X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-24310"

m
m
Line 203: Line 203:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 208: Line 209:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2008-A00
+
| 2008
 +
| [[VISTA OPR INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 214: Line 216:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2010-A00
+
| 2010
 +
| [[VISTA OPR INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 220: Line 223:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-A00
+
| 2011
 +
| [[VISTA OPR INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 226: Line 230:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2016-A00
+
| 2016
 +
| [[VISTA OPR INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
Line 232: Line 237:
 
|  
 
|  
 
|-
 
|-
| 2018-A00
+
| 2018
 +
| [[VISTA OPR INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.00 Bbl
 
| style="text-align: right;" | 33.00 Bbl

Revision as of 01:02, 20 August 2019

Well Details

Well ID: 37-085-24310
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: New Lebanon Borough
Operator Name: VISTA OPR INC
Well Pad ID:
Farm/Lease Name: HELMUTH UNIT 2
License Status: Active
Spud Date: 2007-07-13
Permit Date: 2007-06-13
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.412066
Longitude: -80.082898

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 VISTA OPR INC 3,546.00 365 0.00 0 0.00 0
2008 VISTA OPR INC 14,834.00 365 0.00 0 0.00 0
2009 VISTA OPR INC 7,726.00 365 0.00 0 0.00 0
2010 VISTA OPR INC 6,050.00 365 0.00 0 0.00 0
2011 VISTA OPR INC 4,727.00 365 0.00 0 0.00 0
2012 VISTA OPR INC 6,178.00 365 0.00 0 0.00 0
2013 VISTA OPR INC 5,127.00 365 0.00 0 0.00 0
2014 VISTA OPR INC 4,533.00 365 0.00 0 0.00 0
2015 VISTA OPR INC 4,376.00 365 0.00 0 0.00 0
2016 VISTA OPR INC 4,094.00 365 0.00 0 0.00 0
2017 VISTA OPR INC 3,566.00 365 0.00 0 0.00 0
2018 VISTA OPR INC 2,629.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 VISTA OPR INC Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 VISTA OPR INC Produced Fluid (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 VISTA OPR INC Produced Fluid (in Barrels) 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2016 VISTA OPR INC Produced Fluid (in Barrels) RWC 802 25.00 Bbl ROAD SPREADING
2018 VISTA OPR INC Produced Fluid (in Barrels) RWC 802 33.00 Bbl ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1636237 Primary Facility 2007-07-16 Drilling/Alteration No Violations Noted
1957853 Primary Facility 2011-03-15 Routine/Complete Inspection No Violations Noted
2714326 Primary Facility 2018-04-04 Routine/Partial Inspection No Violations Noted A weekly chart with production is on the meter in separator unit. Tubing is open to separator unit. Production casing is open to a domestic gas meter. Surface casing appears to be open to the tank based on the 1" steel line connected to it.

For data sources see[6]

References