If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| Province: Manitoba | | Province: Manitoba | ||
|- | |- | ||
− | | Division: [[Division No. | + | | Division: [[Division No. 6,_Manitoba|Division No. 6]] |
|- | |- | ||
− | | Subdivision: [[Wallace-Woodworth,_Division No. | + | | Subdivision: [[Wallace-Woodworth,_Division No. 6,_Manitoba|Wallace-Woodworth]] |
|- | |- | ||
| Operator Name: [[Tundra Oil & Gas Limited]] | | Operator Name: [[Tundra Oil & Gas Limited]] |
Well ID: 100.08-34-010-26W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.87676854,"lon":-100.9416283,"icon":""}]} |
Well Name: Tundra Virden HZNTL | |
Country: Canada | |
Province: Manitoba | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2014-12-01 | |
License Date: 2014-10-24 | |
Well Total Depth: 2162 | |
Latitude: 49.87676854 | |
Longitude: -100.9416283 |
For data sources see[1]
Spud Date | Contractor | Rig Number |
---|---|---|
2014-12-01 | Trinidad Drilling Ltd. | D118 |
For data sources see[2]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2014-12-12 | 2143.7 | 2153.8 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 2099.68 | 2109.68 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 2055.52 | 2065.52 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 2011.36 | 2021.36 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1967.21 | 1977.21 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1923.06 | 1933.06 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1878.91 | 1888.91 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1834.77 | 1844.77 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1790.63 | 1800.63 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1746.47 | 1756.47 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1702.34 | 1712.34 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1604.9 | 1614.9 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1476.69 | 1486.69 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1432.54 | 1442.54 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1560.76 | 1560.76 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1388.39 | 1398.39 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1344.26 | 1354.26 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1300.1 | 1310.1 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1255.96 | 1265.96 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1211.8 | 1221.8 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1167.66 | 1177.66 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1123.52 | 1133.52 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1079.35 | 1089.35 | 0 | N/A | 2018-07-09 | |
2014-12-12 | 1035.2 | 1045.2 | 0 | N/A | 2018-07-09 | |
2014-12-13 | 991 | 1001 | 0 | N/A | 2018-07-09 | |
2014-12-13 | 946.9 | 946.9 | 0 | N/A | 2018-07-09 | |
2014-12-13 | 902.7 | 902.7 | 0 | N/A | 2018-07-09 | |
2014-12-13 | 814.4 | 824.4 | 0 | N/A | 2018-07-09 | |
2014-12-13 | 770.2 | 770.2 | 0 | N/A | 2018-07-09 |
For data sources see[3]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2014-12-12 | FRAC | HCL | 0.3 | SAND | 1.5 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 0 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | N/A | SAND | N/A | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | N/A | SAND | N/A | |
2014-12-13 | FRAC | HCL | N/A | SAND | N/A | |
2014-12-13 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-13 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-13 | FRAC | HCL | N/A | SAND | N/A | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 | |
2014-12-12 | FRAC | HCL | 0.3 | SAND | 3 |
For data sources see[4]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2015 | Tundra Oil & Gas Limited | 5,499.40 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 1,914.40 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 1,136.70 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 777.70 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 178.70 | 0 | 0.00 |
For data sources see[5]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2015 | Tundra Oil & Gas Limited | 10,284.60 | 345 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 9,608.30 | 363 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 7,922.80 | 365 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 6,714.50 | 362 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 1,544.70 | 90 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[5]