X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-113-20349"

m
m
Line 140: Line 140:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 145: Line 146:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2015-S02
+
| 2015
| Drill Cuttings (in Tons)
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 1,170.00 Tons
 
| LANDFILL
 
| 301358
 
|-
 
| 2015-S02
 
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 440.00 Bbl
 
| style="text-align: right;" | 440.00 Bbl
Line 157: Line 153:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2016-S02
+
| 2015
| Fracturing Fluid Waste (in Barrels) RWC 805
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 240.00 Bbl
+
| Drill Cuttings (in Tons)
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 1,170.00 Tons
| WMGR123
+
| LANDFILL
 +
| 301358
 
|-
 
|-
| 2016-S02
+
| 2016
 +
| [[CHIEF OIL & GAS LLC]]
 
| Fracturing Fluid Waste (in Barrels) RWC 805
 
| Fracturing Fluid Waste (in Barrels) RWC 805
 
| style="text-align: right;" | 23,619.55 Bbl
 
| style="text-align: right;" | 23,619.55 Bbl
Line 169: Line 167:
 
|  
 
|  
 
|-
 
|-
| 2016-S02
+
| 2016
 +
| [[CHIEF OIL & GAS LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 29,346.01 Bbl
 
| style="text-align: right;" | 29,346.01 Bbl
Line 175: Line 174:
 
|  
 
|  
 
|-
 
|-
| 2017-M01
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CHIEF OIL & GAS LLC]]
 +
| Fracturing Fluid Waste (in Barrels) RWC 805
 +
| style="text-align: right;" | 240.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 +
|-
 +
| 2017
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Unused Fracturing Fluid Waste (in Barrels) RWC 805
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2017-M02
+
| 2017
 +
| [[CHIEF OIL & GAS LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 241.88 Bbl
+
| style="text-align: right;" | 2,335.57 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-M03
+
| 2017
 +
| [[CHIEF OIL & GAS LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 292.72 Bbl
+
| style="text-align: right;" | 120.00 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| WMGR123
 
|-
 
|-
| 2017-M04
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 211.69 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 204.99 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 164.92 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 141.96 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M08
 
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 177.74 Tons
 
| style="text-align: right;" | 177.74 Tons
Line 223: Line 209:
 
| 301358
 
| 301358
 
|-
 
|-
| 2017-M09
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 106.07 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 496.21 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M11
 
| Unused Fracturing Fluid Waste (in Barrels) RWC 805
 
| style="text-align: right;" | 120.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 475.13 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 267.21 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 7.52 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,033.24 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,390.69 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 431.71 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 812.46 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 904.73 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 462.60 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 483.05 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 650.52 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 306.47 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 382.43 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 310.65 Bbl
+
| style="text-align: right;" | 8,750.20 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-M03
+
| 2019
 +
| [[CHIEF OIL & GAS LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 630.45 Bbl
+
| style="text-align: right;" | 1,323.53 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  

Revision as of 10:50, 20 August 2019

Well Details

Well ID: 37-113-20349
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Elkland Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 153050
Farm/Lease Name: HART NORTH UNIT 2H
License Status: Active
Spud Date: 2015-11-28
Permit Date: 2015-10-27
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.5543
Longitude: -76.589006

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 693,031.08 114 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 1,728,871.07 330 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 568,572.52 314 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 171,602.57 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 440.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) 1,170.00 Tons LANDFILL 301358
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste (in Barrels) RWC 805 23,619.55 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 29,346.01 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Fracturing Fluid Waste (in Barrels) RWC 805 240.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 CHIEF OIL & GAS LLC Unused Fracturing Fluid Waste (in Barrels) RWC 805 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 2,335.57 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) RWC 810 177.74 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 8,750.20 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 1,323.53 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2428036 Primary Facility 2015-11-25 Preoperation Inspection No Violations Noted
2428589 Primary Facility 2015-11-30 Drilling/Alteration No Violations Noted Arrived at 12:50, weather cold and cloudy with some sun. Well pad was newly constructed with two wells spudded. Met with company man Billy Swanson who was onsite to witness cementing of conductors. Other personnel onsite included staff from: Universal Well Services and Mr Dirt. A Soilmec SR-30 hydraulic rotating rig had been used to drill the cellars and conductors was still on location. At the time of my inspection Universal Well Service was cementing in the conductors for the Hart N Unit 2H and Hart S Unit 1H. Left location @ 14:14.
2428933 Primary Facility 2015-12-01 Routine/Complete Inspection No Violations Noted Routine inspection conducted to review site conditions and E&S controls. Crews were on site completing installation of the conductor casing.
2431964 Primary Facility 2015-12-10 Routine/Complete Inspection No Violations Noted Routine inspection conducted to review site conditions during rig-up. The drilling rig is mostly assembled, and crews are continuing to set up appurtenant equipment. Fuel and chemicals on site are all within containment. Erosion and sediment controls are in place and in good repair. No evidence of accelerated erosion or sedimentation was observed.
2433995 Primary Facility 2015-12-16 Drilling/Alteration No Violations Noted Arrived at 09:00, weather cold and cloudy. Paterson 254 on site and at 5901’ after 6 days drilling the Hart N Unit 2H well. Rig was getting ready to kick-off. Drilling was going well. Last BOP test was on 12/12/15. Took a trip around the location. There were large ruts at the front of the pad, these have been rocked. There were no violations at the time of my inspection. Left @ 09:40.
2436174 Primary Facility 2015-12-28 Drilling/Alteration No Violations Noted Arrived @ 10:50, weather cold and grey. Met with company man Paul Rico. Paterson 254 at 13,188’ MD. Should be done drilling lateral today and start casing tomorrow, according to Rico. On 12/21/15 lateral encountered an unanticipated fault that downdropped the Marcellus so that the lateral passed into the Purcell. Deepest drilled prior to the sidetrack was 12, 175’ MD. Pulled back to 9783’ MD and drilled down to conduct an open-hole sidetrack to get back into the hot Marcellus. The sidetrack went well, according to Paul Rico. Two Haliburton cement trailers were on location in preparation for the cement job. Off containment to the left of the entrance, I observed a minor hydraulic oil under a soil compactor. The oil (¿ 0.1 gallon) appeared to come from a leaking hose. There was a sheen on puddles near the compactor also. I showed this to Paul who said it would be promptly fixed. Left location @ 12:00
2467917 Primary Facility 2016-03-24 Drilling/Alteration No Violations Noted Arrived @ 9:30, weather warm. This well was TD’ed at the end of 2015 (IR #: 2436174). Met with Jon Hafer (Chief) to determine whether methane detections on 13-3/8” x 9-5/8” casing annulus were from the casing annulus or due to cross-flow contamination for the 9-5/8” x 5-1/2” annulus. Prior to the field meeting Hafer had separated the annular vents. Monitoring was conducted with an Altair 5X gas meter calibrated on 3/24/16, and a MultiRae meter conducted on 03/24/16.

