If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 226: | Line 226: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 231: | Line 232: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2013 | + | | 2013 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Drill Cuttings (in Tons) | | Drill Cuttings (in Tons) | ||
| style="text-align: right;" | 14.79 Tons | | style="text-align: right;" | 14.79 Tons | ||
Line 237: | Line 239: | ||
| 100933 | | 100933 | ||
|- | |- | ||
− | | 2013 | + | | 2013 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Drilling Fluid Waste (in Barrels) | | Drilling Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 2,530.00 Bbl | | style="text-align: right;" | 2,530.00 Bbl | ||
Line 243: | Line 246: | ||
| WMGR119 | | WMGR119 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Drill Cuttings (in Tons) | | Drill Cuttings (in Tons) | ||
| style="text-align: right;" | 498.64 Tons | | style="text-align: right;" | 498.64 Tons | ||
Line 249: | Line 253: | ||
| 100933 | | 100933 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
− | | | + | | [[CHIEF OIL & GAS LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 340.00 Bbl | | style="text-align: right;" | 340.00 Bbl | ||
Line 267: | Line 260: | ||
| WMGR123 | | WMGR123 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
− | | | + | | [[CHIEF OIL & GAS LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 3,138.69 Bbl | | style="text-align: right;" | 3,138.69 Bbl | ||
Line 279: | Line 267: | ||
| | | | ||
|- | |- | ||
− | | | + | | 2014 |
− | | | + | | [[CHIEF OIL & GAS LLC]] |
− | | style="text-align: right;" | | + | | Drilling Fluid Waste (in Barrels) |
+ | | style="text-align: right;" | 428.26 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW018 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHIEF OIL & GAS LLC]] | ||
+ | | Fracing Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 3,335.50 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2015 | + | | 2015 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,220.10 Bbl |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 456.33 Bbl |
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[CHIEF OIL & GAS LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 238.92 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | | + | | 2018 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 354.74 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 61.03 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | |
Well ID: 37-131-20350 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.6332,"lon":-75.915694,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Lemon Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 147310 | |
Farm/Lease Name: HARVEY UNIT 3H | |
License Status: Active | |
Spud Date: 2013-11-02 | |
Permit Date: 2013-09-05 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.6332 | |
Longitude: -75.915694 |
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-07-04 | 2014-07-13 | 7764 | 9,285,860.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | MCB-8614 | MULTI-CHEM | BIOCIDE | GLUTARALDEHYDE | 111-30-8 | 30 | 0.02 | 0 |
ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE | 68424-85-1 | 5 | 0.003 | 0 | ||||
Hydrochloric Acid 10-30% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.1 | 0 | |
MCS-2510T | MULTI-CHEM | Scale Inhibitor | ETHYLENE GLYCOL | 107-21-1 | 60 | 0.01 | 0 | |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.9 | 0 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.02 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 685,872.00 | 71 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 2,992,106.25 | 363 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 1,677,360.12 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 889,485.34 | 358 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 843,563.91 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 198,242.74 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | Drill Cuttings (in Tons) | 14.79 Tons | LANDFILL | 100933 |
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste (in Barrels) | 2,530.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings (in Tons) | 498.64 Tons | LANDFILL | 100933 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste (in Barrels) | 340.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Produced Fluid (in Barrels) | 3,138.69 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste (in Barrels) | 428.26 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste (in Barrels) | 3,335.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid (in Barrels) | 1,220.10 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid (in Barrels) RWC 802 | 456.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid (in Barrels) RWC 802 | 238.92 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid (in Barrels) RWC 802 | 354.74 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid (in Barrels) RWC 802 | 61.03 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2221066 | Primary Facility | 2013-11-08 | Drilling/Alteration | No Violations Noted | Northeast rig 11, Comp Man - Ken Silvis Not drilling yet, prob start this afternoon/evening. Continue with work on berms and clearly label all tanks. |
2252317 | Primary Facility | 2014-03-06 | Drilling/Alteration | No Violations Noted | Orion 15, Comp Man - Steve Arrington |
2253623 | Primary Facility | 2014-03-13 | Drilling/Alteration | No Violations Noted | Orion 15, Comp Man - Joe Trevino |
2373135 | Primary Facility | 2015-05-26 | Routine/Partial Inspection | No Violations Noted | |
2380153 | Primary Facility | 2015-04-22 | Routine/Complete Inspection | No Violations Noted | Well in prodcution, gauge reading 1200psi. Cellar filled with water, however no visible bubbling. 6 treaters, 6 tanks on location. |
2597730 | Primary Facility | 2017-05-12 | Routine/Complete Inspection | No Violations Noted | There was no activity at the site during the inspection. I have no comments on the conditions at the site. No violations were noted. |
2597776 | Primary Facility | 2017-05-12 | Routine/Complete Inspection | No Violations Noted | There was no activity occurring at the site during the inspection. I have no comments for the conditions at the site. No violations were notec. |
2751921 | Primary Facility | 2018-07-13 | Routine/Complete Inspection | No Violations Noted | JP Reilly Construction personnel were conducting earth disturbance activity related to the installation of the PCSM. There were no violations noted. If you have any questions, please contact me. |
2830887 | Primary Facility | 2019-01-18 | Routine/Complete Inspection | No Violations Noted | I arrived on site to conduct a routine complete investigation in response to a site restoration extension request received from the Operator. The purpose of this inspection was to ensure the two sediment traps onsite had been converted into infiltration berms and an additional infiltration berm installed along the access road.
After performing an administrative review of the plan and a site inspection, I agree that the aforementioned conditions have been fulfilled. During the inspection, I noticed several of the tops on the annular vent tanks had cracked. Operator, please inspect the area and repair any deficiencies observed. No violations were noted. Please feel free to contact me with any questions. |
For data sources see[7]