X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-065-26927"

m
m
Line 140: Line 140:
 
|-
 
|-
 
| 2016
 
| 2016
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 199,538.00
 
| style="text-align: right;" | 199,538.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 149: Line 149:
 
|-
 
|-
 
| 2017
 
| 2017
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 178,399.60
 
| style="text-align: right;" | 178,399.60
 
| style="text-align: right;" | 357
 
| style="text-align: right;" | 357
Line 158: Line 158:
 
|-
 
|-
 
| 2018
 
| 2018
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 151,209.56
 
| style="text-align: right;" | 151,209.56
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 167: Line 167:
 
|-
 
|-
 
| 2019
 
| 2019
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 37,525.34
 
| style="text-align: right;" | 37,525.34
 
| style="text-align: right;" | 88
 
| style="text-align: right;" | 88
Line 185: Line 185:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 190: Line 191:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-S01
+
| 2011
| Drill Cuttings (in Tons)
+
| [[FLATIRONS DEVELOPMENT LLC]]
| style="text-align: right;" | 3,016.80 Tons
+
| Produced Fluid (in Barrels)
| LANDFILL
+
| style="text-align: right;" | 1,451.00 Bbl
| 101397
+
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 
|-
 
|-
| 2011-S02
+
| 2011
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 520.00 Bbl
 
| style="text-align: right;" | 520.00 Bbl
Line 202: Line 205:
 
| 525-1
 
| 525-1
 
|-
 
|-
| 2011-S02
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[FLATIRONS DEVELOPMENT LLC]]
| style="text-align: right;" | 420.00 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
 
|-
 
|-
| 2011-S02
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[FLATIRONS DEVELOPMENT LLC]]
| style="text-align: right;" | 14,640.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR119
 
|-
 
| 2011-S02
 
 
| Fracturing Fluid Waste (in Tons)
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align: right;" | 43.20 Tons
 
| style="text-align: right;" | 43.20 Tons
Line 220: Line 219:
 
| 101397
 
| 101397
 
|-
 
|-
| 2011-S02
+
| 2011
| Produced Fluid (in Barrels)
+
| [[FLATIRONS DEVELOPMENT LLC]]
| style="text-align: right;" | 100.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 14,640.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0254185
+
| WMGR119
 
|-
 
|-
| 2011-S02
+
| 2011
| Produced Fluid (in Barrels)
+
| [[FLATIRONS DEVELOPMENT LLC]]
| style="text-align: right;" | 425.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-151-21198
 
|-
 
| 2011-S02
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 965.00 Bbl
 
| style="text-align: right;" | 965.00 Bbl
Line 238: Line 233:
 
| 34-155-21893
 
| 34-155-21893
 
|-
 
|-
| 2011-S02
+
| 2011
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,451.00 Bbl
+
| style="text-align: right;" | 425.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23795
+
| 34-151-21198
 
|-
 
|-
| 2012-S01
+
| 2011
| Produced Fluid (in Barrels)
+
| [[FLATIRONS DEVELOPMENT LLC]]
| style="text-align: right;" | 296.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 420.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 525-1
+
| PA0254185
 
|-
 
|-
| 2012-S01
+
| 2011
| Produced Fluid (in Barrels)
+
| [[FLATIRONS DEVELOPMENT LLC]]
| style="text-align: right;" | 998.00 Bbl
+
| Drill Cuttings (in Tons)
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 3,016.80 Tons
| 34-151-23420
+
| LANDFILL
 +
| 101397
 
|-
 
|-
| 2012-S01
+
| 2012
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 3,463.00 Bbl
+
| style="text-align: right;" | 581.00 Bbl
| INJECTION DISPOSAL WELL
 
| 34-155-21893
 
|-
 
| 2012-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 4,606.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23795
 
|-
 
| 2012-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 285.00 Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 525-1
 
| 525-1
 
|-
 
|-
| 2012-S02
+
| 2012
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 192.00 Bbl
+
| style="text-align: right;" | 6,054.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-151-21198
+
| 34-155-23795
 
|-
 
|-
| 2012-S02
+
| 2012
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 577.00 Bbl
+
| style="text-align: right;" | 1,575.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-151-23420
 
| 34-151-23420
 
|-
 
|-
| 2012-S02
+
| 2012
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,448.00 Bbl
+
| style="text-align: right;" | 3,463.00 Bbl
| INJECTION DISPOSAL WELL
 
| 34-155-23795
 
|-
 
| 2013-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 91.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-23614
 
|-
 
| 2013-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 880.00 Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21893
 
