system. There is a domestic tap and meter plumbed to the 4.5 production casing port. This well produces to a diked tank battery to the southwest across the road (Stark County) and is shared with the Shinn #1 (PN#151-24210). The battery is fenced and locked and contains dedicated equipment for each well consisting of two (2) 100 barrel tanks, two (2) 50 barrel tanks, and two (2) horizontal separators. The required ID is posted at the wellhead and at the tank battery. No violations. |
For data sources see[9]