13-3/8” x 9-5/8”: 8.9% methane 9-5/8” x 5-1/2” 50.6% methane. Since the operator reported this annular gas there is no violation associated with this inspection.

2499259 Primary Facility 2016-07-06 Routine/Complete Inspection No Violations Noted Routine inspection to assess overall site conditions and containment/materials storage for well completion operations.

Temporary erosion and sediment control BMPs are in place and in good condition. The site is well vegetated with a mix of annual and perennial plant species. No evidence of accelerated erosion or sedimentation was observed.

Well completion operations are underway. All pumps, trucks, tanks, totes and other equipment were observed to be located in or over containment. No areas of apparent spilled material were observed inside or outside of the containment. Several puddles on the well pad surface, outside of containment, were screened to estimate the conductivity of the fluid. None of the screened puddles had an electrical conductance above 675 uS/cm.

The containment around the tanks holding reuse water (flowback fluid/brine) was screened; the electrical conductivity of the fluid within the containment was screened at 7.9 mS/cm. The amount of fluid present in the containment was not signif

2503466 Primary Facility 2016-07-21 Routine/Partial Inspection No Violations Noted Routine inspection to assess site conditions after well completion operations.

Much of the pad containment liner remains in place. Several puddles on the containment were screened for electrical conductivity and ranged from 2.1 - 3.0 mS/cm. One of the puddles that exhibited elevated conductivity was adjacent to two tears in the containment. Prior to removing the containment, all fluids should be removed to minimize the risk of potential contamination to the pad surface materials and ground and surface waters. Further, due to the proximity of fluids with elevated conductivity to the tears observed in the liner, the pad material beneath the tear should be screened to ensure that fluids from the containment have not contaminated the pad surface material. The Department requests that the outcome of the screening be provided once complete.

Though containment is in place for the frac tank batteries on site, one frac tank was observed to be situated outside of containment. Though this tank was apparently empty

2566808 Primary Facility 2017-03-02 Routine/Complete Inspection No Violations Noted Chief should provide documentation that the damaged sock and ruts identified in this report have been repaired or addressed otherwise. No violations cited.
2635928 Primary Facility 2017-09-14 Drilling/Alteration No Violations Noted Work over rig on location. The 1H S and 2H N well were in production phase. No leaks from production equipment. No leaks detected on pad surface from standing water and ditches.
2791418 Primary Facility 2018-10-18 Administrative/File Review Violation(s) Noted Administrative Inspection created to cite a violation against a well in which Chief entered the wellbore less than eight hours after cementing the casing. This inspection/violation is part of a CACP found under Enforcement Record ID #368514.
2791577 Primary Facility 2018-10-18 Routine/Complete Inspection No Violations Noted Arrived onsite for a routine inspection at 13:09; weather was ~42 °F, sunny, breezy. The E&S permit for this site is still active and expires 9/29/2020. There were some shallow puddles on the pad.

There were 4 properly tagged Marcellus wells staged for production. Each well cellar contained water; no bubbling was observed. There were 4 GPUs and 4 produced water tanks onsite and in secondary containment. A row of temporary flowback tanks remained onsite and in secondary containment.

At the time of inspection all PCSM appeared to be installed and functioning as intended. The site was >70% vegetative cover and no E&S issues were observed. The gravel portion of the pad appeared to remain at its full size. Some compost filter sock remained onsite.

It is recommended that temporary E&S measures be removed once permanent stabilization has been achieved.

No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2791418 831076 2018-10-18 2018-10-18 78a85(c)4 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
831076 368514 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-10-18 2018-10-18 $220,000.00 $220,000.00

For data sources see[6]

References