X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31264"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31264
 
| Well ID: 37-005-31264
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.715928, -79.621447 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.715928, -79.621447 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 03/08/2017
+
| Spud Date: 2017-03-08
 
|-
 
|-
| Permit Date: 5/12/2016
+
| Permit Date: 2016-05-12
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 45: Line 45:
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | title = Oil and Gas Well Pad Report
 
  | title = Oil and Gas Well Pad Report
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Operator Name
 
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
|-
 
| 2017
 
| [[SNYDER BROS INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2018
 
| [[SNYDER BROS INC]]
 
| style="text-align: right;" | 1,614,848.00
 
| style="text-align: right;" | 317
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2019
 
| [[SNYDER BROS INC]]
 
| style="text-align: right;" | 462,163.00
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Production Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2017-05
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 327.04 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-05
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 2,100.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-06
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 199.05 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-06
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 116.25 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-07
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 300.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-08
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 848.47 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-08
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 75.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 110.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 146.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 247.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2017-12
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 4.07 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-01
 
| Filter Socks (in Tons) RWC 812
 
| style="text-align: right;" | 0.50 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 13.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-02
 
| Filter Socks (in Tons) RWC 812
 
| style="text-align: right;" | 0.23 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 6,663.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-02
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 56.80 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 3,128.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-03
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 7.59 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-03
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 3.89 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,105.30 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 33.90 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2018-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,911.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,509.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 263.40 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 792.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,288.30 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,827.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 39.10 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,872.40 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 821.50 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,422.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 195.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,363.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 11.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 258.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,540.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,151.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 10.40 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,828.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 26.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23223
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2573230
 
| Primary Facility
 
| 2017-03-20
 
| Drilling/Alteration
 
| No Violations Noted
 
| Well spudded to 42' on 3/15/2017. Set 42' of new 24" conductor pipe. Cellar-casing look ok.
 
|-
 
| 2580988
 
| Primary Facility
 
| 2017-04-06
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Drilling had commenced but was not ongoing at the time of the inspection.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
| 2606701
 
| Primary Facility
 
| 2017-06-22
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Top-hole drilling had been completed, drill rig had been moved off-site. Well development secondary containment located onsite and it appeared to be in sound condition.  There was no evidence observed of any spills to the containment,i.e. There were no sheens observed in the puddles of precipitation on the secondary containment.  All access road and site erosion controls had been properly maintained.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
| 2628215
 
| Primary Facility
 
| 2017-08-21
 
| Drilling/Alteration
 
| No Violations Noted
 
| Rig was drilling at 4,923' at the time of this inspection. Daily drilling information and all equipment on site looked ok.
 
|-
 
| 2630665
 
| Primary Facility
 
| 2017-08-28
 
| Drilling/Alteration
 
| No Violations Noted
 
| The Rig had drilled to 14,716', ran and cemented the 5 1/2" production casing back to surface with good returns. Daily drilling log info and all equipment on site looked ok.
 
|-
 
| 2633982
 
| Primary Facility
 
| 2017-09-08
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Drilling was not ongoing at the time of the inspection.  Secondary containment was located onsite.  Minimal precipitation had accumulated on the containment.  No sheens were observed in the puddles of water located on the containment.  All erosion controls had been properly implemented and maintained as outlined in the E&S plan contained within the ESCGP.  Disturbed areas, cut and fill slopes had been temporarily stabilized and vegetation had begun to emerge.  There was no observed accelerated erosion or sedimentation in relation to the access road.
 
|-
 
| 2647161
 
| Primary Facility
 
| 2017-10-13
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Well development impoundment construction had been completed and those areas disturbed by that construction had been temporarily stabilized.  All site and access road erosion controls had been implemented and maintained as outlined in the E&S plan included within the ESCGP.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Work was underway to set-up equipment and prepare the site for well stimulation activities slated to begin on 10/15/17.  Secondary containment had been implemented as outlined in the containment plan.
 
|-
 
| 2681582
 
| Primary Facility
 
| 2018-01-11
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection, wells 1H, 2H, 3H, and 4H have been frac'd, not yet equipped for production. On-site contractors appear to be installing production equipment during this inspection.
 
|-
 
| 2750706
 
| Primary Facility
 
| 2018-07-11
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery looks ok.
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Compliance Report
 
