X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-22454"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-22454
 
| Well ID: 37-019-22454
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.822781, -79.752497 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.822781, -79.752497 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/28/2015
+
| Spud Date: 2015-07-28
 
|-
 
|-
| Permit Date: 7/24/2015
+
| Permit Date: 2015-07-24
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 45: Line 45:
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | title = Oil and Gas Well Pad Report
 
  | title = Oil and Gas Well Pad Report
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Operator Name
 
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
|-
 
| 2015
 
| [[XTO ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2016
 
| [[XTO ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2017
 
| [[XTO ENERGY INC]]
 
| style="text-align: right;" | 1,167,191.00
 
| style="text-align: right;" | 356
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 75.00
 
| style="text-align: right;" | 202
 
|-
 
| 2018
 
| [[XTO ENERGY INC]]
 
| style="text-align: right;" | 922,596.51
 
| style="text-align: right;" | 353
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2019
 
| [[XTO ENERGY INC]]
 
| style="text-align: right;" | 225,518.63
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 1.67
 
| style="text-align: right;" | 31
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Production Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2015-2
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 1,503.64 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2016-2
 
| Fracturing Fluid Waste (in Barrels) RWC 805
 
| style="text-align: right;" | 71.70 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2016-2
 
| Fracturing Fluid Waste (in Barrels) RWC 805
 
| style="text-align: right;" | 6,140.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-2
 
| Fracturing Fluid Waste (in Tons) RWC 805
 
| style="text-align: right;" | 47.55 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| 101674
 
|-
 
| 2017-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,425.00 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 715.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2017-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,820.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2017-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,030.32 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 46.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 603.00 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 781.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2017-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 322.69 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2017-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,914.30 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,472.00 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 450.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2017-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 400.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2017-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 742.51 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 371.62 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 90.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2017-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 520.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2017-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,850.04 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 480.00 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 449.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2017-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 330.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2017-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,403.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,145.89 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 565.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 559.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2017-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,058.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,836.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,766.64 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 240.29 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 360.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,987.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 601.75 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 110.75 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 240.35 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,292.10 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 604.95 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 662.93 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 409.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 532.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 91.00 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,496.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,895.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,517.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,130.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 860.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,080.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,300.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 985.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 847.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 84.79 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 200.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 606.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 225.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 659.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 122.16 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 992.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 333.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 765.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 360.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 327.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 330.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 186.00 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 123.47 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-20114
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 240.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 424.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2393920
 
| Primary Facility
 
| 07/28/2015
 
| Routine/Partial Inspection
 
| No Violations Noted
 
|
 
|-
 
| 2398727
 
| Primary Facility
 
| 08/14/2015
 
| Routine/Partial Inspection
 
| No Violations Noted
 
|
 
|-
 
| 2407640
 
| Primary Facility
 
| 09/16/2015
 
| Drilling/Alteration
 
| No Violations Noted
 
|
 
|-
 
| 2486240
 
| Primary Facility
 
| 2016-05-18
 
| Complaint Inspection
 
| No Violations Noted
 
|
 
|-
 
| 2535909
 
| Primary Facility
 
| 2016-11-14
 
| Administrative/File Review
 
| No Violations Noted
 
|
 
|-
 
| 2544149
 
| Primary Facility
 
| 2016-12-02
 
| Routine/Partial Inspection
 
| No Violations Noted
 
|
 
|-
 
| 2583110
 
| Primary Facility
 
| 2017-04-05
 
| Routine/Partial Inspection
 
| No Violations Noted
 
|
 
|-
 
| 2681468
 
| Primary Facility
 
| 2018-01-10
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| On 1/10/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at entrance. Three wells properly tagged and in production. Four 400 bbl production tanks in containment. Snow on ground. No apparent issues.
 
|-
 
| 2698875
 
| Primary Facility
 
| 2018-02-27
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| On site for a routine partial inspection.
 
 
All wells on site are in production. Well tags in place. Wellheads fenced and protected with a jersey barrier.
 
 
Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad.
 
