X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-26165"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-26165
 
| Well ID: 37-005-26165
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.784683, -79.483995 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.784683, -79.483995 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 9/2/1999
+
| Spud Date: 1999-09-02
 
|-
 
|-
 
| Permit Date:  
 
| Permit Date:  
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 210
 
| style="text-align: right;" | 210
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 101: Line 126:
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 128: Line 153:
 
| style="text-align: right;" | 340
 
| style="text-align: right;" | 340
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 137: Line 162:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 146: Line 171:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 155: Line 180:
 
| style="text-align: right;" | 254
 
| style="text-align: right;" | 254
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 164: Line 189:
 
| style="text-align: right;" | 297
 
| style="text-align: right;" | 297
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 173: Line 198:
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 182: Line 207:
 
| style="text-align: right;" | 280
 
| style="text-align: right;" | 280
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 191: Line 216:
 
| style="text-align: right;" | 243
 
| style="text-align: right;" | 243
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 200: Line 225:
 
| style="text-align: right;" | 269
 
| style="text-align: right;" | 269
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 209: Line 234:
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 218: Line 243:
 
| style="text-align: right;" | 356
 
| style="text-align: right;" | 356
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 227: Line 252:
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 241: Line 266:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 246: Line 272:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-0
+
| 2018
 +
| [[BAKER GAS INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
Line 271: Line 298:
 
| 1039500
 
| 1039500
 
| Primary Facility
 
| Primary Facility
| 06/15/2001
+
| 2001-06-15
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - Viols Req'd
 
| Outstanding Violations - Viols Req'd
Line 278: Line 305:
 
| 1162037
 
| 1162037
 
| Primary Facility
 
| Primary Facility
| 08/20/2002
+
| 2002-08-20
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 285: Line 312:
 
| 976463
 
| 976463
 
| Primary Facility
 
| Primary Facility
| 10/20/2000
+
| 2000-10-20
 
| Site Restoration
 
| Site Restoration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 304: Line 331:
 
| 250495
 
| 250495
 
| 10/20/2000
 
| 10/20/2000
| 03/22/2001
+
| 2000-10-20
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 312: Line 339:
 
| 250496
 
| 250496
 
| 10/20/2000
 
| 10/20/2000
| 03/22/2001
+
| 2000-10-20
 
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
 
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 320: Line 347:
 
| 250497
 
| 250497
 
| 10/20/2000
 
| 10/20/2000
| 03/22/2001
+
| 2000-10-20
 
| 401 CSL - Discharge of pollultional material to waters of Commonwealth.
 
| 401 CSL - Discharge of pollultional material to waters of Commonwealth.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 328: Line 355:
 
| 250498
 
| 250498
 
| 10/20/2000
 
| 10/20/2000
| 03/22/2001
+
| 2000-10-20
 
| 91.33B - Failure to take measures to mitigate spill impact and/or clean up w/in 15 days
 
| 91.33B - Failure to take measures to mitigate spill impact and/or clean up w/in 15 days
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 350: Line 377:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/22/2001
+
| 2001-03-22
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 358: Line 385:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 03/19/2001
+
| 2001-03-19
| 03/22/2001
+
| 2001-03-22
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
Line 368: Line 395:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/22/2001
+
| 2001-03-22
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 376: Line 403:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 03/19/2001
+
| 2001-03-19
| 03/22/2001
+
| 2001-03-22
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
Line 386: Line 413:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/22/2001
+
| 2001-03-22
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 394: Line 421:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 03/19/2001
+
| 2001-03-19
| 03/22/2001
+
| 2001-03-22
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
Line 404: Line 431:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/22/2001
+
| 2001-03-22
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 412: Line 439:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 03/19/2001
+
| 2001-03-19
| 03/22/2001
+
| 2001-03-22
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
 
| style="text-align: right;" | $1,750.00
Line 424: Line 451:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 21:22, 19 August 2019

Well Details

Well ID: 37-005-26165
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Manor Township
Operator Name: BAKER GAS INC
Well Pad ID:
Farm/Lease Name: RAY G HEILMAN 5-177
License Status: Active
Spud Date: 1999-09-02
Permit Date:
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.784683
Longitude: -79.483995

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2000 BAKER GAS INC 6,074.00 210 0.00 0 0.00 0
2001 BAKER GAS INC 8,257.00 365 0.00 0 0.00 0
2002 BAKER GAS INC 6,354.00 365 0.00 0 0.00 0
2003 BAKER GAS INC 5,421.00 365 0.00 0 0.00 0
2004 BAKER GAS INC 4,317.00 361 0.00 0 0.00 0
2005 BAKER GAS INC 3,845.00 365 0.00 0 0.00 0
2006 BAKER GAS INC 2,705.00 365 0.00 0 0.00 0
2007 BAKER GAS INC 2,058.00 340 0.00 0 0.00 0
2008 BAKER GAS INC 1,986.00 366 0.00 0 0.00 0
2009 BAKER GAS INC 2,226.00 365 0.00 0 0.00 0
2010 BAKER GAS INC 1,395.00 254 0.00 0 0.00 0
2011 BAKER GAS INC 1,473.00 297 0.00 0 0.00 0
2012 BAKER GAS INC 2,541.02 351 0.00 0 0.00 0
2013 BAKER GAS INC 1,133.00 280 0.00 0 0.00 0
2014 BAKER GAS INC 830.00 243 0.00 0 0.00 0
2015 BAKER GAS INC 823.00 269 0.00 0 0.00 0
2016 BAKER GAS INC 1,072.00 321 0.00 0 0.00 0
2017 BAKER GAS INC 1,103.00 356 0.00 0 0.00 0
2018 BAKER GAS INC 980.00 364 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 BAKER GAS INC Produced Fluid (in Barrels) RWC 802 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1039500 Primary Facility 2001-06-15 Compliance Evaluation Outstanding Violations - Viols Req'd equipped/E&S advice - <70% veg cover/tank&tag ok
1162037 Primary Facility 2002-08-20 Compliance Evaluation No Violations Noted equipped/restored - >70% advice/tank&tag ok
976463 Primary Facility 2000-10-20 Site Restoration Violation(s) Noted equipped/tag ok/not restored - <70% cover/fluids discharge from tank

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
976463 250495 10/20/2000 2000-10-20 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
976463 250496 10/20/2000 2000-10-20 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging Environmental Health & Safety
976463 250497 10/20/2000 2000-10-20 401 CSL - Discharge of pollultional material to waters of Commonwealth. Environmental Health & Safety
976463 250498 10/20/2000 2000-10-20 91.33B - Failure to take measures to mitigate spill impact and/or clean up w/in 15 days Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
250495 55348 NOV - Notice of Violation Comply/Closed 2001-03-22
250495 68194 CACP - Consent Assessment of Civil Penalty Comply/Closed 2001-03-19 2001-03-22 $1,750.00 $1,750.00
250496 55348 NOV - Notice of Violation Comply/Closed 2001-03-22
250496 68194 CACP - Consent Assessment of Civil Penalty Comply/Closed 2001-03-19 2001-03-22 $1,750.00 $1,750.00
250497 55348 NOV - Notice of Violation Comply/Closed 2001-03-22
250497 68194 CACP - Consent Assessment of Civil Penalty Comply/Closed 2001-03-19 2001-03-22 $1,750.00 $1,750.00
250498 55348 NOV - Notice of Violation Comply/Closed 2001-03-22
250498 68194 CACP - Consent Assessment of Civil Penalty Comply/Closed 2001-03-19 2001-03-22 $1,750.00 $1,750.00

For data sources see[6]

References