If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 149: | Line 149: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 154: | Line 155: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2013 | + | | 2013 |
+ | | [[PIERCE & PETERSEN]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 698.50 Bbl | | style="text-align: right;" | 698.50 Bbl | ||
Line 160: | Line 162: | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
+ | | [[PIERCE & PETERSEN]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 940.60 Bbl | | style="text-align: right;" | 940.60 Bbl | ||
Line 166: | Line 169: | ||
| PA0102784 | | PA0102784 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
+ | | [[PIERCE & PETERSEN]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 14.36 Bbl | | style="text-align: right;" | 14.36 Bbl | ||
Line 172: | Line 176: | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[PIERCE & PETERSEN]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 14.96 Bbl | | style="text-align: right;" | 14.96 Bbl | ||
Line 178: | Line 183: | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[PIERCE & PETERSEN]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7.85 Bbl |
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
− | | | + | | PA0101508 |
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[PIERCE & PETERSEN]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 5.00 Bbl |
| CENT WASTE TRT FAC NPDES DISCHARGE | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
− | | | + | | 001-A |
|- | |- | ||
|} | |} |
Well ID: 37-123-46896 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.82975,"lon":-79.051986,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Mead Township | |
Operator Name: PIERCE & PETERSEN | |
Well Pad ID: | |
Farm/Lease Name: UPPER FUNK 138 | |
License Status: Active | |
Spud Date: 2013-03-21 | |
Permit Date: 2012-07-18 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.829750 | |
Longitude: -79.051986 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | PIERCE & PETERSEN | 204.02 | 365 | 22.94 | 365 | 0.00 | 0 |
2014 | PIERCE & PETERSEN | 232.89 | 365 | 23.96 | 365 | 0.00 | 0 |
2015 | PIERCE & PETERSEN | 161.40 | 365 | 16.58 | 365 | 0.00 | 0 |
2016 | PIERCE & PETERSEN | 161.01 | 366 | 19.33 | 366 | 0.00 | 0 |
2017 | PIERCE & PETERSEN | 160.52 | 365 | 19.37 | 365 | 0.00 | 0 |
2018 | PIERCE & PETERSEN | 142.59 | 365 | 15.95 | 365 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | PIERCE & PETERSEN | Produced Fluid (in Barrels) | 698.50 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | PIERCE & PETERSEN | Produced Fluid (in Barrels) | 940.60 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2016 | PIERCE & PETERSEN | Produced Fluid (in Barrels) RWC 802 | 14.36 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2017 | PIERCE & PETERSEN | Produced Fluid (in Barrels) RWC 802 | 14.96 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | PIERCE & PETERSEN | Produced Fluid (in Barrels) RWC 802 | 7.85 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | PIERCE & PETERSEN | Produced Fluid (in Barrels) RWC 802 | 5.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2152186 | Primary Facility | 2013-03-20 | Drilling/Alteration | No Violations Noted | |
2162916 | Primary Facility | 2013-05-02 | Administrative/File Review | No Violations Noted | |
2163968 | Primary Facility | 2013-05-01 | Routine/Complete Inspection | No Violations Noted | |
2167020 | Primary Facility | 2013-05-13 | Follow-up Inspection | No Violations Noted | |
2424298 | Primary Facility | 2015-10-20 | Routine/Complete Inspection | No Violations Noted | Conventional oil well drilled 2012. It appears that the well was drilled but not fraced. The back side is plumbed in and appears in production however, there is still a lined pit on location. It appears that the site was never restored. Will contact the operator to determine the status of this well. No violations at this time. |
2598402 | Primary Facility | 2017-05-30 | Routine/Complete Inspection | No Violations Noted | |
2617981 | Primary Facility | 2017-07-19 | Routine/Complete Inspection | No Violations Noted | Open hole frac job complete. 18 stages were treated. 4 1/2" frac pipe has been removed from wellbore. Preparations are being made to equip well with tubing and rods. Containment has been constructed around wellhead to divert flowback into pit. Fluid in re-circulation pit is being pumped into flowback tank. Vac truck on site. |
2621745 | Primary Facility | 2017-07-26 | Routine/Complete Inspection | No Violations Noted | |
2644971 | Primary Facility | 2017-10-10 | Administrative/File Review | No Violations Noted | |
2777192 | Primary Facility | 2018-09-20 | Routine/Complete Inspection | No Violations Noted | Well equipped for production. Casing and tubing are connected to production lines. Well is pumping at this time. |
For data sources see[6]