If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Carroll_County,_Ohio|Carroll]] | | County: [[Carroll_County,_Ohio|Carroll]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Lee Township,_Carroll_County,_Ohio|Lee Township]] |
|- | |- | ||
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]] | | Operator Name: [[CHESAPEAKE EXPLORATION LLC]] |
Well ID: 34-019-22283 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.503446453,"lon":-80.99168243,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Lee Township | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: US-OH-000524 | |
Farm/Lease Name: ENOLD 3-13-5 | |
License Status: Producing | |
License Date: 2013-04-17 | |
Spud Date: 2013-04-21 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-05-05 | |
Well Total Depth: 14493 ft | |
Configuration: Horizontal | |
Latitude: 40.503446453 | |
Longitude: -80.99168243 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-12-06 | 8756 CHESAPEAKE EXPLORATION LLC Proposed Formation TRENTON-BLACK RIVER Issued Date 12/6/2012 Expired Date 12/6/2014 12:00:00 PM |
APP | 2013-04-17 | Proposed Formations:POINT PLEASANT, Issued Date:4/17/2013, Expired Date:4/17/2015 12:00:00 PM, Drilling unit acres:405.38, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2013-05-05 | |
Correction to Well | 2014-02-07 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-07-25 | |
Correction to Well | 2014-07-25 | CHANGE IN TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2015-04-17 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-07-25 | 8814 | 14182 | 600 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/09/2014 | 03/15/2014 | 8118 | 5,089,180.0 | 376277 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 2.96247 | 0 |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 82.3581 | 0 | |
A264, B244, B317, J218, J475, J580
J609, J610, L058, Acid, Hydrochloric 15 pct Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Sodium erythorbate | 6381-77-7 | 0 | 0.00065 | 0 | |
Glycerol | 56-81-5 | 0.05 | 0.00658 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 0 | 0.00012 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00001000 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.00018 | 0 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0 | 0.00008000 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.05 | 0.00746 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.00065 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.03 | 0.00424 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
Guar gum | 9000-30-0 | 0.52 | 0.07431 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0.00001000 | 0 | ||||
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen phosphate), sodium salt | 68171-29-9 | 0.01 | 0.00175 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0.01 | 0.00077 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00003000 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic acid, sodium salt polymer | 38193-60-1 | 0.05 | 0.00693 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0.01 | 0.00083 | 0 | ||||
Sodium hydroxide | 1310-73-2 | 0 | 0 | 0 | ||||
Urea | 57-13-6 | 0 | 0.00046 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.00039 | 0 | ||||
Potassium borate | 1332-77-0 | 0.14 | 0.02018 | 0 | ||||
Non-crystalline silica | 7631-86-9 | 0 | 0.00027 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.00048 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.05 | 0.00655 | 0 | ||||
Crystalline silica | 14808-60-7 | 97.64 | 14.0297 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.04 | 0.00572 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0.00001000 | 0 | ||||
Ethane-1,2-diol | 107-21-1 | 0 | 0.00022 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic acid sodium salt and methyl acrylate | 136793-29-8 | 0.01 | 0.00074 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Sodium sulfate | 7757-82-6 | 0.02 | 0.00283 | 0 | ||||
Siloxanes and Silicones, di-Me, reaction products with silica | 67762-90-7 | 0 | 0 | 0 | ||||
Hydrogen chloride | 7647-01-0 | 1.42 | 0.20468 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-03-15 | H2O | 15 | 2434 Bbl | 334618 | Schlumberger | STAGE 20/20
30 SHOTS |
2014-03-19 | H2O | 15 | 2863 Bbl | 336721 | Schlumberger | STAGE 1/20
30 SHOTS STAGES 2-19 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 475410 | 16515 | 218 |
2015 | CHESAPEAKE EXPLORATION LLC | 590985 | 4791 | 361 |
2016 | CHESAPEAKE EXPLORATION LLC | 360477 | 3274 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 270512 | 283 | 364 |
2018 | CHESAPEAKE EXPLORATION LLC | 234061 | 155 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 46733 | 22 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 10003 | 218 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 8000 | 361 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 4022 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3764 | 364 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 3704 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 1070 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0202189318 | 2015-11-30 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
0319106249 | 2013-04-02 | Drill / Deepen / Reopen | No Violations | I was on site to check the status of the construction of the well site and lease road. My inspection revealed that the construction crew is finishing the well site and lease road. Nomac 74 is suppose to be moving onto this well site after the conductors are set. No violations at this time. |
0627689796 | 2013-04-22 | Casing String Witnessed | No Violations | I was onsite to witness the cementing of the 13 3/8 surface casing set to 807. Nomac 74 had some trouble establishing circulation earlier in the job with fresh water, they received 2 additional loads of water to ensure the well could be circulated and that there was enough fresh water on site for the cement job. The rig was able to establish circulation and extra fluid loss material was used in the 25 barrel gel spacer. The cement was scaled at 15.7ppg before it was pumped down hole. Circulation was lost from 0-45 barrels, reestablished from 45-85 and then lost again until roughly 38 barrels into displacement. In total 20 barrels of cement weighing 15.3ppg were returned to surface and it was a successful cement job. |
1092466297 | 2013-04-22 | Drill / Deepen / Reopen | No Violations | I was onsite to check the status of the drilling on this location. The rig was at 807 and was preparing to rig up casing crew. They estimate that the surface cement job will start at around 9pm tonight. |
1828941482 | 2016-03-01 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #1H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.
The equipment on the pad consists of the following: 6 - 400 bbl production tanks, three labelled as containing produced water, and three labelled as containing condensate. 1 Low pressure vertical separator located inside the dike 6 Producing wells 6 Sand separators 6 Gas processing units 1 Heat Treater 1 Vapor Recovery Unit |
2010678438 | 2018-12-18 | Production Wells | No Violations | The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed readings of zero psi. I performed a walk-around inspection of the production pad and erosional controls appeared in-place. No violations were observed at the well or production pad at the time of inspection. |
For data sources see[10]