| 34-155-21893
 
|-
 
|-
| 2013-S01
+
| 2012
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,444.00 Bbl
+
| style="text-align: right;" | 192.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23795
+
| 34-151-21198
 
|-
 
|-
| 2013-S02
+
| 2013
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 673.00 Bbl
 
| style="text-align: right;" | 673.00 Bbl
Line 316: Line 296:
 
| 34-007-24355
 
| 34-007-24355
 
|-
 
|-
| 2013-S02
+
| 2013
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 527.00 Bbl
+
| style="text-align: right;" | 91.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21893
+
| 34-133-23614
 
|-
 
|-
| 2013-S02
+
| 2013
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 605.00 Bbl
+
| style="text-align: right;" | 1,407.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23795
+
| 34-155-21893
 
|-
 
|-
| 2014-S01
+
| 2013
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,687.81 Bbl
+
| style="text-align: right;" | 2,049.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-007-24355
+
| 34-155-23795
 
|-
 
|-
| 2014-S02
+
| 2014
 +
| [[FLATIRONS DEVELOPMENT LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 531.00 Bbl
+
| style="text-align: right;" | 2,218.81 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-24355
 
| 34-007-24355
 
|-
 
|-
| 2015-M01
+
| 2015
 +
|
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 14,111.00 Bbl
+
| style="text-align: right;" | 16,446.62 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
| 34-007-21847
 
|-
 
|-
| 2015-M02
+
| 2015
| Produced Fluid (in Barrels)
+
|  
| style="text-align: right;" | 225.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M03
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 214.62 Bbl
+
| style="text-align: right;" | 156.57 Bbl
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M04
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 115.00 Bbl
 
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| EPA ID: 748-163
 
| EPA ID: 748-163
 
|-
 
|-
| 2015-M04
+
| 2016
| Produced Fluid (in Barrels)
+
| [[ALLIANCE PETRO CO LLC]]
| style="text-align: right;" | 220.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M05
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 347.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M06
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 118.30 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M07
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 41.57 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| EPA ID: 748-163
 
|-
 
| 2015-M07
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 224.62 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M08
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 222.90 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M09
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 222.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M10
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 215.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M11
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 104.40 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2015-M12
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 220.38 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2016-M12
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 1,039.00 Bbl
+
| style="text-align: right;" | 2,606.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 2D0830792
 
| 2D0830792
 
|-
 
|-
| 2016-S01
+
| 2016
 +
| [[ALLIANCE PETRO CO LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 528.00 Bbl
+
| style="text-align: right;" | 314.40 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| 2D0830792
+
| WMGR123NW009
 
|-
 
|-
| 2016-S01
+
| 2016
 +
| [[ALLIANCE PETRO CO LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 335.20 Bbl
 
| style="text-align: right;" | 335.20 Bbl
Line 442: Line 359:
 
| 34-007-21847
 
| 34-007-21847
 
|-
 
|-
| 2016-S01
+
| 2017
 +
| [[ALLIANCE PETRO CO LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 314.40 Bbl
+
| style="text-align: right;" | 100.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
| WMGR123NW009
+
|  
 
|-
 
|-
| 2016-S02
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[ALLIANCE PETRO CO LLC]]
| style="text-align: right;" | 1,039.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 2D0830792
 
|-
 
| 2017-M01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 35.00 Bbl
 
| style="text-align: right;" | 35.00 Bbl
Line 460: Line 373:
 
|  
 
|  
 
|-
 
|-
| 2017-M03
+
| 2017
 +
| [[ALLIANCE PETRO CO LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 102.08 Bbl
+
| style="text-align: right;" | 1,549.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
|-
 
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 245.00 Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
| 34-007-21847
 
|-
 
|-
| 2017-M05
+
| 2017
 +
| [[ALLIANCE PETRO CO LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 133.00 Bbl
+
| style="text-align: right;" | 102.08 Bbl
| INJECTION DISPOSAL WELL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-007-21847
+
| PA0254185
 
|-
 
|-
| 2017-M06
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[ALLIANCE PETRO CO LLC]]
| style="text-align: right;" | 130.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 225.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 133.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 297.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 133.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 253.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 526: Line 394:
 
|  
 
|  
 
|-
 
|-
| 2018-M03
+
| 2018
 +
| [[ALLIANCE PETRO CO LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 105.00 Bbl
+
| style="text-align: right;" | 1,121.16 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
| 34-007-21847
 
|-
 
|-
| 2018-M04
+
| 2018
 +
| [[ALLIANCE PETRO CO LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 150.00 Bbl
+
| style="text-align: right;" | 470.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028207
 
