X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-019-22229"

m
m
Line 11: Line 11:
 
| County: [[Carroll_County,_Ohio|Carroll]]
 
| County: [[Carroll_County,_Ohio|Carroll]]
 
|-
 
|-
| Municipality: [[Union_Township,_Carroll_County,_Ohio|Union Township]]
+
| Municipality: [[Union Township,_Carroll_County,_Ohio|Union Township]]
 
|-
 
|-
 
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]

Revision as of 18:02, 15 August 2019

Well Details

Well ID: 34-019-22229
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Union Township
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID: US-OH-000319
Farm/Lease Name: BRUNK 32-13-5
License Status: Producing
License Date: 2012-12-20
Spud Date: 2013-01-08
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2013-01-19
Well Total Depth: 12870 ft
Configuration: Horizontal
Latitude: 40.497654838
Longitude: -81.07956785

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-10-01 Proposed Formations:TRENTON/BLACK RIVER, Issued Date:10/1/2012, Expired Date:10/1/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2012-12-20 Proposed Formations:POINT PLEASANT, Issued Date:12/20/2012, Expired Date:12/20/2014 12:00:00 PM, Drilling unit acres:379.94, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-01-11 ADDED MISSING LAT/LONGS TO TARGET INFORMATION.
Reached Total Depth 2013-01-19
Correction to Well 2013-05-31 CORRECTION TO TARGET INFORMATION (FOOTAGE & X,Y COORDINATES ) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 363.61 ACRES.
Completion Report Received 2013-08-22
Construction Permit Expires 2014-12-20
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-09-17 8046 12662 396

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/07/2013 04/09/2013 7925 3,798,650.0 303786

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
Acid, Hydrochloric 15 pct, A264
B244, B317, D047, J218, J475
J580, J609, J610, L058, L071
S001, 100 Mesh Sand, Northern White Sand
SCHLUMBERGER Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Defoaming Agent, Friction Reducer, Gelling Agent, Iron Control Agent, KCl Substitute, Scale Inhibitor, Proppant - Natural Sodium hydroxide 1310-73-2 0 0.00001000 0
Polypropylene glycol 25322-69-4 0 0.00067 0
Siloxanes and Silicones, di-Me, reaction products with silica 67762-90-7 0 0.00001000 0
Prop-2-yn-1-ol 107-19-7 0 0.00007000 0
Water 007732-18-5 3.47 0.55645 0
Hydrogen chloride 7647-01-0 0.82 0.12631 0
Potassium chloride 7447-40-7 0 0.00007000 0
Non-crystalline silica 7631-86-9 0 0.00031 0
Guar gum 9000-30-0 0.61 0.09389 0
Sodium chloride 7647-14-5 0 0.00002000 0
Methanol 67-56-1 0 0.00037 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00001000 0
Polymer of 2-acrylamido-2-methylpropanesulfonic acid sodium salt and methyl acrylate 136793-29-8 0 0.00064 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00003000 0
Urea 57-13-6 0 0.00039 0
Trisodium ortho phosphate 7601-54-9 0 0.00074 0
Octamethylcyclotetrasiloxane 556-67-2 0 0.00001000 0
Sodium sulfate 7757-82-6 0.02 0.00245 0
Diammonium peroxidisulphate 7727-54-0 0.02 0.00341 0
Calcium chloride 10043-52-4 0.01 0.00126 0
Sodium erythorbate 6381-77-7 0 0.00059 0
Alkenes, C>10 a- 64743-02-8 0 0.00005000 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0.00001000 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.0001 0
Cholinium chloride 67-48-1 0.44 0.06792 0
Ethane-1,2-diol 107-21-1 0 0.00021 0
Ammonium sulfate 7783-20-2 0.04 0.00615 0
Decamethyl cyclopentasiloxane 541-02-6 0 0.00001000 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00056 0
Fatty acids, tall-oil 61790-12-3 0 0.00027 0
Glycerol 56-81-5 0.02 0.00376 0
Potassium hydroxide 1310-58-3 0.02 0.00376 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00022 0
Dimethyl siloxanes and silicones 63148-62-9 0 0.00001000 0
Glutaraldehyde 111-30-8 0.04 0.00554 0
Crystalline silica 14808-60-7 97.86 15.1388 0
Potassium borate 1332-77-0 0.07 0.01152 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic acid, sodium salt polymer 38193-60-1 0.04 0.00599 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 1.36054 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 82.6127 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-04-09 H2O 15 7958 Bbl 517400 Schlumberger STAGE 10

