If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-005-26231 | | Well ID: 37-005-26231 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.827201, -79.416592 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 11 | + | | Spud Date: 2000-11-28 |
|- | |- | ||
− | | Permit Date: 12 | + | | Permit Date: 1999-12-03 |
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 61: | Line 86: | ||
|- | |- | ||
| 2000 | | 2000 | ||
− | | | + | | [[ROACH & ASSOC INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2001 | | 2001 | ||
Line 74: | Line 99: | ||
| style="text-align: right;" | 143 | | style="text-align: right;" | 143 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2003 | | 2003 | ||
Line 83: | Line 108: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2004 | | 2004 | ||
Line 92: | Line 117: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2005 | | 2005 | ||
Line 101: | Line 126: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2006 | | 2006 | ||
Line 110: | Line 135: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2007 | | 2007 | ||
Line 119: | Line 144: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2008 | | 2008 | ||
Line 128: | Line 153: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2009 | | 2009 | ||
Line 137: | Line 162: | ||
| style="text-align: right;" | 243 | | style="text-align: right;" | 243 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2010 | | 2010 | ||
− | | | + | | [[ROACH & ASSOC INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2014 | | 2014 | ||
Line 155: | Line 180: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2015 | | 2015 | ||
Line 164: | Line 189: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2016 | | 2016 | ||
Line 173: | Line 198: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2017 | | 2017 | ||
Line 182: | Line 207: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2018 | | 2018 | ||
Line 191: | Line 216: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
|} | |} | ||
Line 205: | Line 230: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 224: | Line 250: | ||
| 1160906 | | 1160906 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2002-08-20 |
| Site Restoration | | Site Restoration | ||
| Violation(s) Noted | | Violation(s) Noted | ||
Line 231: | Line 257: | ||
| 1173453 | | 1173453 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2002-10-03 |
| Compliance Evaluation | | Compliance Evaluation | ||
| No Violations Noted | | No Violations Noted | ||
Line 250: | Line 276: | ||
| 313378 | | 313378 | ||
| 08/20/2002 | | 08/20/2002 | ||
− | | | + | | 2002-08-20 |
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
| Environmental Health & Safety | | Environmental Health & Safety | ||
Line 258: | Line 284: | ||
| 313379 | | 313379 | ||
| 08/20/2002 | | 08/20/2002 | ||
− | | | + | | 2002-08-20 |
| 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging | | 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging | ||
| Environmental Health & Safety | | Environmental Health & Safety | ||
Line 266: | Line 292: | ||
| 313380 | | 313380 | ||
| 08/20/2002 | | 08/20/2002 | ||
− | | | + | | 2002-08-20 |
| 78.56LINER - Improperly lined pit | | 78.56LINER - Improperly lined pit | ||
| Administrative | | Administrative | ||
Line 288: | Line 314: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 10 | + | | 2002-10-03 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 296: | Line 322: | ||
| CACP - Consent Assessment of Civil Penalty | | CACP - Consent Assessment of Civil Penalty | ||
| Comply/Closed | | Comply/Closed | ||
− | | 11 | + | | 2002-11-15 |
− | | 11 | + | | 2002-11-20 |
| style="text-align: right;" | $700.00 | | style="text-align: right;" | $700.00 | ||
| style="text-align: right;" | $700.00 | | style="text-align: right;" | $700.00 | ||
Line 306: | Line 332: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 10 | + | | 2002-10-03 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 314: | Line 340: | ||
| CACP - Consent Assessment of Civil Penalty | | CACP - Consent Assessment of Civil Penalty | ||
| Comply/Closed | | Comply/Closed | ||
− | | 11 | + | | 2002-11-15 |
− | | 11 | + | | 2002-11-20 |
| style="text-align: right;" | $700.00 | | style="text-align: right;" | $700.00 | ||
| style="text-align: right;" | $700.00 | | style="text-align: right;" | $700.00 | ||
Line 324: | Line 350: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 10 | + | | 2002-10-03 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 332: | Line 358: | ||
| CACP - Consent Assessment of Civil Penalty | | CACP - Consent Assessment of Civil Penalty | ||
| Comply/Closed | | Comply/Closed | ||
− | | 11 | + | | 2002-11-15 |
− | | 11 | + | | 2002-11-20 |
| style="text-align: right;" | $700.00 | | style="text-align: right;" | $700.00 | ||
| style="text-align: right;" | $700.00 | | style="text-align: right;" | $700.00 | ||
Line 344: | Line 370: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-005-26231 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.827201,"lon":-79.416592,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Valley Township | |
Operator Name: ROACH & ASSOC INC | |
Well Pad ID: | |
Farm/Lease Name: JOHN C MILLER 1A | |
License Status: Active | |
Spud Date: 2000-11-28 | |
Permit Date: 1999-12-03 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.827201 | |
Longitude: -79.416592 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2000 | ROACH & ASSOC INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2001 | ROACH & ASSOC INC | 2,925.00 | 143 | 0.00 | 0 | 0.00 | 0 |
2003 | ROACH & ASSOC INC | 5,936.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | ROACH & ASSOC INC | 4,559.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2005 | ROACH & ASSOC INC | 5,175.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | ROACH & ASSOC INC | 1,376.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | ROACH & ASSOC INC | 2,164.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | ROACH & ASSOC INC | 1,607.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | ROACH & ASSOC INC | 2,162.00 | 243 | 0.00 | 0 | 0.00 | 0 |
2010 | ROACH & ASSOC INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | ROACH & ASSOC INC | 1,897.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ROACH & ASSOC INC | 1,258.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ROACH & ASSOC INC | 1,533.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | ROACH & ASSOC INC | 1,696.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ROACH & ASSOC INC | 1,771.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1160906 | Primary Facility | 2002-08-20 | Site Restoration | Violation(s) Noted | equipped/tank&tag ok/not restored/E&S inadequate/pit liner fallen in drill pit |
1173453 | Primary Facility | 2002-10-03 | Compliance Evaluation | No Violations Noted | equipped/restored - E&S advice/tank&tag ok |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1160906 | 313378 | 08/20/2002 | 2002-08-20 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1160906 | 313379 | 08/20/2002 | 2002-08-20 | 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging | Environmental Health & Safety | |
1160906 | 313380 | 08/20/2002 | 2002-08-20 | 78.56LINER - Improperly lined pit | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
313378 | 100458 | NOV - Notice of Violation | Comply/Closed | 2002-10-03 | |||
313378 | 106654 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2002-11-15 | 2002-11-20 | $700.00 | $700.00 |
313379 | 100458 | NOV - Notice of Violation | Comply/Closed | 2002-10-03 | |||
313379 | 106654 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2002-11-15 | 2002-11-20 | $700.00 | $700.00 |
313380 | 100458 | NOV - Notice of Violation | Comply/Closed | 2002-10-03 | |||
313380 | 106654 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2002-11-15 | 2002-11-20 | $700.00 | $700.00 |
For data sources see[5]