| PA0028207
 
|-
 
|-
| 2018-M04
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[ALLIANCE PETRO CO LLC]]
| style="text-align: right;" | 130.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 133.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2018-M06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 90.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028207
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 133.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 250.16 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2018-M09
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 110.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028207
 
|-
 
| 2018-M10
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 120.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028207
 
|-
 
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 240.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 130.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2018-M12
 
 
| Waste comment only
 
| Waste comment only
| style="text-align: right;" | Comment
+
| style="text-align: right;" | 0.00
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
| 2019-M01
+
| 2019
 +
| [[ALLIANCE PETRO CO LLC]]
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 240.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028207
 
| PA0028207
 
|-
 
|-
| 2019-M01
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[ALLIANCE PETRO CO LLC]]
| style="text-align: right;" | 102.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
|-
 
| 2019-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 260.00 Bbl
+
| style="text-align: right;" | 362.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
| 34-007-21847
|-
 
| 2019-M03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 120.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0028207
 
 
|-
 
|-
 
|}
 
|}

Revision as of 13:41, 21 August 2019

Well Details

Well ID: 37-065-26927
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Snyder Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID: 148254
Farm/Lease Name: DU3 6 1H
License Status: Active
Spud Date: 2011-02-04
Permit Date: 2011-01-10
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.228319
Longitude: -78.722972

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 FLATIRONS DEVELOPMENT LLC 0.00 0 0.00 0 0.00 0
2011 FLATIRONS DEVELOPMENT LLC 53,765.50 26 0.00 0 0.00 0
2012 FLATIRONS DEVELOPMENT LLC 458,969.22 354 0.00 0 0.00 0
2013 FLATIRONS DEVELOPMENT LLC 288,202.80 365 0.00 0 0.00 0
2014 FLATIRONS DEVELOPMENT LLC 236,515.37 365 0.00 0 0.00 0
2015 FLATIRONS DEVELOPMENT LLC 223,895.57 363 0.00 0 0.00 0
2016 ALLIANCE PETRO CO LLC 199,538.00 365 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 178,399.60 357 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 151,209.56 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 37,525.34 88 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 1,451.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2011 FLATIRONS DEVELOPMENT LLC Fracing Fluid Waste (in Barrels) 520.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2011 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 FLATIRONS DEVELOPMENT LLC Fracturing Fluid Waste (in Tons) 43.20 Tons LANDFILL 101397
2011 FLATIRONS DEVELOPMENT LLC Fracing Fluid Waste (in Barrels) 14,640.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 965.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2011 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 425.00 Bbl INJECTION DISPOSAL WELL 34-151-21198
2011 FLATIRONS DEVELOPMENT LLC Fracing Fluid Waste (in Barrels) 420.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 FLATIRONS DEVELOPMENT LLC Drill Cuttings (in Tons) 3,016.80 Tons LANDFILL 101397
2012 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 581.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2012 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 6,054.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 1,575.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2012 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 3,463.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2012 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 192.00 Bbl INJECTION DISPOSAL WELL 34-151-21198
2013 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 673.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2013 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 91.00 Bbl INJECTION DISPOSAL WELL 34-133-23614
2013 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 1,407.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 2,049.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2014 FLATIRONS DEVELOPMENT LLC Produced Fluid (in Barrels) 2,218.81 Bbl INJECTION DISPOSAL WELL 34-007-24355
2015 Produced Fluid (in Barrels) 16,446.62 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 Produced Fluid (in Barrels) 156.57 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2016 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 2,606.00 Bbl INJECTION DISPOSAL WELL 2D0830792
2016 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 314.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 335.20 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 100.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 35.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 1,549.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 102.08 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2018 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 20.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 1,121.16 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018 ALLIANCE PETRO CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 470.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2018 ALLIANCE PETRO CO LLC Waste comment only 0.00
2019 ALLIANCE PETRO CO LLC Other Oil & Gas Wastes (in Barrels) RWC 899 240.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2019 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 362.00 Bbl INJECTION DISPOSAL WELL 34-007-21847