 
All temporary E/S controls removed.  PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated.
 
|-
 
| 2835582
 
| Primary Facility
 
| 2019-02-04
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| On 2/4/2019, WQS Brian MacQuarrie onsite. Site sign posted at entrance to site. Access road maintained. Three wells in production, 2H(019-22445), 6H(019-22446) and 10H(019-22454). Tank battery consists of four 400 bbl tanks installed within containment. Post construction BMPs maintained.
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Compliance Report
 
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| date = 2019-05-20
Line 680: Line 60:
 
|-
 
|-
 
| 1
 
| 1
| 05/02/2016
+
| 2016-05-02
| 06/21/2016
+
| 2016-06-21
 
| style="text-align: right;" | 6239
 
| style="text-align: right;" | 6239
 
| style="text-align: right;" | 14,865,800.0
 
| style="text-align: right;" | 14,865,800.0
Line 958: Line 338:
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-, mono-C10-14-alkyl esthers, phosphates
+
| Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-,<br/> mono-C10-14-alkyl esthers, phosphates
 
| 68585-36-4
 
| 68585-36-4
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
Line 994: Line 374:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 1,167,191.00
 +
| style="text-align: right;" | 356
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 75.00
 +
| style="text-align: right;" | 202
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 922,596.51
 +
| style="text-align: right;" | 353
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 225,518.63
 +
| style="text-align: right;" | 90
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1.67
 +
| style="text-align: right;" | 31
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Drill Cuttings (in Tons)
 +
| style="text-align: right;" | 1,503.64 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Fracturing Fluid Waste (in Barrels) RWC 805
 +
| style="text-align: right;" | 6,140.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Fracturing Fluid Waste (in Barrels) RWC 805
 +
| style="text-align: right;" | 71.70 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Fracturing Fluid Waste (in Tons) RWC 805
 +
| style="text-align: right;" | 47.55 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 101674
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 578.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 7,035.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 5,552.04 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 18,785.24 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2017
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3,943.68 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 12,096.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 320.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 122.16 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2018
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 204.79 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 360.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1,519.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW009
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 186.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
|  34-133-24189
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 900.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 123.47 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-20114
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2393920
 +
| Primary Facility
 +
| 2015-07-28
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2398727
 +
| Primary Facility
 +
| 2015-08-14
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2407640
 +
| Primary Facility
 +
| 2015-09-16
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2486240
 +
| Primary Facility
 +
| 2016-05-18
 +
| Complaint Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2535909
 +
| Primary Facility
 +
| 2016-11-14
 +
| Administrative/File Review
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2544149
 +
| Primary Facility
 +
| 2016-12-02
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2583110
 +
| Primary Facility
 +
| 2017-04-05
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2681468
 +
| Primary Facility
 +
| 2018-01-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 1/10/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at entrance. Three wells properly tagged and in production. Four 400 bbl production tanks in containment. Snow on ground. No apparent issues.
 +
|-
 +
| 2698875
 +
| Primary Facility
 +
| 2018-02-27
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| On site for a routine partial inspection.
 +
 +
All wells on site are in production. Well tags in place. Wellheads fenced and protected with a jersey barrier.
 +
 +
Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad.
 +
 +
All temporary E/S controls removed.  PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated.
 +
|-
 +
| 2835582
 +
| Primary Facility
 +
| 2019-02-04
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| On 2/4/2019, WQS Brian MacQuarrie onsite. Site sign posted at entrance to site. Access road maintained. Three wells in production, 2H(019-22445), 6H(019-22446) and 10H(019-22454). Tank battery consists of four 400 bbl tanks installed within containment. Post construction BMPs maintained.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 20:49, 20 August 2019

Well Details

Well ID: 37-019-22454
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clearfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 152624
Farm/Lease Name: GALAN C UNIT 10H
License Status: Active
Spud Date: 2015-07-28
Permit Date: 2015-07-24
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.822781
Longitude: -79.752497

