Difference between revisions of "34-111-24797"

m
m
Line 11: Line 11:
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
|-
 
|-
| Municipality: [[Adams Township,_Monroe_County,_Ohio|Adams Township]]
+
| Municipality: [[Adams_Township,_Monroe_County,_Ohio|Adams Township]]
 
|-
 
|-
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
Line 235: Line 235:
 
| style="text-align: right;" | 836
 
| style="text-align: right;" | 836
 
|-
 
|-
| Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-, branched
+
| Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
 +
branched
 
| 127087-87-0
 
| 127087-87-0
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 5

Revision as of 12:18, 29 August 2019

Well Details

Well ID: 34-111-24797
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Adams Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001512
Farm/Lease Name: WILEY D
License Status: Producing
License Date: 2017-10-24
Spud Date: 2018-02-26
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-04-02
Well Total Depth: 30130 ft
Configuration: Horizontal
Latitude: 39.745557995
Longitude: -80.98963951

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-10-24 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/24/2017, Expired Date:10/24/2019 12:00:00 PM, Drilling unit acres:327.64, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2018-03-09 CHANGE TO UNIT SIZE, TAKE-POINT AND TARGET INFORMATION.
Reached Total Depth 2018-04-02
Correction to Well 2018-05-11 updated take point and target on as drilled plat. TE
Completion Report Received 2018-10-31
Record Last Modified 2018-11-02
Construction Permit Expires 2019-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-11-01 10626 10792 0
2018-11-01 29860 29958 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/25/2018 07/07/2018 10452 37,849,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
Crystalline silica, quartz 14808-60-7 100 11.2184 40,109,600.0
Hydrochloric acid 7647-01-0 15 0.032272 115383
Sodium Hydroxide 1310-73-2 4 0.000960882 3436
Crystalline silica, cristobalite 14464-46-1 30 0.0759202 271440
Ammonium Persulfate 7727-54-0 95 0.00138382 4948
Propargyl alcohol 107-19-7 10 0.00003896 140
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000118784 425
Silica, amorphous - fumed 7631-86-9 30 0.0759202 271440
Oxyalkylated phenolic resin Proprietary 30 0.000158379 567
Distillates (petroleum, hydrotreated light) 64742-47-8 18 0.012655 45246
Ammonium Chloride 12125-02-9 1.5 0.000958299 3427
Methanol 67-56-1 60 0.000233782 836
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00001980 71
Citric acid 77-92-9 60 0.00162953 5827
Fatty acids, tall oil Proprietary 30 0.000116891 418
Naphthalene 91-20-3 5 0.00001980 71
Mullite 1302-93-8 100 0.253067 904800
Ethoxylated alcohols Proprietary 30 0.000116891 418
Aluminum Silicate 1302-76-7 100 0.253067 904800
1,2,4 Trimethylbenzene 95-63-6 1 0.00000396 15
Modified thiourea polymer Proprietary 30 0.000116891 418
Organic phosphate copolymer 71050-62-9 25 0.00345448 12351
Ethanol 64-17-5 60 0.000237568 850
Olefins Proprietary 5 0.00004676 168
Poly(oxy-1, 2-ethanediyl), a-tridecyl-w-hydroxy,branched 69011-36-5 20 0.00462151 16524
Dazomet 533-74-4 24 0.00576529 20613
HP-2816 OneAqua Friction Reducer Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
HP-2220 OneAqua Scale Inhibitor Listed Below Listed Below 0 0 0
HP-9601 OneAqua Additive Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.216776 775048
MB-7530 OneAqua Biocide Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 88.1836 315,285,000.0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
HP-2814 OneAqua Friction Reducer Listed Below Listed Below 0 0 0
PROP-CERAMIC-30/50, BULK (101297495) Halliburton Proppant Listed Below Listed Below 0 0 0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-07 H2O 15 373048 Gal 444245 Halliburton STAGE 93/93

STAGES 2-92 SEE IMAGES

2018-05-25 H2O 15 424659 Gal 445530 Halliburton STAGE 1/93

STAGES 2-92 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP 4766729 0 122
2019 ECLIPSE RESOURCES I LP 2184620 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP Brine 117941 122
2019 ECLIPSE RESOURCES I LP Brine 34798 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0255281240 2018-11-28 Production Wells No Violations Status check inspection found 4 wells are present on the pad and all 4 wells are now in production. The said well is equipped with a lower A and upper B section with annular pressure monitoring in place on both well head sections. No annular pressure was found on this day on the A or B well head section. The well is producing off the 5.5 diameter production casing through (2) 3.5 diameter flow lines with both flow line valves open. The 5.5 casing pressure is 2,343 pounds per square inch (psi) and the flow line pressures are 1,400 psi and 1,200 psi. There is one manual master 7.0625 completion valve still on the well head B section that the well is being produced through. Each of the (2) flow lines has a separate glycol heater and downstream from the Glycol heater is a contact tower and B-Tex Condenser followed by third party mid stream Eureka Hunter pipeline station point. Also on location is a production fluid facility that consists of (6) 400 barrel production tanks situated inside a polymer lined steel containment dike area. Proper well identification is posted and hazard warning labeling is present at the production facility. Signage is posted at the well pad entry point and the well pad perimeter is protected by an earthen berm.
0620822084 2018-07-30 Completion Testing No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. We are onsite witnessing Halliburton, 9 Energy, and S3 Pump Service conducting hydraulic fracturing operations. This particular well was completed with 93 total stages.
1520353073 2018-03-06 Drill / Deepen / Reopen No Violations
1532967827 2018-07-30 Completion Testing No Violations Status check inspection found the well drilling and completion process complete. Halliburton Pressure pumping service is on location and has stimulated 93 stages total with an initial shut in pressure of 6,400 pounds per square inch pressure. The 9.625 x 5.5 annular pressure is being monitored and is currently 22 psi.
1534436267 2018-08-16 Completion Testing No Violations Status check inspection on the well completion process found the well drilling and stimulation process complete. The well was stimulated in 95 stages with the last plug # 94 set at 29,000. The 5.5 diameter production casing was set to a depth of 30,098. The well head assembly consists of a lower A and upper B section with a production flow cross present followed by two 7.0625 diameter FMC manually operated master valves. The annular pressures are being monitored daily. A completion rig owned by Deep Well Service and identified as Snub unit # 10 is rigged up on Yellow Rose A 2 H drilling out the completion plugs maintaining well control using 10 pound per gallon brine. There are a total of 4 wells on the pad and the snubbing unit is drilling out the 1st one. No production tubing is scheduled to be set in the well.
1751423329 2018-05-17 Completion Testing No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report.
1762551719 2018-05-17 Completion Testing No Violations Status check inspection found the well drilling process is complete and the well has the completion well head installed and has also had the 5.5 production string toe prep procedure and final pressure test conducted. The well is awaiting the start of the stimulation process in the next 10 days, Halliburton completion service will mobilize and begin. All completion equipment will be placed on polymer containment. All surface water created on the well pad due to the recent rain events is being removed by the means a vacuum truck. The perimeter drain valves are closed.