X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-119-25573"

m
m
Line 11: Line 11:
 
| County: [[Muskingum_County,_Ohio|Muskingum]]
 
| County: [[Muskingum_County,_Ohio|Muskingum]]
 
|-
 
|-
| Municipality: [[Newton Township,_Muskingum_County,_Ohio|Newton Township]]
+
| Municipality: [[Newton_Township,_Muskingum_County,_Ohio|Newton Township]]
 
|-
 
|-
 
| Operator Name: [[PORTER PETROLEUM]]
 
| Operator Name: [[PORTER PETROLEUM]]

Revision as of 21:14, 28 August 2019

Well Details

Well ID: 34-119-25573
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Newton Township
Operator Name: PORTER PETROLEUM
Well Pad ID:
Farm/Lease Name: RITTBERGER LILLIE
License Status: Producing
License Date: 1980-12-24
Spud Date: 1981-08-11
Spud Drilling Contractor:
Final Drill Date: 1981-10-08
Well Total Depth: 3431 ft
Configuration: Vertical
Latitude: 39.845739702
Longitude: -82.13834197

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1980-12-24 1278 CLYMAR, INC GeoDate 12/24/80
Oil and Gas 1980-12-24 Issued Date 12/24/80 Expired Date Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
Original Spud 1981-08-11
Completed 1981-10-08
Reached Total Depth 1981-10-08
Completion Report Received 1981-11-18
CO 1996-09-17 5512 NEWSTAR ENERGY USA INC GeoDate 12/24/80
Change of Owner 1999-10-12 Operator changed from 5512, NEWSTAR ENERGY USA INC to 5658, PORTER PETROLEUM
Record Last Modified 2013-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3383 3421 18

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1600 Bbl 100000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1986 FORAKER CLYDE M & ASSOC 1990 779 365
1987 FORAKER CLYDE M & ASSOC 2297 861 365
1988 FORAKER CLYDE M & ASSOC 863 241 365
1989 CLYMAR, INC 272 163 365
1990 FORAKER CLYDE M & ASSOC 0 478 365
1991 CLYMAR, INC 0 157 365
1992 CLYMAR, INC 0 314 365
1993 CLYMAR, INC 0 160 365
1994 CLYMAR, INC 0 157 365
1995 CLYMAR, INC 0 82 365
1996 NEWSTAR ENERGY USA INC 0 243 365
1997 NEWSTAR ENERGY USA INC 0 234 365
2001 PORTER PETROLEUM 0 205 365
2002 PORTER PETROLEUM 0 162 365
2003 PORTER PETROLEUM 0 110 365
2004 PORTER PETROLEUM 0 156 365
2005 PORTER PETROLEUM 0 164 365
2006 PORTER PETROLEUM 0 154 365
2007 PORTER PETROLEUM 0 132 365
2008 PORTER PETROLEUM 0 126 365
2009 PORTER PETROLEUM 0 124 365
2010 PORTER PETROLEUM 0 76 365
2011 PORTER PETROLEUM 0 78 365
2012 PORTER PETROLEUM 0 64 366
2013 PORTER PETROLEUM 0 62 365
2014 PORTER PETROLEUM 0 67 365
2015 PORTER PETROLEUM 0 34 365
2016 PORTER PETROLEUM 0 37 365
2017 PORTER PETROLEUM 0 19 365
2018 PORTER PETROLEUM 0 87 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1986 FORAKER CLYDE M & ASSOC Brine 173 365
1987 FORAKER CLYDE M & ASSOC Brine 150 365
1988 FORAKER CLYDE M & ASSOC Brine 10 365
1989 CLYMAR, INC Brine 0 365
1990 FORAKER CLYDE M & ASSOC Brine 80 365
1991 CLYMAR, INC Brine 80 365
1992 CLYMAR, INC Brine 70 365
1993 CLYMAR, INC Brine 70 365
1994 CLYMAR, INC Brine 55 365
1995 CLYMAR, INC Brine 20 365
1996 NEWSTAR ENERGY USA INC Brine 20 365
1997 NEWSTAR ENERGY USA INC Brine 45 365
2001 PORTER PETROLEUM Brine 5 365
2002 PORTER PETROLEUM Brine 0 365
2003 PORTER PETROLEUM Brine 0 365
2004 PORTER PETROLEUM Brine 0 365
2005 PORTER PETROLEUM Brine 0 365
2006 PORTER PETROLEUM Brine 0 365
2007 PORTER PETROLEUM Brine 0 365
2008 PORTER PETROLEUM Brine 0 365
2009 PORTER PETROLEUM Brine 0 365
2010 PORTER PETROLEUM Brine 0 365
2011 PORTER PETROLEUM Brine 0 365
2012 PORTER PETROLEUM Brine 0 366
2013 PORTER PETROLEUM Brine 0 365
2014 PORTER PETROLEUM Brine 0 365
2015 PORTER PETROLEUM Brine 0 365
2016 PORTER PETROLEUM Brine 0 365
2017 PORTER PETROLEUM Brine 0 365
2018 PORTER PETROLEUM Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0196775824 2015-10-05 Production Wells No Violations Darrel Porter and Contractor Andy Browning took equipment in to the tank site to rebuild the dike. They were going to remove the plastic tank that was half full of sludge. Darrel claims that he called Mike Corp and there was no answer. They would come back to remove the tank after Corp cleans the tank out. They were headed to Licking county.
0456240756 2004-10-18 Production Wells No Violations Tanks?
0610328346 2008-11-26 Production Wells No Violations Producing. No problems noted. Tanks?
0670397157 2014-10-10 Administrative Inspection No Violations Daryle Porter called and said that Ted Denardo of the Shelly company thinks that there is a stone pillar under the tank. Darlye Porter of Porter Petroluem will have a wait and see approach. Porter will leave the tank where it is. He will keep the tank at a minimal level. The Shelly Company will reinforce the subsidence with bolts and a plate.
0932380067 2014-10-01 Production Wells No Violations The New Philly office called on a well that had a tank battery that was close to the subsidence on a mine at the west end of the Chesterhill gravel quarry. Producing well with a pumping unit and the rod and tubing annulus are both open. The tank I could not find. I will stop by the mine office in the morning.
1316423592 2014-10-02 Production Wells No Violations I stopped by the Shelly office and met withTed Denardo the Under ground mine manager. He and I went up to the tank battery for the well. There is a centerline of subsidence marker at coordinate 39.84511,-82.13988. The second marker is at 39.84497,-82.13974. The tank battery is at 40 away. I set down with the company and the decision was made to relocate the oil tank and equipment.

For data sources see[9]

References