X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-21398"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-21398
 
| Well ID: 37-019-21398
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.670162, -79.704763 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.670162, -79.704763 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 06/07/2006
+
| Spud Date: 2006-06-07
 
|-
 
|-
| Permit Date: 6/21/2005
+
| Permit Date: 2005-06-21
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 66
 
| style="text-align: right;" | 66
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 74: Line 99:
 
| style="text-align: right;" | 61
 
| style="text-align: right;" | 61
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 92: Line 117:
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 101: Line 126:
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 110: Line 135:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 119: Line 144:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 128: Line 153:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 137: Line 162:
 
| style="text-align: right;" | 355
 
| style="text-align: right;" | 355
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 146: Line 171:
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 155: Line 180:
 
| style="text-align: right;" | 350
 
| style="text-align: right;" | 350
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 164: Line 189:
 
| style="text-align: right;" | 353
 
| style="text-align: right;" | 353
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 173: Line 198:
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 187: Line 212:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 206: Line 232:
 
| 2030345
 
| 2030345
 
| Primary Facility
 
| Primary Facility
| 12/22/2011
+
| 2011-12-22
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 213: Line 239:
 
| 2323379
 
| 2323379
 
| Primary Facility
 
| Primary Facility
| 11/18/2014
+
| 2014-11-18
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 220: Line 246:
 
| 2426868
 
| 2426868
 
| Primary Facility
 
| Primary Facility
| 11/19/2015
+
| 2015-11-19
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 270: Line 296:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 18:52, 20 August 2019

Well Details

Well ID: 37-019-21398
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Buffalo Township
Operator Name: REDMILL DRILLING
Well Pad ID:
Farm/Lease Name: HOLBEIN MA 3
License Status: Active
Spud Date: 2006-06-07
Permit Date: 2005-06-21
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.670162
Longitude: -79.704763

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 BLX INC 3,867.00 66 0.00 0 0.00 0
2007 BLX INC 25,418.00 61 0.00 0 0.00 0
2008 BLX INC 15,706.00 365 0.00 0 0.00 0
2009 BLX INC 11,695.00 333 0.00 0 0.00 0
2010 BLX INC 10,299.05 346 0.00 0 0.00 0
2011 BLX INC 8,421.04 360 0.00 0 0.00 0
2012 BLX INC 7,779.50 366 0.00 0 0.00 0
2013 REDMILL DRILLING 6,355.01 334 0.00 0 0.00 0
2014 REDMILL DRILLING 6,476.15 355 0.00 0 0.00 0
2015 REDMILL DRILLING 5,605.39 347 0.00 0 0.00 0
2016 REDMILL DRILLING 5,960.06 350 0.00 0 0.00 0
2017 REDMILL DRILLING 5,539.23 353 0.00 0 0.00 0
2018 REDMILL DRILLING 5,269.16 362 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2030345 Primary Facility 2011-12-22 Site Restoration No Violations Noted
2323379 Primary Facility 2014-11-18 Routine/Partial Inspection No Violations Noted
2426868 Primary Facility 2015-11-19 Routine/Partial Inspection No Violations Noted
2534575 Primary Facility 2016-11-01 Routine/Partial Inspection No Violations Noted
2654176 Primary Facility 2017-10-24 Routine/Partial Inspection No Violations Noted This well falls within the 2000' protective boundary of the Hughes Storage field. Well integrity appeared to be in good condition, with no signs of any leaks or spills at the site. Any corrosion was superficial.

At the time of inspection, well appeared to be producing. All valves were open. Annulus for casing is closed. Well has a separator, pump jack, and 2 tanks. The tanks are within an earthen dike. The larger tank is labeled for oil and the smaller is for brine. Well is properly labeled.

For data sources see[5]

References