X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-065-23970"

m
m
Line 131: Line 131:
 
|-
 
|-
 
| 2002
 
| 2002
| style="text-align: right;" |
+
| [[TARGET ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 248: Line 248:
 
|-
 
|-
 
| 2015
 
| 2015
| style="text-align: right;" |
+
| [[FAIRMAN CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 257: Line 257:
 
|-
 
|-
 
| 2016
 
| 2016
| style="text-align: right;" |
+
| [[FAIRMAN CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 293: Line 293:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 298: Line 299:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 1998-A00
+
| 1998
 +
| [[TARGET ENERGY INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl

Revision as of 08:26, 21 August 2019

Well Details

Well ID: 37-065-23970
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Ringgold Township
Operator Name: FAIRMAN CORP
Well Pad ID:
Farm/Lease Name: HOWARD & BILL AMES 1
License Status: Active
Spud Date: 1996-06-24
Permit Date: 1996-05-21
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.038660
Longitude: -79.200392

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1997 TARGET ENERGY INC 22,798.00 350 0.00 0 0.00 0
1998 TARGET ENERGY INC 8,590.00 212 0.00 0 0.00 0
1999 TARGET ENERGY INC 12,111.00 334 0.00 0 0.00 0
2000 TARGET ENERGY INC 9,104.00 305 0.00 0 0.00 0
2001 TARGET ENERGY INC 4,901.00 365 0.00 0 0.00 0
2002 TARGET ENERGY INC 0.00 0 0.00 0 0.00 0
2003 TARGET ENERGY INC 6,122.00 245 0.00 0 0.00 0
2004 TARGET ENERGY INC 5,105.00 338 0.00 0 0.00 0
2005 TARGET ENERGY INC 4,631.00 334 0.00 0 0.00 0
2006 TARGET ENERGY INC 5,558.00 365 0.00 0 0.00 0
2007 TARGET ENERGY INC 5,052.00 365 0.00 0 0.00 0
2008 TARGET ENERGY INC 2,988.00 335 0.00 0 0.00 0
2009 TARGET ENERGY INC 3,145.00 300 0.00 0 0.00 0
2010 TARGET ENERGY INC 3,187.00 365 0.00 0 0.00 0
2011 TARGET ENERGY INC 2,922.00 365 0.00 0 0.00 0
2012 TARGET ENERGY INC 3,599.00 365 0.00 0 0.00 0
2013 TARGET ENERGY INC 3,107.00 365 0.00 0 0.00 0
2014 FAIRMAN CORP 1,175.86 181 0.00 0 0.00 0
2015 FAIRMAN CORP 0.00 0 0.00 0 0.00 0
2016 FAIRMAN CORP 0.00 0 0.00 0 0.00 0
2017 FAIRMAN CORP 2,872.00 305 0.00 0 0.00 0
2018 FAIRMAN CORP 2,413.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1998 TARGET ENERGY INC Brine 30.00 Bbl Municipal Sewage Treatment Plant PA 0026310

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
572732 Primary Facility 1996-06-25 Drilling/Alteration No Violations Noted
581078 Primary Facility 1999-03-25 Routine/Complete Inspection No Violations Noted

For data sources see[6]

References