X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22102"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22102
 
| Well ID: 37-003-22102
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.571574, -79.847302 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.571574, -79.847302 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 05/14/2010
+
| Spud Date: 2010-05-14
 
|-
 
|-
| Permit Date: 2/18/2010
+
| Permit Date: 2010-02-18
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 67: Line 92:
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 76: Line 101:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 85: Line 110:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 103: Line 128:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 121: Line 146:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 130: Line 155:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 139: Line 164:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 151: Line 176:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 156: Line 182:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 240.00 Bbl
 
| style="text-align: right;" | 240.00 Bbl
Line 162: Line 189:
 
|  
 
|  
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 65.00 Bbl
 
| style="text-align: right;" | 65.00 Bbl
Line 168: Line 196:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 174: Line 203:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
Line 180: Line 210:
 
|  
 
|  
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 85.00 Bbl
 
| style="text-align: right;" | 85.00 Bbl
Line 186: Line 217:
 
|  
 
|  
 
|-
 
|-
| 2012-0
+
| 2012
 +
| [[MARCO DRILLING INC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 105.00 Bbl
 +
| ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
Line 192: Line 231:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2012-0
+
| 2013
| Produced Fluid (in Barrels)
+
| [[MARCO DRILLING INC]]
| style="text-align: right;" | 105.00 Bbl
 
| ROAD SPREADING
 
|
 
|-
 
| 2013-0
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 4,620.00 Bbl
 
| style="text-align: right;" | 4,620.00 Bbl
Line 204: Line 238:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2016-0
+
| 2016
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 349.00 Bbl
 
| style="text-align: right;" | 349.00 Bbl
Line 210: Line 245:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2017-0
+
| 2017
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 182.00 Bbl
 
| style="text-align: right;" | 182.00 Bbl
Line 216: Line 252:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2018-0
+
| 2018
 +
| [[MARCO DRILLING INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 119.00 Bbl
 
| style="text-align: right;" | 119.00 Bbl
Line 241: Line 278:
 
| 1875602
 
| 1875602
 
| Primary Facility
 
| Primary Facility
| 04/08/2010
+
| 2010-04-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 248: Line 285:
 
| 1885611
 
| 1885611
 
| Primary Facility
 
| Primary Facility
| 05/19/2010
+
| 2010-05-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 255: Line 292:
 
| 1890199
 
| 1890199
 
| Primary Facility
 
| Primary Facility
| 05/27/2010
+
| 2010-05-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 262: Line 299:
 
| 1894980
 
| 1894980
 
| Primary Facility
 
| Primary Facility
| 05/19/2010
+
| 2010-05-19
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 269: Line 306:
 
| 1895131
 
| 1895131
 
| Primary Facility
 
| Primary Facility
| 05/25/2010
+
| 2010-05-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 276: Line 313:
 
| 1895144
 
| 1895144
 
| Primary Facility
 
| Primary Facility
| 06/03/2010
+
| 2010-06-03
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 283: Line 320:
 
| 1895145
 
| 1895145
 
| Primary Facility
 
| Primary Facility
| 05/28/2010
+
| 2010-05-28
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 290: Line 327:
 
| 1895148
 
| 1895148
 
| Primary Facility
 
| Primary Facility
| 06/14/2010
+
| 2010-06-14
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 297: Line 334:
 
| 1895156
 
| 1895156
 
| Primary Facility
 
| Primary Facility
| 06/11/2010
+
| 2010-06-11
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 304: Line 341:
 
| 1902494
 
| 1902494
 
| Primary Facility
 
| Primary Facility
| 07/01/2010
+
| 2010-07-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 339: Line 376:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 06:58, 19 August 2019

Well Details

Well ID: 37-003-22102
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Indiana Township
Operator Name: MARCO DRILLING INC
Well Pad ID:
Farm/Lease Name: CHARLES L VOGLE ETUX 1
License Status: Active
Spud Date: 2010-05-14
Permit Date: 2010-02-18
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.571574
Longitude: -79.847302

