If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-005-31316 | | Well ID: 37-005-31316 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.686847, -79.681331 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 09 | + | | Spud Date: 2018-09-17 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2018-03-12 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 79: | Line 104: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 84: | Line 110: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[XTO ENERGY INC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
| style="text-align: right;" | 634.70 Tons | | style="text-align: right;" | 634.70 Tons | ||
Line 90: | Line 117: | ||
| 100585 | | 100585 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[XTO ENERGY INC]] | ||
| Drilling Fluid Waste (in Barrels) RWC 803 | | Drilling Fluid Waste (in Barrels) RWC 803 | ||
| style="text-align: right;" | 480.00 Bbl | | style="text-align: right;" | 480.00 Bbl | ||
Line 96: | Line 124: | ||
| WMGR123NW009 | | WMGR123NW009 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[XTO ENERGY INC]] |
− | | style="text-align: right;" | | + | | Drill Cuttings (in Tons) RWC 810 |
+ | | style="text-align: right;" | 970.65 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100585 | | 100585 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | | | + | | [[XTO ENERGY INC]] |
− | | style="text-align: right;" | | + | | Synthetic Liner Materials (in Tons) RWC 806 |
+ | | style="text-align: right;" | 3.56 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100585 | | 100585 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[XTO ENERGY INC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
| style="text-align: right;" | 117.68 Tons | | style="text-align: right;" | 117.68 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100172 | | 100172 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
Line 206: | Line 231: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-005-31316 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.686847,"lon":-79.681331,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Freeport Borough | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 155139 | |
Farm/Lease Name: TRILOGY B 2H | |
License Status: Active | |
Spud Date: 2018-09-17 | |
Permit Date: 2018-03-12 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.686847 | |
Longitude: -79.681331 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | XTO ENERGY INC | Drill Cuttings (in Tons) RWC 810 | 634.70 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Drilling Fluid Waste (in Barrels) RWC 803 | 480.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Drill Cuttings (in Tons) RWC 810 | 970.65 Tons | LANDFILL | 100585 |
2019 | XTO ENERGY INC | Synthetic Liner Materials (in Tons) RWC 806 | 3.56 Tons | LANDFILL | 100585 |
2019 | XTO ENERGY INC | Drill Cuttings (in Tons) RWC 810 | 117.68 Tons | LANDFILL | 100172 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2778284 | Primary Facility | 2018-09-21 | Drilling/Alteration | No Violations Noted | This well was spudded to 40' and had 40' of 30" pipe installed and cemented back to surface. All equipment on site looked ok. |
2778803 | Primary Facility | 2018-09-24 | Drilling/Alteration | No Violations Noted | This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.
On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok. |
2790011 | Primary Facility | 2018-10-17 | Drilling/Alteration | No Violations Noted | This well was spudded to 42' and had 42' of 40" pipe installed and cemented back to surface inside an 8'x10' cellar. All equipment on site looked ok.
On this return date, the top hole rig was on site drilling at 1383' at the time of this inspection. All well log information and equipment on site looks ok. |
2821634 | Primary Facility | 2019-01-03 | Drilling/Alteration | No Violations Noted | The top hole portion of this well has been drilled and the well casing is capped off waiting on the finishing rig to arrive. The well head casing and all equipment on site looks ok. |
2853390 | Primary Facility | 2019-03-12 | Drilling/Alteration | No Violations Noted | At the time of inspection, Patterson 579 was drilling 8 3/4" hole in the curve. Once they land the curve, they will switch to a 8 1/2" bit. The BOP was tested on 3/10. Containment appeared to be in good condition, with fuel and mud within double containment. |
For data sources see[6]