X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-083-24397"

m
m
Line 11: Line 11:
 
| County: [[Knox_County,_Ohio|Knox]]
 
| County: [[Knox_County,_Ohio|Knox]]
 
|-
 
|-
| Municipality: [[Pleasant Township,_Knox_County,_Ohio|Pleasant Township]]
+
| Municipality: [[Pleasant_Township,_Knox_County,_Ohio|Pleasant Township]]
 
|-
 
|-
 
| Operator Name: [[MASON DRILLING INC]]
 
| Operator Name: [[MASON DRILLING INC]]

Revision as of 18:27, 28 August 2019

Well Details

Well ID: 34-083-24397
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Pleasant Township
Operator Name: MASON DRILLING INC
Well Pad ID:
Farm/Lease Name: VERNON
License Status: Producing
License Date: 2008-08-04
Spud Date: 2008-10-10
Spud Drilling Contractor: H & D DRILLING
Final Drill Date: 2008-10-19
Well Total Depth: 2563 ft
Configuration: Vertical
Latitude: 40.356703963
Longitude: -82.44734698

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-08-04 Proposed Formations:CLINTON, Issued Date:8/4/2008, Expired Date:8/4/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-10-19
Completion Report Received 2008-12-22
Construction Permit Expires 2009-08-04
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-02-13 2472 2488 30

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 48100 Gal 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 MASON DRILLING INC 0 0 0
2009 MASON DRILLING INC 5682 0 350
2010 MASON DRILLING INC 4406 0 365
2011 MASON DRILLING INC 3073 0 365
2012 MASON DRILLING INC 2836 0 366
2013 MASON DRILLING INC 2743 0 365
2014 MASON DRILLING INC 2672 0 365
2015 MASON DRILLING INC 2156 0 365
2016 MASON DRILLING INC 1915 0 365
2017 MASON DRILLING INC 1627 0 365
2018 MASON DRILLING INC 1520 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 MASON DRILLING INC Brine 0 0
2009 MASON DRILLING INC Brine 241 350
2010 MASON DRILLING INC Brine 0 365
2011 MASON DRILLING INC Brine 70 365
2012 MASON DRILLING INC Brine 30 366
2013 MASON DRILLING INC Brine 20 365
2014 MASON DRILLING INC Brine 0 365
2015 MASON DRILLING INC Brine 0 365
2016 MASON DRILLING INC Brine 0 365
2017 MASON DRILLING INC Brine 0 365
2018 MASON DRILLING INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0200972183 2013-07-12 Preliminary Restoration No Violations Well is capable of production. Well is equipt with a motor and a pumping unit. All drilling equiptment has been removed and the pits have been filled in. Vegetation has been restored. The tanke battery consists of one 100 barrell tank within an earthen dike. Restoration passes.
1224077696 2008-10-15 Drill / Deepen / Reopen No Violations Witnessed cementing of surface casing. Spoke with Harold Donnaker on site. Pits are in and lined.

For data sources see[9]

References