If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-015-23424 | | Well ID: 37-015-23424 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.794314, -76.848631 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 07 | + | | Spud Date: 2018-07-12 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2018-04-17 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 79: | Line 104: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 84: | Line 110: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[REPSOL OIL & GAS USA LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
| Synthetic Liner Materials (in Tons) RWC 806 | | Synthetic Liner Materials (in Tons) RWC 806 | ||
| style="text-align: right;" | 0.52 Tons | | style="text-align: right;" | 0.52 Tons | ||
Line 96: | Line 117: | ||
| 8-0728-0004/013 | | 8-0728-0004/013 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[REPSOL OIL & GAS USA LLC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
| style="text-align: right;" | 1,257.29 Tons | | style="text-align: right;" | 1,257.29 Tons | ||
Line 102: | Line 124: | ||
| 101243 | | 101243 | ||
|- | |- | ||
− | | 2019 | + | | 2018 |
+ | | [[REPSOL OIL & GAS USA LLC]] | ||
+ | | Drill Cuttings (in Tons) RWC 810 | ||
+ | | style="text-align: right;" | 15.48 Tons | ||
+ | | LANDFILL | ||
+ | | 8-0728-0004/013 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[REPSOL OIL & GAS USA LLC]] | ||
| Synthetic Liner Materials (in Tons) RWC 806 | | Synthetic Liner Materials (in Tons) RWC 806 | ||
| style="text-align: right;" | 0.62 Tons | | style="text-align: right;" | 0.62 Tons | ||
Line 108: | Line 138: | ||
| 8-0728-0004/013 | | 8-0728-0004/013 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[REPSOL OIL & GAS USA LLC]] | ||
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | ||
| style="text-align: right;" | 0.04 Tons | | style="text-align: right;" | 0.04 Tons | ||
Line 213: | Line 244: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-015-23424 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.794314,"lon":-76.848631,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Columbia Township | |
Operator Name: REPSOL OIL & GAS USA LLC | |
Well Pad ID: 155127 | |
Farm/Lease Name: MONRO (03-142-07) G 7H | |
License Status: Active | |
Spud Date: 2018-07-12 | |
Permit Date: 2018-04-17 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.794314 | |
Longitude: -76.848631 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials (in Tons) RWC 806 | 0.52 Tons | LANDFILL | 8-0728-0004/013 |
2018 | REPSOL OIL & GAS USA LLC | Drill Cuttings (in Tons) RWC 810 | 1,257.29 Tons | LANDFILL | 101243 |
2018 | REPSOL OIL & GAS USA LLC | Drill Cuttings (in Tons) RWC 810 | 15.48 Tons | LANDFILL | 8-0728-0004/013 |
2019 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials (in Tons) RWC 806 | 0.62 Tons | LANDFILL | 8-0728-0004/013 |
2019 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2745557 | Primary Facility | 2018-06-26 | Preoperation Inspection | No Violations Noted | Brubacher is working the access road with a dozer and roller today. Repsol plans to spud the future Marcellus Shale wells here soon. JLP |
2752106 | Primary Facility | 2018-07-16 | Routine/Complete Inspection | No Violations Noted | Warm/sunny at time of inspection.
Conductor only |
2789138 | Primary Facility | 2018-10-16 | Routine/Complete Inspection | No Violations Noted | Could not access well pad at time of visit due to construction/installation of production lines.
Inspection incomplete. Will revisit well pad in future days. |
2810567 | Primary Facility | 2018-12-05 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of Repsol Oil & Gas's Monro (03-142) G Well Pad in Columbia Twp, Bradford County on 12/5/2018 at 0830 hours. The weather was 19 degrees and partly cloudy.
Tory Rogers, site safety supervisor, showed me around the site. They are currently drilling on the 6H with the Patterson Rig 805 and just recently started. The 40 gallon cement spill on containment that occurred on 12/3/2018 appeared to be cleaned up and remediated (see photo #1). All fluids observed were frozen, no issues were noted. No erosional issues were observed. All containment looked to be functioning properly. They are using double walled containment around there frac tanks which appeared to be working well. (photo #3). Tory was able to email me some photos taken on the day of the cement spill and a map to show the location (see photos #5, 6, 7, & 8). No violations noted at this time. I departed the site at 0920 hours. |
2816844 | Primary Facility | 2018-12-18 | Drilling/Alteration | No Violations Noted | Arrived onsite to conduct a drilling inspection, located and entered the company mans quarters, the company man was not present, i did not conduct a full inspection due to company man was not present at time of inspection. I spoke to security guard at entrance of well site, he informed me that the company man had just left. I will return at a later date to conduct a full inspection. |
2842227 | Primary Facility | 2019-02-20 | Routine/Complete Inspection | No Violations Noted | I spoke with Shawn Callahan (REM Security & Safety) on site, and spoke with Rudy Yoder by phone. They explained the following: Repsol is rigging down Patterson 805 after drilling 8 Marcellus Shale wells from this pad. This morning ~0930 approx 1/2 quart of oil based drilling mud spilled on the pad. They removed the mud, and some pad material (photo 2) this morning.
I did not take electrical conductivity readings because i did not see any standing liquid on site (all frozen). Air temp 25F, snowing. JLP |
For data sources see[6]