36 SHOTS

2013-04-07 H2O 15 7554 Bbl 512141 Schlumberger STAGE 2

36 SHOTS

2013-04-08 H2O 15 7574 Bbl 508321 Schlumberger STAGE 4

36 SHOTS

15 0 0 Schlumberger
15 0 0 Schlumberger
2013-04-08 H2O 15 8194 Bbl 511200 Schlumberger STAGE 8

36 SHOTS

2013-04-09 H2O 15 8011 Bbl 514481 Schlumberger STAGE 11

36 SHOTS

2013-04-08 H2O 15 8240 Bbl 50990 Schlumberger STAGE 3

36 SHOTS

2013-04-09 H2O 15 8173 Bbl 513561 Schlumberger STAGE 9

36 SHOTS

2013-04-08 H2O 15 8354 Bbl 510181 Schlumberger STAGE 7

36 SHOTS

2013-04-08 H2O 15 7716 Bbl 508081 Schlumberger STAGE 5

36 SHOTS

2013-04-08 H2O 15 8328 Bbl 511781 Schlumberger STAGE 6

36 SHOTS

15 0 0 Schlumberger
2013-04-07 H2O 15 7899 Bbl 516801 Schlumberger STAGE 1

36 SHOTS

15 0 0 Schlumberger

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC 159350 11280 181
2014 CHESAPEAKE EXPLORATION LLC 157411 9863 326
2015 CHESAPEAKE EXPLORATION LLC 126452 7048 361
2016 CHESAPEAKE EXPLORATION LLC 99499 4466 366
2017 CHESAPEAKE EXPLORATION LLC 82975 3035 350
2018 CHESAPEAKE EXPLORATION LLC 71093 2758 365
2019 CHESAPEAKE EXPLORATION LLC 19366 574 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 6929 181
2014 CHESAPEAKE EXPLORATION LLC Brine 2026 326
2015 CHESAPEAKE EXPLORATION LLC Brine 2336 361
2016 CHESAPEAKE EXPLORATION LLC Brine 1630 366
2017 CHESAPEAKE EXPLORATION LLC Brine 2170 350
2018 CHESAPEAKE EXPLORATION LLC Brine 1336 365
2019 CHESAPEAKE EXPLORATION LLC Brine 303 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0256685676 2017-07-10 Production Wells No Violations I conducted a status check of this well in response to complaint #5646 regarding excessive noise coming from the compressors on the location.. Identification signs were posted at the access road entrance, the well, and the storage tanks. The #8H well is in production and is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. T here were several inches of standing water inside of the tank battery. I test the standing water using a low-range Quantab which concluded in a reading under 30 ppm. The pad is surrounded by a fence and all man doors were locked.

The equipment on the pad consists of the following: 6 producing wells

1 Low pressure vertical separator located inside of dike 6 sand separators 6 gas processing units 1 vapor recovery unit 1 heat treater 3 compressor stations; one located on the south side of the pad with, and two located on the east side of the pad. The two compressors located on the east side of the pad did not have any sound barriers around the units. I will contact Chesapeake and request that sound barriers be installed around the units to mitigate the noise issue.

0280363275 2018-04-25 Production Wells No Violations I conducted a follow-up inspection to complaint #5646 regarding noise from the pad. The surface/intermediate and intermediate/production annular gauges displayed readings of zero psi. No anomalies were observed on the pad. Sound barriers were still installed around the compressor units. The complaint will be closed.
0555005575 2015-10-26 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

1746715862 2017-07-26 Production Wells No Violations I followed-up in response to complaint #5646 regarding noise issues on the pad. Sound barriers had been installed and were present around the two compressors on the east side of the pad. No other changes were made to the well or pad since my last inspection.
1968529423 2014-04-08 Production Wells No Violations I inspected the well site and found the well head to be constructed with a Christmas tree valve and piping. There are six wells at this site. The condensate tanks and piping runs were all intact with no leaks. The spray lined steel containment around the condensate tanks had rain water in it with no visible contamination. The diesel power unit was found to have excess oil in the spill containment under the engine. The pre-heater unit had no visible issues. While I was finishing my inspection, the contractor was there to clean up the oil under the diesel engine. No oil reached the ground. The lease road is stable condition and the site is well secured with two locked gates. No violations were found.

For data sources see[10]

References