If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 113: | Line 113: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 118: | Line 119: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[CATALYST ENERGY INC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 1,768.95 Bbl | | style="text-align: right;" | 1,768.95 Bbl | ||
Line 124: | Line 126: | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[CATALYST ENERGY INC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 9.29 Bbl | | style="text-align: right;" | 9.29 Bbl | ||
Line 130: | Line 133: | ||
| PAS2D215BWAR | | PAS2D215BWAR | ||
|- | |- | ||
− | | 2017- | + | | 2017 |
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 52.86 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 31.43 Bbl | ||
+ | | ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CATALYST ENERGY INC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 274.29 Bbl | | style="text-align: right;" | 274.29 Bbl | ||
Line 136: | Line 154: | ||
| PA0023213 | | PA0023213 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[CATALYST ENERGY INC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 140.00 Bbl | | style="text-align: right;" | 140.00 Bbl | ||
Line 142: | Line 161: | ||
| | | | ||
|- | |- | ||
− | | | + | | 2018 |
+ | | [[CATALYST ENERGY INC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 167.86 Bbl |
− | | | + | | PUBLIC SEWAGE TREATMENT PLANT |
− | + | | PA0023213 | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[CATALYST ENERGY INC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 1,017.38 Bbl | | style="text-align: right;" | 1,017.38 Bbl | ||
Line 160: | Line 175: | ||
| PA0101508 | | PA0101508 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[CATALYST ENERGY INC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 15.71 Bbl | | style="text-align: right;" | 15.71 Bbl | ||
Line 172: | Line 182: | ||
| PAS2D215BWAR | | PAS2D215BWAR | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[CATALYST ENERGY INC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 15.71 Bbl | | style="text-align: right;" | 15.71 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123NW005 | | WMGR123NW005 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CATALYST ENERGY INC]] | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 523.57 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-155-24079 | ||
|- | |- | ||
|} | |} |
Well ID: 37-121-46142 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.383711,"lon":-79.773519,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Franklin City | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW LOT 82 3491 | |
License Status: Active | |
Spud Date: 2017-07-06 | |
Permit Date: 2017-03-09 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.383711 | |
Longitude: -79.773519 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | 0.00 | 0 | 451.24 | 150 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 42.52 | 365 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 1,768.95 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 9.29 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2017 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 52.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 31.43 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 274.29 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 140.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2018 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 167.86 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 1,017.38 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 15.71 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | CATALYST ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 523.57 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2600602 | Primary Facility | 2017-06-02 | Routine/Complete Inspection | No Violations Noted | Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation. |
2600604 | Primary Facility | 2017-06-02 | Routine/Complete Inspection | No Violations Noted | Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation. |
2600605 | Primary Facility | 2017-06-02 | Routine/Complete Inspection | No Violations Noted | Onsite form a routine inspection. The site has been cleared and graded. E&S BMPs are in place. The pit is dug and filled with water. It does not appear the pit will be suitable for encapsulation. |
2603569 | Primary Facility | 2017-06-12 | Routine/Partial Inspection | No Violations Noted | |
2606056 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site. |
2606060 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site. |
2606062 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site. |
2606063 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The permit is posted onsite. The site has been constructed and is temporarily stabilized. There is a surface water channel located in close proximity to the drill pit. A meeting was set up with the operator to discuss options with the site. |
2612644 | Primary Facility | 2017-07-06 | Drilling/Alteration | No Violations Noted | |
2613789 | Primary Facility | 2017-07-06 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The rig is currently shut down waiting to cement the casing. The pit is lined with greater than two feet of freeboard. The site is stable, there are no E&S issues. |
2613793 | Primary Facility | 2017-07-10 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is drilled, pit is lined with greater than two feet of freeboard. The site is stable there are no E&S issues. |
2616683 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is drilled, pit lined with greater than two feet of freeboard. The site has been mulched and is stable. There are no E&S issues. |
2621596 | Primary Facility | 2017-08-01 | Drilling/Alteration | No Violations Noted | |
2623607 | Primary Facility | 2017-07-31 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. Currently setting up to notch the well. A pit is not being utilized containment is setup. There are no E&S issues. |
2623672 | Primary Facility | 2017-08-09 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site has been graded and mulched. There are no E&S issues. |
2627700 | Primary Facility | 2017-08-22 | Administrative/File Review | No Violations Noted | |
2678127 | Primary Facility | 2018-01-03 | Routine/Partial Inspection | No Violations Noted | Inspection shows well active and currently shut down due to the cold weather. Well equipped with rods, tubing, and pump jack with an electric motor. Label attached to the well head with annulus vented to the atmosphere. |
2729839 | Primary Facility | 2018-05-14 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Vegetation is established onsite. There are no E&S issues. |
For data sources see[6]