X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-21748"

m
m
Line 104: Line 104:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 109: Line 110:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-M11
+
| 2018
 +
| [[INFLECTION ENERGY (PA) LLC]]
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
| style="text-align: right;" | 41.01 Tons
+
| style="text-align: right;" | 247.82 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100955
 
| 100955
 
|-
 
|-
| 2018-M11
+
| 2018
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 140.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[INFLECTION ENERGY (PA) LLC]]
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 0.38 Tons
 
| style="text-align: right;" | 0.38 Tons
Line 121: Line 131:
 
| 100955
 
| 100955
 
|-
 
|-
| 2018-M12
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align: right;" | 206.81 Tons
 
| LANDFILL
 
| 100955
 
|-
 
| 2018-M12
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 140.00 Bbl
+
| style="text-align: right;" | 66.25 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-M01
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align: right;" | 439.76 Tons
+
| Drilling Fluid Waste (in Barrels) RWC 803
| LANDFILL
+
| style="text-align: right;" | 1,685.83 Bbl
| 100955
+
| REUSE (AT WELL PAD)
 +
|  
 
|-
 
|-
| 2019-M02
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align: right;" | 549.45 Tons
 
| LANDFILL
 
| 100955
 
|-
 
| 2019-M02
 
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 4,357.50 Bbl
 
| style="text-align: right;" | 4,357.50 Bbl
Line 151: Line 152:
 
| WMGR123NW011
 
| WMGR123NW011
 
|-
 
|-
| 2019-M02
+
| 2019
| Drilling Fluid Waste (in Barrels) RWC 803
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align: right;" | 622.50 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M03
 
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
| style="text-align: right;" | 84.89 Tons
+
| style="text-align: right;" | 1,074.10 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100955
 
| 100955
|-
 
| 2019-M03
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 1,063.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M03
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 66.25 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
 
|-
 
|-
 
|}
 
|}

Revision as of 19:09, 21 August 2019

Well Details

Well ID: 37-081-21748
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Gamble Township
Operator Name: INFLECTION ENERGY (PA) LLC
Well Pad ID: 149762
Farm/Lease Name: STUNNER SMITH 11H
License Status: Active
Spud Date: 2018-11-04
Permit Date: 2018-08-17
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.346369
Longitude: -76.9590

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 INFLECTION ENERGY (PA) LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 INFLECTION ENERGY (PA) LLC Drill Cuttings (in Tons) RWC 810 247.82 Tons LANDFILL 100955
2018 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes (in Barrels) RWC 899 140.00 Bbl REUSE (AT WELL PAD)
2018 INFLECTION ENERGY (PA) LLC Synthetic Liner Materials (in Tons) RWC 806 0.38 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes (in Barrels) RWC 899 66.25 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Drilling Fluid Waste (in Barrels) RWC 803 1,685.83 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Drilling Fluid Waste (in Barrels) RWC 803 4,357.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 INFLECTION ENERGY (PA) LLC Drill Cuttings (in Tons) RWC 810 1,074.10 Tons LANDFILL 100955

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2817869 Primary Facility 2018-12-17 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. Met with Inflection representative Ross Drnjevich on location. Well was a spud conductor. Conductor casing had a steel plate covering it at time of inspection. Cellar was empty and clean. No violations were noted at time of inspection.
2818943 Primary Facility 2018-12-26 Routine/Complete Inspection No Violations Noted A H&P rig is drilling on the Smith Well pad. The Department representative did not locate the rig manager so Department could not determine which well was being drilled.

The site had a primary containment overlaid with wood plank rig matting with beveled edges (see photo). All materials held on containment and within secondary containment. The overall site conditions were clean and well organized. No leaks or spills detected. No violations.

2822744 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted Weather was 38° and cloudy at time of inspection. Met with Inflection representatives Jamie Czerneski and Greg Malekos on location. Well was covered with a steel plate at time of inspection. This well recently had the surface 18 5/8" casing cemented after the rig skidded back to the 10H to begin drilling the first intermediate. Reviewed the job log from the cement job and no discrepancies were noted at time of inspection. Rig will move back to drill subsequent strings. No violations were noted at time of inspection.
2827926 Primary Facility 2019-01-15 Routine/Complete Inspection No Violations Noted Weather was 25° and cloudy at time of inspection. Met with Inflection representatives Ross Drjnevitch and Greg Malekos on location. Halliburton was on location rigging up to cement the 13 3/8" intermediate casing. No violations were noted at time of inspection.
2835463 Primary Facility 2019-02-05 Routine/Complete Inspection No Violations Noted Weather was 37° and sunny at time of inspection. Met with Inflection representatives Greg Malekos on location. Well recently had the first intermediate string of 13 3/8" casing drilled and cemented. Well was closed in at time of inspection with a nightcap. Water in the cellar was frozen solid at time of inspection. No violations were noted at time of inspection.
2840031 Primary Facility 2019-02-13 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. Met with Inflection representative Jamie Czerneski on location. This well was shut in with a night cat at time of inspection. 0% combustible gas was detected in the cellar at time of inspection. Well is being batch drilled with 5 other wells on location. No violations were noted at time of inspection.
2840560 Primary Facility 2019-02-14 Routine/Complete Inspection No Violations Noted I met Ross Drnjevich of Inflection on the site. H&P 521 on location, drilling the 2HN well at 8300'. The chemical containment appeared to be in good condition, but also contained several inches of snow and ice. The secondary containment for the mud tanks had been bolted on with wood strips on the inside of the containment in the back, approximately 4-5" down from the top. Although it is unlikely that this brought the containment volume below 110% of the volume of the tanks, I still recommended to Ross that these liners be attached on the outside of the berms. Meltwater had built up to 3-4" deep on the backside of the pad, and Ross told me he would have it vacced.
2842015 Primary Facility 2019-02-20 Routine/Complete Inspection No Violations Noted Weather- 21 degrees and cloudy at time of inspection

Met with Inflection representative Ross Drjnevitch and Greg Malekos on location. Well was closed in with a nightcap at time of inspection. Wells on pad are being batch drilled. No violations noted at time of inspection.

2844545 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted Weather was 24 degrees and sunny at time of inspection. Met with Inflection representative Ross Drjnevitch on location. They are currently drilling their second intermediate to a depth of 8215'. They are estimating to TD Thursday morning and cement on Friday afternoon. No violations at time of inspection.
2849876 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted Weather was 12 degrees and sunny. Met with Inflection representative Jamie Czerneski and Greg Malekos on location. Well recently had its second intermediate casing drilled and cemented. Reviewed cement job logs and no discrepancies were noted at time of inspection. Well was shut in with a night cap. Well will be completed at a later date. No violations noted at time of inspection.
2852780 Primary Facility 2019-03-13 Routine/Complete Inspection No Violations Noted Weather was 30 degrees and sunny. Met with Inflection representative Ross Djnevich on location. Well recently had its second intermediate casing drilled and cemented. Reviewed cement job logs and no discrepancies were noted at time of inspection. Well was shut in with a night cap. Well will be completed at a later date. No violations noted at time of inspection.

For data sources see[6]

References