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1948286 Primary Facility 2011-02-07 Drilling/Alteration No Violations Noted
1948644 Primary Facility 2011-02-09 Drilling/Alteration No Violations Noted
1949391 Primary Facility 2011-02-11 Drilling/Alteration No Violations Noted
1949908 Primary Facility 2011-02-15 Routine/Complete Inspection No Violations Noted
1950545 Primary Facility 2011-02-16 Drilling/Alteration No Violations Noted
1953203 Primary Facility 2011-03-01 Routine/Complete Inspection No Violations Noted
1954048 Primary Facility 2011-03-02 Routine/Complete Inspection No Violations Noted
1956124 Primary Facility 2011-03-10 Routine/Complete Inspection No Violations Noted
1959460 Primary Facility 2011-03-21 Routine/Complete Inspection No Violations Noted
1961024 Primary Facility 2011-03-29 Drilling/Alteration No Violations Noted
1963508 Primary Facility 2011-04-05 Drilling/Alteration No Violations Noted
1964885 Primary Facility 2011-02-10 Administrative/File Review Viol(s) Noted & Immediately Corrected Todd Huey, Flatirons Development, notified the Department that groundwater was encountered during Flatirons' drilling of the well and that Flatirons observed that the artesian flow at the nearby Brockway Borough Municipal Authority Well No. 5 (a public water supply well), had ceased. This unpermitted diminution constitutes pollution to waters of the Commonwealth under the PA Clean Streams Law. The artesian flow of the water supply returned approx. 28 hours later after the surface casing of Flatirons well was set.
1973418 Primary Facility 2011-05-16 Routine/Complete Inspection No Violations Noted
1974498 Primary Facility 2011-05-20 Drilling/Alteration Violation(s) Noted
1974507 Primary Facility 2011-05-18 Drilling/Alteration Violation(s) Noted
1974511 Primary Facility 2011-05-17 Drilling/Alteration No Violations Noted
1983274 Primary Facility 2011-06-17 Compliance Evaluation Outstanding Violations - No Viols Req'd
1987784 Primary Facility 2011-07-13 Compliance Evaluation Outstanding Violations - No Viols Req'd
1995920 Primary Facility 2011-08-10 Routine/Complete Inspection Violation(s) Noted
1998323 Primary Facility 2011-08-24 Compliance Evaluation No Violations Noted
2012815 Primary Facility 2011-10-19 Routine/Complete Inspection No Violations Noted
2017991 Primary Facility 2011-11-01 Drilling/Alteration No Violations Noted
2017996 Primary Facility 2011-11-08 Drilling/Alteration No Violations Noted
2017998 Primary Facility 2011-11-08 Drilling/Alteration No Violations Noted
2019849 Primary Facility 2011-11-14 Drilling/Alteration No Violations Noted
2019853 Primary Facility 2011-11-16 Drilling/Alteration No Violations Noted
2019855 Primary Facility 2011-11-15 Drilling/Alteration No Violations Noted
2024056 Primary Facility 2011-12-02 Drilling/Alteration No Violations Noted
2026571 Primary Facility 2011-12-08 Drilling/Alteration No Violations Noted
2026578 Primary Facility 2011-12-06 Drilling/Alteration No Violations Noted
2026579 Primary Facility 2011-12-07 Drilling/Alteration No Violations Noted
2068598 Primary Facility 2012-04-30 Routine/Complete Inspection No Violations Noted
2135693 Primary Facility 2013-01-31 Routine/Complete Inspection No Violations Noted
2716800 Primary Facility 2018-04-11 Routine/Complete Inspection No Violations Noted This well was drilled in a forested area off of Mt Daniels Road in February 2011. The ESCGP covering this site is ESX10-047-0008 (Dannic Tract Pad 6). No violations were noted during this inspection, but a well tag and site sign are needed.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1964885 608659 02/10/2011 2011-02-10 401CSL - Discharge of pollultional material to waters of Commonwealth. Environmental Health & Safety Artesian flow returned to the Brockway Borough Municipal Authority's well no. 5 after approx 28 hours. See additional comments on inspection screen.
1974498 611543 05/20/2011 2011-05-20 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative
1974507 611545 05/18/2011 2011-05-18 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative
1974507 611546 05/18/2011 2011-05-18 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative
1995920 617822 08/10/2011 2011-08-10 102.4INADPLN - E&S Plan not adequate Administrative Plan not accurate
1995920 617823 08/10/2011 2011-08-10 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Culvert outlet controls not adequate.
1995920 617824 08/10/2011 2011-08-10 402CSL B - Failure to meet requirements of permit, rules and regulations, or order of DEP. Environmental Health & Safety Failure to meet permit requirements.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
608659 269459 NOV - Notice of Violation Comply/Closed 2011-02-15
611543 271054 NOV - Notice of Violation Comply/Closed 2011-07-29
611545 271054 NOV - Notice of Violation Comply/Closed 2011-07-29
611546 271054 NOV - Notice of Violation Comply/Closed 2011-07-29

For data sources see[6]

References