If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-019-22805 | | Well ID: 37-019-22805 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.885150, -80.008336 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 01 | + | | Spud Date: 2019-01-28 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2019-01-14 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 79: | Line 104: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 84: | Line 110: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[XTO ENERGY INC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,228.62 Tons |
| LANDFILL | | LANDFILL | ||
| 100585 | | 100585 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
− | + | | [[XTO ENERGY INC]] | |
− | | | + | | Synthetic Liner Materials (in Tons) RWC 806 |
− | + | | style="text-align: right;" | 0.74 Tons | |
− | |||
− | |||
− | |||
− | | | ||
− | | style="text-align: right;" | | ||
| LANDFILL | | LANDFILL | ||
| 100585 | | 100585 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[XTO ENERGY INC]] | ||
| Drilling Fluid Waste (in Barrels) RWC 803 | | Drilling Fluid Waste (in Barrels) RWC 803 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,413.32 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
Line 185: | Line 202: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-019-22805 | |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Connoquenessing Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 151447 | |
Farm/Lease Name: GUIHER UNIT 6H | |
License Status: Active | |
Spud Date: 2019-01-28 | |
Permit Date: 2019-01-14 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.885150 | |
Longitude: -80.008336 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | XTO ENERGY INC | Drill Cuttings (in Tons) RWC 810 | 1,228.62 Tons | LANDFILL | 100585 |
2019 | XTO ENERGY INC | Synthetic Liner Materials (in Tons) RWC 806 | 0.74 Tons | LANDFILL | 100585 |
2019 | XTO ENERGY INC | Drilling Fluid Waste (in Barrels) RWC 803 | 1,413.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2832555 | Primary Facility | 2019-01-28 | Drilling/Alteration | No Violations Noted | Received spud notification for January 24th 2019. Rig is currently drilling down to approximately 40' with a 30" hole to set 24" conductor pipe. After conductor pipe is set a 20" mouse hole will be drilled to 75' and a 12 3/4" casing will be set. Drill cuttings are being put into a roll off container. 10' diameter by 8' deep cellars have already been constructed and set. 4 enclosed roll off containers are onsite. Received spud notice in conjunction with KYNE 019-22806 and KYNE 019-22804. Spud notifications are located at the same pad location of completed wells 019-22264, 019-22265, and 019-22266
Note CDS (contractor) onsite to install sound walls. |
2835529 | Primary Facility | 2019-02-04 | Routine/Partial Inspection | No Violations Noted | On 2/4/2019, WQS Brian MacQuarrie onsite. While onsite meet with Tom Baun-XTO Energy. Currently, the Kyne 4H (019-22804), Guiher 6H (019-22805) and Kyne 5H (019-22806) are being drilled. Previously, the 1H (019-22264), 2H(019-22265) and 3H(019-22266) were drilled and in production. Production equipment onsite consists of four 400 bbl production tanks installed within stainless steel containment structure and three gas processing units. Soundwall installed around perimeter of well pad. Previously disturbed areas stabilized with vegetative growth. |
2839755 | Primary Facility | 2019-02-13 | Routine/Partial Inspection | No Violations Noted | On 2/13/2019, WQS Brian MacQuarrie onsite. While onsite meet with Chris Ewing (Drill manager XTO Energy). Appalachian Drill rig #1 onsite drilling the Guiher 6H (019-22805). The Kyne 4H (019-22804) was already drilled. The Kyne 5H (019-22806) will be drilled next.
Well site secondary containment setup. Previously disturbed areas stabilized with vegetative growth. |
For data sources see[6]