X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-021-21176"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-021-21176
 
| Well ID: 37-021-21176
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.281483, -78.690058 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.281483, -78.690058 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Plugged OG Well
 
| License Status: Plugged OG Well
 
|-
 
|-
| Spud Date: 05/27/2011
+
| Spud Date: 2011-05-27
 
|-
 
|-
| Permit Date: 3/29/2011
+
| Permit Date: 2011-03-29
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 86:
 
|-
 
|-
 
| 2011
 
| 2011
| [[CHIEF OIL & GAS LLC]]
+
| [[CHEVRON APPALACHIA LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 124: Line 149:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 129: Line 155:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-1
+
| 2011
| Drill Cuttings (in Tons)
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 1,006.43 Tons
+
| Fracing Fluid Waste (in Barrels)
| LANDFILL
+
| style="text-align: right;" | 80.00 Bbl
| 100081
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| EPA ID: 748-163
 
|-
 
|-
| 2011-1
+
| 2011
 +
| [[CHIEF OIL & GAS LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 2,890.00 Bbl
 
| style="text-align: right;" | 2,890.00 Bbl
Line 141: Line 169:
 
| NY STATE #32S11
 
| NY STATE #32S11
 
|-
 
|-
| 2011-2
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align: right;" | 80.00 Bbl
+
| Drill Cuttings (in Tons)
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 1,006.43 Tons
| EPA ID: 748-163
+
| LANDFILL
 +
| 100081
 
|-
 
|-
| 2015-1
+
| 2015
| Drilling Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 33.33 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
|-
 
| 2015-2
 
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 162.33 Bbl
+
| style="text-align: right;" | 195.66 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| WMGR123SW001
Line 178: Line 202:
 
| 1978954
 
| 1978954
 
| Primary Facility
 
| Primary Facility
| 06/01/2011
+
| 2011-06-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 185: Line 209:
 
| 1979806
 
| 1979806
 
| Primary Facility
 
| Primary Facility
| 06/08/2011
+
| 2011-06-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 192: Line 216:
 
| 1985941
 
| 1985941
 
| Primary Facility
 
| Primary Facility
| 06/29/2011
+
| 2011-06-29
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 199: Line 223:
 
| 1985993
 
| 1985993
 
| Primary Facility
 
| Primary Facility
| 06/28/2011
+
| 2011-06-28
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 206: Line 230:
 
| 1986004
 
| 1986004
 
| Primary Facility
 
| Primary Facility
| 06/21/2011
+
| 2011-06-21
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 213: Line 237:
 
| 1986039
 
| 1986039
 
| Primary Facility
 
| Primary Facility
| 06/09/2011
+
| 2011-06-09
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 220: Line 244:
 
| 1986051
 
| 1986051
 
| Primary Facility
 
| Primary Facility
| 06/01/2011
+
| 2011-06-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 227: Line 251:
 
| 2004426
 
| 2004426
 
| Primary Facility
 
| Primary Facility
| 09/13/2011
+
| 2011-09-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 234: Line 258:
 
| 2016194
 
| 2016194
 
| Primary Facility
 
| Primary Facility
| 11/01/2011
+
| 2011-11-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 241: Line 265:
 
| 2020137
 
| 2020137
 
| Primary Facility
 
| Primary Facility
| 11/17/2011
+
| 2011-11-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 248: Line 272:
 
| 2020357
 
| 2020357
 
| Primary Facility
 
| Primary Facility
| 11/17/2011
+
| 2011-11-17
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 255: Line 279:
 
| 2020380
 
| 2020380
 
| Primary Facility
 
| Primary Facility
| 11/15/2011
+
| 2011-11-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 262: Line 286:
 
| 2049816
 
| 2049816
 
| Primary Facility
 
| Primary Facility
| 03/01/2012
+
| 2012-03-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 269: Line 293:
 
| 2058699
 
| 2058699
 
| Primary Facility
 
| Primary Facility
| 04/03/2012
+
| 2012-04-03
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 276: Line 300:
 
| 2067286
 
| 2067286
 
| Primary Facility
 
| Primary Facility
| 05/01/2012
+
| 2012-05-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 283: Line 307:
 
| 2093081
 
| 2093081
 
| Primary Facility
 
| Primary Facility
| 06/12/2012
+
| 2012-06-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 290: Line 314:
 
| 2148495
 
| 2148495
 
| Primary Facility
 
| Primary Facility
| 03/07/2013
+
| 2013-03-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 297: Line 321:
 
| 2385510
 
| 2385510
 
| Primary Facility
 
| Primary Facility
| 06/30/2015
+
| 2015-06-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 304: Line 328:
 
| 2401231
 
| 2401231
 
| Primary Facility
 
| Primary Facility
| 07/08/2015
+
| 2015-07-08
 
| Plugging(Includes Plugged/Mined Through)
 
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
Line 311: Line 335:
 
| 2407456
 
| 2407456
 
| Primary Facility
 
| Primary Facility
| 09/04/2015
+
| 2015-09-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 346: Line 370:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 03:26, 21 August 2019

Well Details

Well ID: 37-021-21176
Loading map...
Country: United States
State: Pennsylvania
County: Cambria
Municipality: Adams Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149074
Farm/Lease Name: PMG RABY UNIT 2H
License Status: Plugged OG Well
Spud Date: 2011-05-27
Permit Date: 2011-03-29
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.281483
Longitude: -78.690058