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MARCO DRILLING INC 443.00 90 362.40 90 0.00 0
2011 MARCO DRILLING INC 358.61 365 157.14 365 0.00 0
2012 MARCO DRILLING INC 502.80 365 237.04 365 0.00 0
2013 MARCO DRILLING INC 596.00 365 0.00 0 0.00 0
2014 MARCO DRILLING INC 527.00 365 88.71 365 0.00 0
2015 MARCO DRILLING INC 109.00 365 0.00 0 0.00 0
2016 MARCO DRILLING INC 603.00 365 125.88 365 0.00 0
2017 MARCO DRILLING INC 487.00 365 64.00 365 0.00 0
2018 MARCO DRILLING INC 453.00 365 58.00 365 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 MARCO DRILLING INC Produced Fluid (in Barrels) 240.00 Bbl ROAD SPREADING
2011 MARCO DRILLING INC Produced Fluid (in Barrels) 65.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 MARCO DRILLING INC Produced Fluid (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 MARCO DRILLING INC Produced Fluid (in Barrels) 70.00 Bbl ROAD SPREADING
2011 MARCO DRILLING INC Produced Fluid (in Barrels) 85.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2012 MARCO DRILLING INC Produced Fluid (in Barrels) 105.00 Bbl ROAD SPREADING
2012 MARCO DRILLING INC Produced Fluid (in Barrels) 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 MARCO DRILLING INC Produced Fluid (in Barrels) 4,620.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 MARCO DRILLING INC Produced Fluid (in Barrels) RWC 802 349.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017 MARCO DRILLING INC Produced Fluid (in Barrels) RWC 802 182.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2018 MARCO DRILLING INC Produced Fluid (in Barrels) RWC 802 119.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1875602 Primary Facility 2010-04-08 Routine/Complete Inspection No Violations Noted On April 8, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. The well site is proposed to be constructed within 100 ft. from Long Run. Well was site staked. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained. Drill cuttings are to be encapsulated. Operator must ensure that the bottom of the pit is at least 20 inches above the seasonal high groundwater table.
1885611 Primary Facility 2010-05-19 Routine/Complete Inspection No Violations Noted On May 19, 2010 I conducted a routine inspecion of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were present. E&S controls were in place and constructed according to the plan on site. The pits appeared to be in good condition. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved.
1890199 Primary Facility 2010-05-27 Routine/Complete Inspection No Violations Noted On May 27, 2010 I conducted a routine inspecion of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were present. E&S controls were in place and constructed according to the plan on site. The pits appeared to be in good condition. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.
1894980 Primary Facility 2010-05-19 Drilling/Alteration No Violations Noted SITE,PIT,OK.DRILLING AT 840'.
1895131 Primary Facility 2010-05-25 Drilling/Alteration No Violations Noted USE RIG 5 RUNNING DRILL RODS AFTER BIT CHANGE.HOLE AT 1584 FT.
1895144 Primary Facility 2010-06-03 Drilling/Alteration No Violations Noted NEIGHBOR SAID SHE WAS CONCERNED THAT SOME DUST OR MIST HAD TRAVED ONTO HER PROPERTY.THE RIG WAS GONE WHEN I ARRIVED.I WIPED THE SIDE OF HER HOUSE WITH A PAPER TOWEL AND IT WAS CLEAN. I TALKED TO OPERATOR AND THEN THE NEIGHBOR AND TOLD HIM THAT THERE WERE NO CHEMICALS USED WHILE DRILLING.
1895145 Primary Facility 2010-05-28 Drilling/Alteration No Violations Noted DRILLING COMPLETE.TD 3250 ft.USE RIG 5 WAITING FOR LOGGING TRUCK.
1895148 Primary Facility 2010-06-14 Drilling/Alteration No Violations Noted I RECIEVED CALL FROM CONCERN NEIGHBOR.SHE WAS WORRIED ABOUT A LOUD NOISE AND HISSING SOUND SHE THOUGHT CAME FROM DRILLING SITE.THE LOUD NOISE WAS CREW BLOWING DOWN WELL BEFORE RUNNING TUBING INTO THE WELL.
1895156 Primary Facility 2010-06-11 Drilling/Alteration No Violations Noted DRILLING COMPLETE. USE RIG 5 HAS MOVED OFF THE SITE. PIT IS GONE,AND THE SITE IS BEING GRADED.
1902494 Primary Facility 2010-07-01 Routine/Complete Inspection No Violations Noted On July 1st, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The access road was in good condition. A site ID sign and E&S plan were present. E&S controls were in place and constructed according to the plan on site. The pits were closed and filled. A pump jack and various piping was being installed. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.

For data sources see[6]

References