X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-37474"

m
m
Line 549: Line 549:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 554: Line 555:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2013-S02
+
| 2013
 +
| [[XTO ENERGY INC]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 360.00 Tons
 
| style="text-align: right;" | 360.00 Tons
Line 560: Line 562:
 
| 100434
 
| 100434
 
|-
 
|-
| 2019-M01
+
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Waste Water Treatment Sludge (in Tons) RWC 804
 +
| style="text-align: right;" | 54.49 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 101674
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 150.00 Bbl
 
| style="text-align: right;" | 150.00 Bbl
Line 566: Line 576:
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2019-M01
+
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 53.51 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,450.00 Bbl
 
| style="text-align: right;" | 2,450.00 Bbl
Line 572: Line 590:
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2019-M01
+
| 2019
 +
| [[XTO ENERGY INC]]
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 3.59 Tons
 
| style="text-align: right;" | 3.59 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100434
 
| 100434
|-
 
| 2019-M02
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 53.51 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2019-M02
 
| Waste Water Treatment Sludge (in Tons) RWC 804
 
| style="text-align: right;" | 54.49 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| 101674
 
 
|-
 
|-
 
|}
 
|}

Revision as of 21:32, 20 August 2019

Well Details

Well ID: 37-063-37474
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Brush Valley Township
Operator Name: XTO ENERGY INC
Well Pad ID: 147241
Farm/Lease Name: JONES A UNIT 1H
License Status: Active
Spud Date: 2013-08-19
Permit Date: 2012-12-11
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.482919
Longitude: -79.143758

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-12-19 2018-12-31 7050 6,991,780.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Polyethylene glycol 25322-68-3 50 0.011363 0
Crystalline Silica, quartz 14808-60-7 99.9 4.77992 0
Sodium Acetate Anhydrous 127-09-3 3 0.002546 0
Water 7732-18-5 60 0.011948 0
Aluminum Oxide 1344-28-1 1.1 0.034496 0
Ethylene Glycol 107-21-1 40 0.000816 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.000204 0
Acrylamide as residual 79-06-1 0.1 0.00002300 0
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 30 0.025464 0
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.006818 0
Water 7732-18-5 30 0.025464 0
Alcohols, C12-15-branched and linear,
ethoxylated propoxylated
120313-48-6 2 0.001698 0
CJENERGY-Emulsifier-47 Proprietary 1 0.000229 0
Anionic Polyacrylamide 38193-60-1 30 0.006879 0
2-Propenamide as residual 79-06-1 0.1 0.00008500 0
Water 7732-18-5 20 0.000408 0
Water 7732-18-5 60 0.013758 0
Hydrochloric Acid 7647-01-0 7.5 0.078242 0
Aluminum Oxide 1344-28-1 1.1 0.052632 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 30 0.006879 0
Water 7732-18-5 28.5 0.006477 0
Alcohol C12-15 Ethoxylate 68131-39-5 8.5 0.000173 0
Ammonium Chloride 12125-02-9 1.2 0.000239 0
Dipropylene Glycol Monomethyl Ether 34590-94-8 20 0.000408 0
Aluminum Oxide 1344-28-1 1.1 0.022813 0
Crystalline Silica, quartz 14808-60-7 99.9 3.1329 0
Titanium Oxide 13463-67-7 0.1 0.003136 0
Water 7732-18-5 92.5 0.964979 0
Cinnamaldehyde 104-55-2 10 0.000204 0
Titanium Oxide 13463-67-7 0.1 0.002074 0
CJENERGY-Buffering Agent-45 Proprietary 17 0.003898 0
Ethylene Glycol 107-21-1 60 0.011948 0
Ethoxylated Sorbitan Monooleate 9005-65-6 1 0.000849 0
Iron Oxide 1309-37-1 0.1 0.002074 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 35 0.029708 0
Formic Acid 64-18-6 10 0.000204 0
Water 7732-18-5 85 0.026327 0
Ethylene Glycol 107-21-1 5 0.004244 0
Isopropanol 67-63-0 2.4 0.00004900 0
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.001147 0
Iron Oxide 1309-37-1 0.1 0.004785 0
Titanium Oxide 13463-67-7 0.1 0.004785 0
Hydrochloric Acid 7647-01-0 15 0.004646 0
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat
e
108818-88-8 2 0.001698 0
Iron Oxide 1309-37-1 0.1 0.003136 0
Sorbitan Monooleate 1338-43-8 2 0.001698 0
CJENERGY-Surfactant-46 Proprietary 3 0.000688 0
Crystalline Silica, quartz 14808-60-7 99.9 2.07183 0
CJENERGY-Phosphate-00040 Proprietary 10 0.001991 0
FR-28 PA-Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
BIO-CLEAR 2000 C&J Energy Services Biocides Listed Below Listed Below 0 0 0
HC-15 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0
Sand C&J Energy Services Sand - Bulk - Pennsylvania Listed Below Listed Below 0 0 0
CI-7 C&J Energy Services Acid Corrosion Inhibitors Listed Below Listed Below 0 0 0
SI-8 PA-Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
HC-7.5 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0
FR-16 C&J Energy Services Friction Reducer Listed Below Listed Below 0 0 0
Water XTO Energy/ExxonMobil Carrier Fluid Water 7732-18-5 100 88.7787 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2017 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2019 XTO ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings (in Tons) 360.00 Tons LANDFILL 100434
2019 XTO ENERGY INC Waste Water Treatment Sludge (in Tons) RWC 804 54.49 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2019 XTO ENERGY INC Other Oil & Gas Wastes (in Barrels) RWC 899 150.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Synthetic Liner Materials (in Tons) RWC 806 53.51 Tons LANDFILL 100585
2019 XTO ENERGY INC Produced Fluid (in Barrels) RWC 802 2,450.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Synthetic Liner Materials (in Tons) RWC 806 3.59 Tons LANDFILL 100434