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| date = 2019-05-20
Line 463: Line 60:
 
|-
 
|-
 
| 1
 
| 1
| 10/17/2017
+
| 2017-10-17
| 11/08/2017
+
| 2017-11-08
 
| style="text-align: right;" | 6969
 
| style="text-align: right;" | 6969
 
| style="text-align: right;" | 16,512,800.0
 
| style="text-align: right;" | 16,512,800.0
Line 547: Line 144:
 
| style="text-align: right;" | 93.556
 
| style="text-align: right;" | 93.556
 
|-
 
|-
| quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides
+
| quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides
 
| 68424-85-1
 
| 68424-85-1
 
| style="text-align: right;" | 5.3
 
| style="text-align: right;" | 5.3
Line 629: Line 226:
 
| rowspan="3"| Keane
 
| rowspan="3"| Keane
 
| rowspan="3"| Biocide
 
| rowspan="3"| Biocide
| quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides
+
| quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides
 
| 68424-85-1
 
| 68424-85-1
 
| style="text-align: right;" | 5.3
 
| style="text-align: right;" | 5.3
Line 725: Line 322:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 1,614,848.00
 +
| style="text-align: right;" | 317
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 462,163.00
 +
| style="text-align: right;" | 90
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 4.07 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Drill Cuttings (in Tons) RWC 810
 +
| style="text-align: right;" | 1,374.56 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 2,591.25 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 247.70 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 146.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 110.80 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 11.70 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 2,412.30 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Tons) RWC 802
 +
| style="text-align: right;" | 64.39 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 28,149.40 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Filter Socks (in Tons) RWC 812
 +
| style="text-align: right;" | 0.73 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 3.89 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 487.20 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3,980.10 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 10.40 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 26.10 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23223
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2573230
 +
| Primary Facility
 +
| 2017-03-20
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Well spudded to 42' on 3/15/2017. Set 42' of new 24" conductor pipe. Cellar-casing look ok.
 +
|-
 +
| 2580988
 +
| Primary Facility
 +
| 2017-04-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Drilling had commenced but was not ongoing at the time of the inspection.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 +
|-
 +
| 2606701
 +
| Primary Facility
 +
| 2017-06-22
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Top-hole drilling had been completed, drill rig had been moved off-site. Well development secondary containment located onsite and it appeared to be in sound condition.  There was no evidence observed of any spills to the containment,i.e. There were no sheens observed in the puddles of precipitation on the secondary containment.  All access road and site erosion controls had been properly maintained.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 +
|-
 +
| 2628215
 +
| Primary Facility
 +
| 2017-08-21
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Rig was drilling at 4,923' at the time of this inspection. Daily drilling information and all equipment on site looked ok.
 +
|-
 +
| 2630665
 +
| Primary Facility
 +
| 2017-08-28
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| The Rig had drilled to 14,716', ran and cemented the 5 1/2" production casing back to surface with good returns. Daily drilling log info and all equipment on site looked ok.
 +
|-
 +
| 2633982
 +
| Primary Facility
 +
| 2017-09-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Drilling was not ongoing at the time of the inspection.  Secondary containment was located onsite.  Minimal precipitation had accumulated on the containment.  No sheens were observed in the puddles of water located on the containment.  All erosion controls had been properly implemented and maintained as outlined in the E&S plan contained within the ESCGP.  Disturbed areas, cut and fill slopes had been temporarily stabilized and vegetation had begun to emerge.  There was no observed accelerated erosion or sedimentation in relation to the access road.
 +
|-
 +
| 2647161
 +
| Primary Facility
 +
| 2017-10-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well development impoundment construction had been completed and those areas disturbed by that construction had been temporarily stabilized.  All site and access road erosion controls had been implemented and maintained as outlined in the E&S plan included within the ESCGP.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Work was underway to set-up equipment and prepare the site for well stimulation activities slated to begin on 10/15/17.  Secondary containment had been implemented as outlined in the containment plan.
 +
|-
 +
| 2681582
 +
| Primary Facility
 +
| 2018-01-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection, wells 1H, 2H, 3H, and 4H have been frac'd, not yet equipped for production. On-site contractors appear to be installing production equipment during this inspection.
 +
|-
 +
| 2750706
 +
| Primary Facility
 +
| 2018-07-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery looks ok.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 05:39, 20 August 2019

Well Details

Well ID: 37-005-31264
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 153668
Farm/Lease Name: RENSHAW 4H
License Status: Active
Spud Date: 2017-03-08
Permit Date: 2016-05-12
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.715928
Longitude: -79.621447