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 CHIEF OIL & GAS LLC Drilling Fluid Waste (in Barrels) 2,890.00 Bbl LANDFILL NY STATE #32S11
2011 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) 1,006.43 Tons LANDFILL 100081
2015 CHEVRON APPALACHIA LLC Drilling Fluid Waste (in Barrels) 195.66 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1978954 Primary Facility 2011-06-01 Routine/Complete Inspection No Violations Noted spud 5/27/11. sign present, ¿PMG RABY UNIT LEASE.¿ Unable to clearly located 2H permit number on sign or ES plan. Recommend that operator ¿clearly¿ identify well site with multiple permit numbers for each horizontal well being drilled as well as update ES plan to include each well. Temporary containment pad being installed. Rig onsite Appears temporary BMPs are installed&functioning according to plan. Observed sediment trap appeared full, recommend operator continue to monitor & maintain as necessary. No accelerated erosion or sedimentation issues noted, but did observed some (red) discoloration of soil* located behind job trailers and along soil pile; no active discharge or release of fluids observed during this inspection. Due to recent heavy rains and mulch onsite, a follow inspection will be conducted next week to further investigate/monitor/sample area of discoloration if observations illustrate a necessity to do so. No violations noted during this inspection.
1979806 Primary Facility 2011-06-08 Routine/Complete Inspection No Violations Noted
1985941 Primary Facility 2011-06-29 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Third stringer (9 5/8) set at 1805 ft with 561 sks of gas block with 25 bbl return. Current depth was at 12,374 ft. Kick of was 8859 ft. Mud weight was at 12.5. Chief was planning to set pipe and cement on 7/2/11.
1985993 Primary Facility 2011-06-28 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Third stringer (9 5/8) set at 1805 ft with 561 sks of gas block with 25 bbl return. Current depth was at 11,292 ft. UDI process of pulling drilling rods.
1986004 Primary Facility 2011-06-21 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Current depth was at 4826 ft. Chief set 9 5/8 at 1805 ft with 561 sks of gas block with 25 bbl return. Proposed KOP was at 8859 ft.. Meeting held with Highland water sewer and Chief representatives.
1986039 Primary Facility 2011-06-09 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Conductor pipe (20¿) set at 60 ft with 9 yds3 cement (Gas Block) grouted. Second Stringer (13 3/8¿) pipe ran to 590 ft with 415 sks gas block with 9 bbl returns. Current depth was at 988 ft. Chief proposed to set 9 5/8 at 1800 ft. Chief ran cement bond logs on each cement job.
1986051 Primary Facility 2011-06-01 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Site located at the wind farm located in Adams Twp, Gallitzin State Park. Security guard present. Inspected site. Site sign and E&S plan present. Chief setting up UDI 60 rig. Alternate plan approved by PADEP for 2H well.
2004426 Primary Facility 2011-09-13 Routine/Complete Inspection No Violations Noted During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan onsite. Well tag present. Site gated and locked. Well drilled not yet in production. Access road and entrance adequately rocked. Soil pile seeded/mulched. Slopes secured with erosion blankets exhibiting growth. BMPs installed according to plan.no accelerated erosion or sedimentation issues noted. Although red staining near soil pile and near toe slope of pad is observed-again this was attributed to decomposition of mulch/ tress used during pad construction. While on site all parties noted that soil near sediment trap appears discolored with a ¿red/black¿ hue and the liquid contents of sediment trap appear dark in nature as well- it is also observed that large quantity of leaves present in trap. Operator plans to investigate/sample discoloration of both the soil and liquid fraction from near sed trap. 10-20-11: Bases on site inspection and review of operator results it does not appear discoloration is due to spill or release.
2016194 Primary Facility 2011-11-01 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well marker not present. Spud called on 10/31/11. Called Chevron to request well marker placed prior to drilling activity.
2020137 Primary Facility 2011-11-17 Routine/Complete Inspection No Violations Noted At the time of inspection, well ID sign and Es plan present. Share access road stable. Rig onsite actively drilling top hole on 3h, 2h and 1H previously drilled yet not in production. Secondary containment installed beneath rig as well as tanks. Tanks located onsite appear structurally sound. Bmp's installed and functioning according to ES plan. Presviously disturbed areas appear to be seeded and muclhed with observed growth. Operator shall continue to monitor and maintain all bmp's until final/permanent restoration is achieved.
2020357 Primary Facility 2011-11-17 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well head located in secure fence.
2020380 Primary Facility 2011-11-15 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Site sign and E&S plan present. Well head located in secure fence.
2049816 Primary Facility 2012-03-01 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production.
2058699 Primary Facility 2012-04-03 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production.
2067286 Primary Facility 2012-05-01 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production.
2093081 Primary Facility 2012-06-12 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Site sign and E&S plan were present. Gas well is not in production.
2148495 Primary Facility 2013-03-07 Routine/Complete Inspection No Violations Noted On-site meeting with Chevron rep Curtis Small.
2385510 Primary Facility 2015-06-30 Routine/Complete Inspection No Violations Noted At the time of inspection, site sign present. Well head located in secure fence. As per the reviewed plan, Chevron reviewed previous cement and casing for well 1H. All cement for casing was cemented to surface. A mechanical plug was set at 8600 feet. The BOP was tested at 250 psi for 5 minutes. The remaining casing from 8600 feet was cemented to 1500 feet where it will be brought to surface on additional cement
2401231 Primary Facility 2015-07-08 Plugging(Includes Plugged/Mined Through) No Violations Noted Chevron contracted Nabors to plug well. Packer set at 1380 feet. Well was flushed to 1700 feet. A total of 100 sack of Class A was used to cement well to surface
2407456 Primary Facility 2015-09-04 Routine/Complete Inspection No Violations Noted Inspection conducted with Operator representative Matt Barch. At time of inspection, wells 2H, 1H, and 3H all appear plugged. Aboveground monuments installed on each well with permit numbers affixed. According to records, drilling occurred 5/28/2011-7/7/2011, inactive status approved 3/8/2012, and per electronic notification submitted by Operator, plugging was scheduled to commence on 6/29/2015.

For data sources see[6]

References