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2198374 Primary Facility 2013-08-22 Drilling/Alteration No Violations Noted
2199592 Primary Facility 2013-08-19 Routine/Complete Inspection No Violations Noted Pre-op inspt. At time of inspection, drilling not yet commenced. Electronic spud notification indicates commencement of drilling to occur today. As per e-mail from XTO rep Scott Arnold, installation activities for two cellars and one conductor hole are to begin at approximately 1300. Site ID sign in place at entrance, in compliance with Act 9 standards.Drill permit, E&S plan, PPC plan, PCSM all on-site.Site located within state game lands.Access road in good condition.Final construction measures currently being performed on rock channel at base of fill slope at back right corner of pad when standing at pad entrance.Construction to be completed by COB today.BMPs implemented as outlined in E&S plan and installed alongside AR and around pad perimeter with exception of one AR culvert outlet.Spoke to Operator rep Terry Miller who stated that one access road culvert rock channel outlet not yet installed due to potential concerns with underground gas line;Dept recommended placing rip-rap at outlet as temporary measure. Additional comments on paper copy.
2200557 Primary Facility 2013-08-29 Drilling/Alteration No Violations Noted
2202179 Primary Facility 2013-08-29 Routine/Complete Inspection No Violations Noted Rig on-site, in process of cementing.Well spudded on 8/19/2013.Drill rig, equipment on secondary containment.Site ID sign in place at entrance, in compliance with Act 9 standards. Drill permit, E&S plan, PPC plan, PCSM all on-site.Site located within state game lands. AR in good condition, but Dept recommends entrance is re-rocked to prevent any potential pollution events from occurring.Moderate vegetative growth observed along perimeters of access road; several areas have minimal growth.Dept recommends Opr re-seed/mulch these areas to maintain temporary stabilization.Dept recommends Opr add more rock to left side of access road across from sed pond when approaching pad and place rip-rap at culvert #7 outlet as temporary measure (record 2199592) to prevent any potential pollution events from occurring.Rock channel referenced in 8/19/2013 inspection (record 2199592) completed.BMPs appear to be functioning properly, although due to recent heavy precipitation events, Dept recommends Opr continue to monitor/maintain BMPs. Add'l comments on paper copy
2204820 Primary Facility 2013-09-11 Routine/Complete Inspection No Violations Noted At time of inspection, rig on-site. Well spudded on 8/19/2013Site ID sign in place at entrance, in compliance with Act 9 standards. Drill permit, E&S plan, PPC plan, PCSM all on-site. Site located within state game lands.Moderate vegetative growth observed along perimeters of access road. Access road in good condition, adequately rocked.No E&S issues noted in relation to access road.Rip-rap outlet installed at culvert #7 outlet (inspection record 2199592).Drill rig, equipment, tanks, chemicals on secondary containment.Minor erosion occurring on slope to right of access road entrance to pad when facing rig. Minor sediment from this erosion observed at base of slope in rock-lined ditch. Department notified XTO representative Tom Baun of erosion concerns.Department recommends that Operator address erosion concerns by routinely monitoring this area in order to prevent pollution events due to accelerated erosion and sedimentation and continue to monitor and maintain BMPs, rig secondary containment, access road, and well site as necessary.
2207389 Primary Facility 2013-09-24 Routine/Complete Inspection No Violations Noted At time of inspection, rig on 1H. 2H spudded on 9/19/2013.
2210814 Primary Facility 2013-10-08 Routine/Complete Inspection No Violations Noted Multi-well pad. At time of inspection, drill rig on 2H. 2H spudded on 9/20/2013. 1H spudded on 8/19/2013.
2215488 Primary Facility 2013-10-24 Routine/Complete Inspection No Violations Noted Multi-well pad. At time of inspection, rig not on-site. 1H, 2H both drilled, not yet frac'd. Wells surrounded by gates.
2224940 Primary Facility 2013-11-20 Routine/Complete Inspection No Violations Noted Inspection conducted with Operator representative Tom Baun.
2252797 Primary Facility 2014-03-11 Routine/Complete Inspection No Violations Noted Marcellus. Multi-well pad. At time of inspection, 1H, 2H both drilled, not yet frac'd. Drill Deeper for 1H issued on 12/16/13. Wells labeled, surrounded by gates.
2300116 Primary Facility 2014-08-26 Routine/Complete Inspection No Violations Noted
2312205 Primary Facility 2014-10-09 Routine/Complete Inspection No Violations Noted Marcellus. Multi-well pad. At time of inspection, 1H, 2H both drilled, not yet frac'd. Drill Deeper for 1H issued on 12/16/2013. Inactive status granted 10/1/2014.
2338074 Primary Facility 2015-01-21 Routine/Complete Inspection No Violations Noted Marcellus. Multi-well pad. At time of inspection, 1H, 2H both drilled, not yet frac'd. Drill Deeper for 1H issued on 12/16/2013. Inactive status granted 10/1/2014.
2612159 Primary Facility 2017-06-26 Site Restoration No Violations Noted Multi-well pad. Marcellus. At time of inspection, 1H, 2H both drilled, not yet frac'd. Inactive status granted 10/1/2014.

Wells labeled, surrounded by gates.

For data sources see[7]

References