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-17 2017-11-08 6969 16,512,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KFR-16FW Keane Friction Reducer oleic acid diethanolamide 93-83-4 1.5 0.00121974 1866.82
Water 7732-18-5 60 0.0487897 74672.7
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0162632 24890.9
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000813162 1244.55
ammonium chloride 12125-02-9 1.5 0.00121974 1866.82
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 90.0357 137,800,000.0
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 9.23008 14,126,600.0
Other Chemical(s) Listed Above See Trade Name(s) List Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00006113 93.556
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000495827 758.864
Water 7732-18-5 92.5 0 0
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000813162 1244.55
isoproyl alcohol 67-63-0 5 0.00006113 93.556
Water 7732-18-5 85 0.531306 813165
Fatty imidazoline 61790-69-0 5 0.00006113 93.556
oleic acid diethanolamide 93-83-4 1.5 0.00121974 1866.82
didecyldimethylammonium chloride 7173-51-5 8 0.000744208 1139.01
ammonium chloride 12125-02-9 1.5 0.00121974 1866.82
ethylbenzene 100-41-4 1 0.00001223 18.711
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0162632 24890.9
xylene 1330-20-7 5 0.00006113 93.556
prop-2-yn-1-ol 107-19-7 5 0.00006113 93.556
MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000495827 758.864
didecyldimethylammonium chloride 7173-51-5 8 0.000744208 1139.01
glutaral 111-30-8 26.7 0.00249314 3815.76
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.0937599 143500
Water 7732-18-5 85 0.531306 813165
KSI-19NW Keane Scale Inhibitor Methanol 67-56-1 30 0.00518178 7930.71
KAI-12 Keane Acid Inhibitor xylene 1330-20-7 5 0.00006113 93.556
prop-2-yn-1-ol 107-19-7 5 0.00006113 93.556
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00006113 93.556
isoproyl alcohol 67-63-0 5 0.00006113 93.556
Methanol 67-56-1 90 0.0011003 1684
ethylbenzene 100-41-4 1 0.00001223 18.711
Fatty imidazoline 61790-69-0 5 0.00006113 93.556

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2018 SNYDER BROS INC 1,614,848.00 317 0.00 0 0.00 0
2019 SNYDER BROS INC 462,163.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC Synthetic Liner Materials (in Tons) RWC 806 4.07 Tons LANDFILL 100585
2017 SNYDER BROS INC Drill Cuttings (in Tons) RWC 810 1,374.56 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste (in Barrels) RWC 803 2,591.25 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 247.70 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 146.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 110.80 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 11.70 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 2,412.30 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid (in Tons) RWC 802 64.39 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 28,149.40 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Filter Socks (in Tons) RWC 812 0.73 Tons LANDFILL 100585
2018 SNYDER BROS INC Synthetic Liner Materials (in Tons) RWC 806 3.89 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 487.20 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 3,980.10 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 10.40 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 26.10 Bbl INJECTION DISPOSAL WELL 34-155-23223

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2573230 Primary Facility 2017-03-20 Drilling/Alteration No Violations Noted Well spudded to 42' on 3/15/2017. Set 42' of new 24" conductor pipe. Cellar-casing look ok.
2580988 Primary Facility 2017-04-06 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2606701 Primary Facility 2017-06-22 Routine/Complete Inspection No Violations Noted Top-hole drilling had been completed, drill rig had been moved off-site. Well development secondary containment located onsite and it appeared to be in sound condition. There was no evidence observed of any spills to the containment,i.e. There were no sheens observed in the puddles of precipitation on the secondary containment. All access road and site erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2628215 Primary Facility 2017-08-21 Drilling/Alteration No Violations Noted Rig was drilling at 4,923' at the time of this inspection. Daily drilling information and all equipment on site looked ok.
2630665 Primary Facility 2017-08-28 Drilling/Alteration No Violations Noted The Rig had drilled to 14,716', ran and cemented the 5 1/2" production casing back to surface with good returns. Daily drilling log info and all equipment on site looked ok.
2633982 Primary Facility 2017-09-08 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Secondary containment was located onsite. Minimal precipitation had accumulated on the containment. No sheens were observed in the puddles of water located on the containment. All erosion controls had been properly implemented and maintained as outlined in the E&S plan contained within the ESCGP. Disturbed areas, cut and fill slopes had been temporarily stabilized and vegetation had begun to emerge. There was no observed accelerated erosion or sedimentation in relation to the access road.
2647161 Primary Facility 2017-10-13 Routine/Complete Inspection No Violations Noted Well development impoundment construction had been completed and those areas disturbed by that construction had been temporarily stabilized. All site and access road erosion controls had been implemented and maintained as outlined in the E&S plan included within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Work was underway to set-up equipment and prepare the site for well stimulation activities slated to begin on 10/15/17. Secondary containment had been implemented as outlined in the containment plan.
2681582 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted At time of inspection, wells 1H, 2H, 3H, and 4H have been frac'd, not yet equipped for production. On-site contractors appear to be installing production equipment during this inspection.
2750706 Primary Facility 2018-07-11 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery looks ok.

For data sources see[7]

References