Well ID: 37-081-21431 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.355761,"lon":-77.046013,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Gamble Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: | |
Farm/Lease Name: CHAAPEL HOLLOW UNIT 7H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-28 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.355761 | |
Longitude: -77.046013 |
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2557073 | Primary Facility | 2017-01-26 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 1/26/2017.
I entered the location at 09:05 and began the inspection. At the time of the inspection, the Chaapel Hollow Unit 1H (081-21201) was being produced by flowing gas directly into a tube trailer. Erosion was noted along the access road. The hillside had slumped in several large chunks. This area is currently frozen, but I recommend keeping an eye on this area when the snow melts. The well site is not yet required to be restored because of the active well permit but the same permit has been renewed since 2014 without action. No Violations Noted. |
2617409 | Primary Facility | 2017-07-19 | Complaint Inspection | No Violations Noted | Complaint Inspection; 7/19/2017.
Rebecca Renner and l met with the complainant at 09:00. The complainant had several concerns including the condition of the access road, alleged water coming from the well, production practices, and failure to restore the well site. At the time of the inspection, only the production unit/ separator and were onsite. Equipment previously onsite for compression and trucking the gas offsite has been removed. At the entrance to the (site off Rose Valley Road), the asphalt is cracking and slumping down the slope (see photos). Concrete barriers have been installed in this area as it is a steep slope with a dangerous drop (see photos). After discussing this with our engineers, they also suggested evaluating the drop inlet and attached cross pipe as water from this pipe could be saturating the hillside and making matters worse. The driving surface of the road is eroding in many locations. The erosion is causing water to flow down the road and bypass designed drainage. Erosion |
2820065 | Primary Facility | 2018-12-28 | Routine/Complete Inspection | No Violations Noted | One well staged for production. Containment liner(felt and polyurethane) surrounds well head and pad. One GPU with no containment. No leaks from production equipment. |
For data sources see[4]