X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-031-24787"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-031-24787
 
| Well ID: 37-031-24787
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.310008, -79.598543 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.310008, -79.598543 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 04/21/2008
+
| Spud Date: 2008-04-21
 
|-
 
|-
| Permit Date: 11/2/2007
+
| Permit Date: 2007-11-02
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 86:
 
|-
 
|-
 
| 2007
 
| 2007
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 49.69
 
| style="text-align: right;" | 49.69
 
| style="text-align: right;" | 211
 
| style="text-align: right;" | 211
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 26.75
 
| style="text-align: right;" | 26.75
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 16.41
 
| style="text-align: right;" | 16.41
 
| style="text-align: right;" | 61
 
| style="text-align: right;" | 61
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 30.17
 
| style="text-align: right;" | 30.17
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 122
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 13.00
 
| style="text-align: right;" | 13.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 5.00
 
| style="text-align: right;" | 5.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 6.30
 
| style="text-align: right;" | 6.30
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 178: Line 203:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 183: Line 209:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 189: Line 216:
 
| PA0020346
 
| PA0020346
 
|-
 
|-
| 2010-0
+
| 2010
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 195: Line 223:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 201: Line 230:
 
| PA0028428
 
| PA0028428
 
|-
 
|-
| 2013-0
+
| 2013
 +
| [[DANNIC ENERGY CORP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 226: Line 256:
 
| 1702029
 
| 1702029
 
| Primary Facility
 
| Primary Facility
| 04/24/2008
+
| 2008-04-24
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 233: Line 263:
 
| 1705487
 
| 1705487
 
| Primary Facility
 
| Primary Facility
| 05/09/2008
+
| 2008-05-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 240: Line 270:
 
| 1758737
 
| 1758737
 
| Primary Facility
 
| Primary Facility
| 12/11/2008
+
| 2008-12-11
 
| Site Restoration
 
| Site Restoration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 247: Line 277:
 
| 1758856
 
| 1758856
 
| Primary Facility
 
| Primary Facility
| 12/15/2008
+
| 2008-12-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 254: Line 284:
 
| 1771624
 
| 1771624
 
| Primary Facility
 
| Primary Facility
| 02/24/2009
+
| 2009-02-24
 
| Site Restoration
 
| Site Restoration
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 261: Line 291:
 
| 1795346
 
| 1795346
 
| Primary Facility
 
| Primary Facility
| 04/29/2009
+
| 2009-04-29
 
| Site Restoration
 
| Site Restoration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 268: Line 298:
 
| 1818659
 
| 1818659
 
| Primary Facility
 
| Primary Facility
| 07/29/2009
+
| 2009-07-29
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 275: Line 305:
 
| 1904485
 
| 1904485
 
| Primary Facility
 
| Primary Facility
| 08/04/2010
+
| 2010-08-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 282: Line 312:
 
| 2100318
 
| 2100318
 
| Primary Facility
 
| Primary Facility
| 09/10/2012
+
| 2012-09-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 308: Line 338:
 
| 538743
 
| 538743
 
| 05/09/2008
 
| 05/09/2008
| 04/29/2009
+
| 2008-05-09
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 316: Line 346:
 
| 538744
 
| 538744
 
| 05/09/2008
 
| 05/09/2008
| 04/29/2009
+
| 2008-05-09
 
| 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling
 
| 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling
 
| Administrative
 
| Administrative
Line 324: Line 354:
 
| 553367
 
| 553367
 
| 12/11/2008
 
| 12/11/2008
| 04/29/2009
+
| 2008-12-11
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| Administrative
 
| Administrative
Line 332: Line 362:
 
| 553368
 
| 553368
 
| 12/11/2008
 
| 12/11/2008
| 04/29/2009
+
| 2008-12-11
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 340: Line 370:
 
| 553369
 
| 553369
 
| 12/11/2008
 
| 12/11/2008
| 04/29/2009
+
| 2008-12-11
 
| 78.64 - Inadequate containment of oil tank
 
| 78.64 - Inadequate containment of oil tank
 
| Administrative
 
| Administrative
Line 348: Line 378:
 
| 553398
 
| 553398
 
| 12/15/2008
 
| 12/15/2008
| 06/26/2013
+
| 2008-12-15
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 356: Line 386:
 
