If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Monroe_County,_Ohio|Monroe]] | | County: [[Monroe_County,_Ohio|Monroe]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Center_Township,_Monroe_County,_Ohio|Center Township]] |
|- | |- | ||
| Operator Name: [[GULFPORT ENERGY CORPORATION]] | | Operator Name: [[GULFPORT ENERGY CORPORATION]] |
Well ID: 34-111-24737 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.781288261,"lon":-81.09086688,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Center Township | |
Operator Name: GULFPORT ENERGY CORPORATION | |
Well Pad ID: US-OH-001471 | |
Farm/Lease Name: SCHUMACHER 210617 | |
License Status: Well Drilled | |
License Date: 2017-06-07 | |
Spud Date: 2017-05-17 | |
Spud Drilling Contractor: PI0NEER DRLG | |
Final Drill Date: 2017-08-27 | |
Well Total Depth: 17000 ft | |
Configuration: Horizontal | |
Latitude: 39.781288261 | |
Longitude: -81.09086688 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-04-27 | Proposed Formations:TRENTON, Issued Date:4/27/2017, Expired Date:4/27/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-06-07 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/7/2017, Expired Date:6/7/2019 12:00:00 PM, Drilling unit acres:511.134, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2017-08-27 | STATUS PER OPERATOR TELEPHONE CONVERSATION ALE 03/12/2018 |
Correction to Well | 2018-08-24 | TAKE TARGET AS-DRILLED |
Record Last Modified | 2019-04-15 | STATUS PER OPERATOR TELEPHONE CONVERSATION ALE 03/12/2018 |
Construction Permit Expires | 2019-06-07 | STATUS PER OPERATOR TELEPHONE CONVERSATION ALE 03/12/2018 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0239882308 | 2019-03-07 | Drill / Deepen / Reopen | No Violations | On this day, I am accompanied by ODNR Southeast Supervisor Brent Bear to conduct a follow-up inspection in regard to annular pressures. The current pressure reading on the 9.625 inch diameter casing is 1,400 pounds per square inch, and the pressure on the 13.375 inch diameter surface casing is 0 psi. |
0330007150 | 2019-03-06 | Drill / Deepen / Reopen | No Violations | On this day, I found the pad gated with signage at the entrance. There are (6) wells on the pad that have been drilled, but not completed. Steel fencing surrounds the perimeter of the wellheads. Each well has annular pressure monitoring devices equipped. Also noted, each well has signage stating that a back pressure valve (BPV) is installed. The 9.625 inch diameter intermediate casing has a pressure of 1,400 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. I contacted Gulfport Energy Production Superintendent Justin Hoague to inform him of the pressures. Gulfport Representative Josh Starcher arrived onsite, and he made contact with additional Gulfport personnel. Pro-flow will be onsite within the next 48 hours to bleed the pressure down into a gas-buster tank. I informed Mr. Starcher to inform me of any updates. He also noted that the wells were recently equipped with pressure gauges. It was indicated that the wells may be completed in 2020. |
0439559514 | 2019-03-08 | Drill / Deepen / Reopen | No Violations | I am onsite to witness Pro-Flow bleed down the pressure of the 9.625 inch diameter intermediate casing. They are currently connecting the iron to the gas buster and will pressure test the lines prior to flowing into the tank. I spoke with Gulfport Representative Josh Starcher onsite and informed him to monitor the pressures, and update ODNR with the new pressures after 24 hours. |
0460951866 | 2017-05-18 | Casing String Witnessed | No Violations | On site inspection to witness the conductor casing cement job with Rocky Mountain Drillings top hole rig and Stingray Cement Service. Rock Mountain has drilled a 32 diameter borehole to 110 from ground level and ran 26 diameter .375 wall weld connection casing. Stingray cemented the casing using a 61 barrel cement mix consisting of 280 sacks of class A cement with 40% open hole cement excess ran. The cement weight was verified by weight of scale and displaced to 100 with 62 barrels of fresh water. 15 barrels of 6% gel spacer was pumped ahead of the cement.42 barrels of cement returns were witnessed to surface. |
1900082606 | 2017-11-01 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction has vegetation established and erosion control in place. The lease road and well pad is of stone construction with the well pad entrance gated. Signage is present at the lease road entrance off of State Route 26. There are 6 wells on the pad that has been drilled but not completed. No production equipment has been placed on the well pad at the time of my inspection. |
1902522118 | 2019-03-11 | Drill / Deepen / Reopen | No Violations | On this day, I am conducting a follow-up inspection to report the annular pressures. The 9.625 inch diameter intermediate casing is currently at 0 pounds per square inch, and 13.375 inch diameter surface casing is at 0 psi. I spoke with Gulfport Representative Josh Starcher on 3/9/19 and 3/10/19. Pro-Flow was onsite for those days and had flowlines connected from the wellhead to a gas buster tank. The 9.625 inch diameter intermediate casing was blown down to 0 psi from 1,500 psi on 3/08/19, returning 4 barrels of fluid. The pressure recovered to 300 psi on 3/9/19, and blown down to 0 psi, returning 2 barrels of fluid. The pressure stabilized at 0 psi on 3/10/19. |
For data sources see[3]