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-05-02 2016-06-21 6239 14,865,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HC-7.5 C&J Well Services Bulk Acid Hydrochloric Acid 7647-01-0 7.5 0.094004 0
BIO-CLEAR 2000 C&J Well Services Biocides 2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.006219 0
SI-6 PA-Only C&J Well Services PA-Proprietary CJENERGY-Phosphate-00040 Proprietary 6 0.001089 0
Monoethanolamine hydrochloride 2002-24-6 2 0.000363 0
Ammonium Chloride 12125-02-9 2 0.000363 0
Methanol 67-56-1 1 0.000182 0
Sand C&J Well Services Sand - Bulk - Pennsylvania Crystalline Silica, quartz 14808-60-7 99.9 2.28715 0
Iron Oxide 1309-37-1 0.1 0.000779 0
Iron Oxide 1309-37-1 0.1 0.004483 0
Iron Oxide 1309-37-1 0.1 0.002289 0
Aluminum Oxide 1344-28-1 1.1 0.049314 0
Crystalline Silica, quartz 14808-60-7 99.9 4.47863 0
Titanium Oxide 13463-67-7 0.1 0.000779 0
Titanium Oxide 13463-67-7 0.1 0.004483 0
Titanium Oxide 13463-67-7 0.1 0.002289 0
Aluminum Oxide 1344-28-1 1.1 0.025184 0
Crystalline Silica, quartz 14808-60-7 99.9 0.777953 0
Aluminum Oxide 1344-28-1 1.1 0.008566 0
FR-16 PA-Only C&J Well Services PA-Proprietary Distillates (Petroleum), Hydrotreated Light 64742-47-8 45 0.039245 0
Ethylene Glycol 107-21-1 5 0.004361 0
HC-15 C&J Well Services Bulk Acid Hydrochloric Acid 7647-01-0 15 0.005282 0
CI-3 C&J Well Services Acid Corrosion Inhibitors 1-DECANOL 112-30-1 5 0.00006000 0
1-OCTANOL 111-87-5 2.5 0.00003000 0
Dimethylformamide 68-12-2 20 0.000239 0
Nonyphenol (branched), ethoxylated 127087-87-0 5 0.00006000 0
Ethylene Glycol 107-21-1 40 0.000477 0
Isopropyl Alcohol 67-63-0 2.5 0.00003000 0
Triethyl Phosphate 78-40-0 2.5 0.00003000 0
Cinnamaldehyde 104-55-2 15 0.000179 0
2-Butoxyethanol 111-76-2 15 0.000179 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.000179 0
Water XTO Energy/ExxonMobil Carrier Water 7732-18-5 100 91.0328 0
Other Ingredients C&J Well Services Other Ingredients CJENERGY-Surfactant-00026 Proprietary 1 0.000872 0
Water 7732-18-5 85 0.029929 0
Water 7732-18-5 31 0.027035 0
CJENERGY-Polymer-00024 Proprietary 35 0.030524 0
2-Propenamide as residual 79-06-1 0.1 0.00008700 0
Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-,
mono-C10-14-alkyl esthers, phosphates
68585-36-4 3 0.002616 0
Water 7732-18-5 96 0.017428 0
CJENERGY-Surfactant-00025 Proprietary 3 0.002616 0
Water 7732-18-5 92.5 1.15939 0
Alcohols, C12-18, ethoxylated propoxylated 69227-21-0 2 0.001744 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2017 XTO ENERGY INC 1,167,191.00 356 0.00 0 75.00 202
2018 XTO ENERGY INC 922,596.51 353 0.00 0 0.00 0
2019 XTO ENERGY INC 225,518.63 90 0.00 0 1.67 31

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 XTO ENERGY INC Drill Cuttings (in Tons) 1,503.64 Tons LANDFILL 100585
2016 XTO ENERGY INC Fracturing Fluid Waste (in Barrels) RWC 805 6,140.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 XTO ENERGY INC Fracturing Fluid Waste (in Barrels) RWC 805 71.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Fracturing Fluid Waste (in Tons) RWC 805 47.55 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2017 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 578.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 7,035.50 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 5,552.04 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 18,785.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 3,943.68 Bbl INJECTION DISPOSAL WELL 34-133-21076
2018 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 12,096.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 320.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 122.16 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 204.79 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 360.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 1,519.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 186.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 900.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 123.47 Bbl INJECTION DISPOSAL WELL 34-133-20114

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2393920 Primary Facility 2015-07-28 Routine/Partial Inspection No Violations Noted
2398727 Primary Facility 2015-08-14 Routine/Partial Inspection No Violations Noted
2407640 Primary Facility 2015-09-16 Drilling/Alteration No Violations Noted
2486240 Primary Facility 2016-05-18 Complaint Inspection No Violations Noted
2535909 Primary Facility 2016-11-14 Administrative/File Review No Violations Noted
2544149 Primary Facility 2016-12-02 Routine/Partial Inspection No Violations Noted
2583110 Primary Facility 2017-04-05 Routine/Partial Inspection No Violations Noted
2681468 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted On 1/10/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at entrance. Three wells properly tagged and in production. Four 400 bbl production tanks in containment. Snow on ground. No apparent issues.
2698875 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

All wells on site are in production. Well tags in place. Wellheads fenced and protected with a jersey barrier.

Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad.

All temporary E/S controls removed. PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated.

2835582 Primary Facility 2019-02-04 Routine/Partial Inspection No Violations Noted On 2/4/2019, WQS Brian MacQuarrie onsite. Site sign posted at entrance to site. Access road maintained. Three wells in production, 2H(019-22445), 6H(019-22446) and 10H(019-22454). Tank battery consists of four 400 bbl tanks installed within containment. Post construction BMPs maintained.

For data sources see[7]

References