| 553399
 
| 553399
 
| 12/15/2008
 
| 12/15/2008
| 06/26/2013
+
| 2008-12-15
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| Administrative
 
| Administrative
Line 364: Line 394:
 
| 562008
 
| 562008
 
| 04/29/2009
 
| 04/29/2009
| 07/29/2009
+
| 2009-04-29
 
| 102.4INADPLN - E&S Plan not adequate
 
| 102.4INADPLN - E&S Plan not adequate
 
| Administrative
 
| Administrative
Line 386: Line 416:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/29/2009
+
| 2009-04-29
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 395: Line 425:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/29/2009
+
| 2009-04-29
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 404: Line 434:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/08/2009
+
| 2009-05-08
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 413: Line 443:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/08/2009
+
| 2009-05-08
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 422: Line 452:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/08/2009
+
| 2009-05-08
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 431: Line 461:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/26/2009
+
| 2009-08-26
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 442: Line 472:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 18:48, 21 August 2019

Well Details

Well ID: 37-031-24787
Loading map...
Country: United States
State: Pennsylvania
County: Clarion
Municipality: Ashland Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: MASTERS 1
License Status: Active
Spud Date: 2008-04-21
Permit Date: 2007-11-02
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.310008
Longitude: -79.598543

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2008 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 0.00 0 49.69 211 0.00 0
2013 DANNIC ENERGY CORP 0.00 0 26.75 214 0.00 0
2014 DANNIC ENERGY CORP 0.00 0 16.41 61 0.00 0
2015 DANNIC ENERGY CORP 0.00 0 30.17 122 0.00 0
2016 DANNIC ENERGY CORP 0.00 0 13.00 366 0.00 0
2017 DANNIC ENERGY CORP 0.00 0 5.00 365 0.00 0
2018 DANNIC ENERGY CORP 0.00 0 6.30 365 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 DANNIC ENERGY CORP Produced Fluid (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 DANNIC ENERGY CORP Produced Fluid (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2011 DANNIC ENERGY CORP Produced Fluid (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2013 DANNIC ENERGY CORP Produced Fluid (in Barrels) 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1702029 Primary Facility 2008-04-24 Drilling/Alteration No Violations Noted
1705487 Primary Facility 2008-05-09 Routine/Complete Inspection Violation(s) Noted
1758737 Primary Facility 2008-12-11 Site Restoration Violation(s) Noted
1758856 Primary Facility 2008-12-15 Routine/Complete Inspection Violation(s) Noted
1771624 Primary Facility 2009-02-24 Site Restoration Outstanding Violations - No Viols Req'd
1795346 Primary Facility 2009-04-29 Site Restoration Violation(s) Noted
1818659 Primary Facility 2009-07-29 Site Restoration No Violations Noted
1904485 Primary Facility 2010-08-04 Routine/Complete Inspection No Violations Noted
2100318 Primary Facility 2012-09-10 Routine/Complete Inspection No Violations Noted
2626382 Primary Facility 2017-08-17 Routine/Partial Inspection No Violations Noted Well is equipped for production. Pipelines connected to tubing and surface casing. Both pipelines have check valves installed at the wellsite. Appears to have some minor fluid that leaked from the stuffing box. No pump jack installed at well.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1705487 538743 05/09/2008 2008-05-09 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1705487 538744 05/09/2008 2008-05-09 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling Administrative
1758737 553367 12/11/2008 2008-12-11 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative
1758737 553368 12/11/2008 2008-12-11 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1758737 553369 12/11/2008 2008-12-11 78.64 - Inadequate containment of oil tank Administrative
1758856 553398 12/15/2008 2008-12-15 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1758856 553399 12/15/2008 2008-12-15 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative
1795346 562008 04/29/2009 2009-04-29 102.4INADPLN - E&S Plan not adequate Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
538743 233812 NOV - Notice of Violation Comply/Closed 2009-04-29
538744 233812 NOV - Notice of Violation Comply/Closed 2009-04-29
553367 241733 NOV - Notice of Violation Comply/Closed 2009-05-08
553368 241733 NOV - Notice of Violation Comply/Closed 2009-05-08
553369 241733 NOV - Notice of Violation Comply/Closed 2009-05-08
562008 246575 NOV - Notice of Violation Comply/Closed 2009-08-26

For data sources see[6]

References