X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-133-24220"

m
m
Line 11: Line 11:
 
| County: [[Portage_County,_Ohio|Portage]]
 
| County: [[Portage_County,_Ohio|Portage]]
 
|-
 
|-
| Municipality: [[Edinburg_Township,_Portage_County,_Ohio|Edinburg Township]]
+
| Municipality: [[Edinburg Township,_Portage_County,_Ohio|Edinburg Township]]
 
|-
 
|-
 
| Operator Name: [[C & T ENERGY OF EAST CANTON IN]]
 
| Operator Name: [[C & T ENERGY OF EAST CANTON IN]]

Revision as of 16:51, 15 August 2019

Well Details

Well ID: 34-133-24220
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Edinburg Township
Operator Name: C & T ENERGY OF EAST CANTON IN
Well Pad ID:
Farm/Lease Name: EHASZ
License Status: Final Restoration
License Date: 2000-03-23
Spud Date: 1998-12-09
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 1998-12-22
Well Total Depth: 7580 ft
Configuration: Vertical
Latitude: 41.083349320
Longitude: -81.15750230

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 1998-11-23 Proposed Formations:KNOX (MAY NOT PRODUCE CLINTON), Issued Date:11/23/98, Expired Date:11/23/99 6:00:00 AM, Drilling unit acres:44.55, Proposed Well Type:OG, Proposed Well Class:EOUT
Original Spud 1998-12-09 DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99
Completed 1998-12-22 DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99
Reached Total Depth 1998-12-22 DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99
Completion Report Received 1999-06-21 DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99
Change of Owner 1999-10-28 Operator changed from 4884, EASTERN STATES OIL & GAS INC to 4969, C & T ENTERPRISES
APP 2000-03-23 Proposed Formations:ROSERUN, Issued Date:3/23/00, Expired Date:3/23/01 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2000-06-05 DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99
Construction Permit Expires 2001-03-23 DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99
Record Last Modified 2013-03-14 DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1999-09-24 7334 7343 28
1999-09-24 7366 7374 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 1251 Bbl 62000 500 GALLONS HCL ACID

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
iDIAN00560 2000-09-13 Final Restoration No Violations

For data sources see[5]

References