X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-01042"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-01042
 
| Well ID: 37-019-01042
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.809444, -79.963972 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.809444, -79.963972 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Penn Township,_Butler_County,_Pennsylvania|Penn Township]]
 
| Municipality: [[Penn Township,_Butler_County,_Pennsylvania|Penn Township]]
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[TOMBUCO INC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 1/1/1800
+
| Spud Date: 1800-01-01
 
|-
 
|-
 
| Permit Date:  
 
| Permit Date:  
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| [[TOMBUCO INC]]
 
| [[TOMBUCO INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 105.00
 
| style="text-align: right;" | 105.00
 
| style="text-align: right;" | 85
 
| style="text-align: right;" | 85
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[TOMBUCO INC]]
 
| [[TOMBUCO INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 208.00
 
| style="text-align: right;" | 208.00
 
| style="text-align: right;" | 104
 
| style="text-align: right;" | 104
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[TOMBUCO INC]]
 
| [[TOMBUCO INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 250.00
 
| style="text-align: right;" | 250.00
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[TOMBUCO INC]]
 
| [[TOMBUCO INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 125.00
 
| style="text-align: right;" | 125.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[TOMBUCO INC]]
 
| [[TOMBUCO INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 110.00
 
| style="text-align: right;" | 110.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 115: Line 140:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 120: Line 146:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2013-0
+
| 2013
 +
| [[TOMBUCO INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 28.33 Bbl
 
| style="text-align: right;" | 28.33 Bbl
Line 126: Line 153:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2014-0
+
| 2014
 +
| [[TOMBUCO INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 140.00 Bbl
 
| style="text-align: right;" | 140.00 Bbl
Line 132: Line 160:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2016-0
+
| 2016
 +
| [[TOMBUCO INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 91.00 Bbl
 
| style="text-align: right;" | 91.00 Bbl
Line 157: Line 186:
 
| 2205085
 
| 2205085
 
| Primary Facility
 
| Primary Facility
| 08/12/2013
+
| 2013-08-12
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 164: Line 193:
 
| 2210426
 
| 2210426
 
| Primary Facility
 
| Primary Facility
| 10/02/2013
+
| 2013-10-02
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 171: Line 200:
 
| 2215289
 
| 2215289
 
| Primary Facility
 
| Primary Facility
| 10/23/2013
+
| 2013-10-23
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 197: Line 226:
 
| 678379
 
| 678379
 
| 08/12/2013
 
| 08/12/2013
| 10/23/2013
+
| 2013-08-12
 
| 212PRODRPT - Failure to submit production report
 
| 212PRODRPT - Failure to submit production report
 
| Administrative
 
| Administrative
Line 205: Line 234:
 
| 678380
 
| 678380
 
| 08/12/2013
 
| 08/12/2013
| 10/23/2013
+
| 2013-08-12
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 213: Line 242:
 
| 678381
 
| 678381
 
| 08/12/2013
 
| 08/12/2013
| 10/23/2013
+
| 2013-08-12
 
| 78.57PITAPPR - Failure to obtain pit approval/permit
 
| 78.57PITAPPR - Failure to obtain pit approval/permit
 
| Administrative
 
| Administrative
Line 235: Line 264:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 10/23/2013
+
| 2013-10-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 244: Line 273:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 10/23/2013
+
| 2013-10-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 253: Line 282:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 10/23/2013
+
| 2013-10-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 264: Line 293:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 15:28, 20 August 2019

Well Details

Well ID: 37-019-01042
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Penn Township
Operator Name: TOMBUCO INC
Well Pad ID:
Farm/Lease Name: KALTENBACH 6
License Status: Active
Spud Date: 1800-01-01
Permit Date:
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.809444
Longitude: -79.963972

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 TOMBUCO INC 0.00 0 105.00 85 0.00 0
2013 TOMBUCO INC 0.00 0 208.00 104 0.00 0
2014 TOMBUCO INC 0.00 0 250.00 100 0.00 0
2015 TOMBUCO INC 0.00 0 125.00 365 0.00 0
2016 TOMBUCO INC 0.00 0 110.00 365 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 TOMBUCO INC Produced Fluid (in Barrels) 28.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 TOMBUCO INC Produced Fluid (in Barrels) 140.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 TOMBUCO INC Produced Fluid (in Barrels) RWC 802 91.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2205085 Primary Facility 2013-08-12 Routine/Partial Inspection Violation(s) Noted
2210426 Primary Facility 2013-10-02 Routine/Partial Inspection No Violations Noted
2215289 Primary Facility 2013-10-23 Routine/Partial Inspection No Violations Noted
2475596 Primary Facility 2016-04-15 Routine/Partial Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2205085 678379 08/12/2013 2013-08-12 212PRODRPT - Failure to submit production report Administrative
2205085 678380 08/12/2013 2013-08-12 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety
2205085 678381 08/12/2013 2013-08-12 78.57PITAPPR - Failure to obtain pit approval/permit Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
678379 304626 NOV - Notice of Violation Comply/Closed 2013-10-23
678380 304626 NOV - Notice of Violation Comply/Closed 2013-10-23
678381 304626 NOV - Notice of Violation Comply/Closed 2013-10-23

For data sources see[6]

References