X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-005-24200"

m
m
Line 11: Line 11:
 
| County: [[Ashland_County,_Ohio|Ashland]]
 
| County: [[Ashland_County,_Ohio|Ashland]]
 
|-
 
|-
| Municipality: [[Mifflin Township,_Ashland_County,_Ohio|Mifflin Township]]
+
| Municipality: [[Mifflin_Township,_Ashland_County,_Ohio|Mifflin Township]]
 
|-
 
|-
 
| Operator Name: [[COLUMBIA GAS TRANSMISSION LLC]]
 
| Operator Name: [[COLUMBIA GAS TRANSMISSION LLC]]

Revision as of 04:00, 30 August 2019

Well Details

Well ID: 34-005-24200
Loading map...
Country: United States
State: Ohio
County: Ashland
Municipality: Mifflin Township
Operator Name: COLUMBIA GAS TRANSMISSION LLC
Well Pad ID:
Farm/Lease Name: HOWARD SEISS #2
License Status: Storage Well
License Date: 2018-05-03
Spud Date: 2018-05-14
Spud Drilling Contractor: H A D INC
Final Drill Date: 2018-08-02
Well Total Depth: 4950 ft
Configuration: Horizontal
Latitude: 40.804418604
Longitude: -82.35767653

For data sources see[1]

Well History

Well Status Well Status Date Comment
Completion Report Received 2018-01-30
APP 2018-05-03 Proposed Formations:CLINTON SANDSTONE, Issued Date:5/3/2018, Expired Date:5/2/2020 12:00:00 PM, Drilling unit acres:86, Proposed Well Type:SO, Proposed Well Class:POOL
Correction to Well 2018-05-11 CORRECTION TO CASING PLAN
Reached Total Depth 2018-08-02
Record Last Modified 2019-02-01
Correction to Well 2019-02-08 UPDATE TAKE/TARGET PER AS-DRILLED PLAT
Construction Permit Expires 2020-05-02

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
Other Treatment Type 0 0 0 COIL TUBING/ACIDIZING

SEE IMAGES

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0024617127 2019-02-28 Storage Well No Violations Performed annual inspection for Columbia Gas Storage Well #12602 on 02/28/2019. The well is equipped with a flanged wellhead with 1-master valve and 1-wing valve, and a drip. Well identification is clearly displayed. No problems were noted at the time of the inspection.
0119068020 2018-07-26 Drill / Deepen / Reopen No Violations HAD is drilling on saltwater mud at 3130 feet. Approximately 20 feet is left to drill and the operator plans to run production casing over the weekend of 7/28-7/29.
0675266760 2018-06-21 Casing String Witnessed No Violations The operator requested inspection to witness surface casing cement. The job was scheduled for 5 PM. On arrival, the rig had casing installed and a Halliburton pump truck was rigged up to a cement head on the surface casing. Cement bulk trucks were delayed in arriving until 7:20 PM. See the casing ticket for details.
0883077522 2018-05-11 Drill / Deepen / Reopen No Violations Rig mats have been placed on location. Contractors are setting up office trailers and mulching topsoil piles with straw. Excavating equipment and water tanks are on the pad. The operator plans to start drilling next week. No drilling equipment has arrived yet.
1029892777 2018-05-23 Drill / Deepen / Reopen No Violations Job trailers and earthmoving equipment are on location. There are Mac Oil water tanks on location. No personnel were on site during inspection. The drilling rig has not started to move in yet.
1526921426 2018-05-21 Drill / Deepen / Reopen No Violations The conductor casing has been installed in the well. No rig on location; no personnel on location. The operator did not set surface casing with the conductor rig.
1528819300 2018-06-12 Drill / Deepen / Reopen No Violations The drilling rig has not been moved in yet. No personnel are on location.
1545862825 2018-07-24 Drill / Deepen / Reopen No Violations The operator requested inspection to witness intermediate casing cement. Halliburton conducted the cement job. The well circulated and cement returned to surface.
1603910091 2018-06-06 Drill / Deepen / Reopen No Violations Workhorse excavating and Stallion Oilfied personnel are on location delivering tanks and support equipment in preparation for drilling.
1775661735 2018-05-29 Drill / Deepen / Reopen No Violations The drill rig has not started move in yet. No personnel were on location.
1804866690 2018-05-09 Drill / Deepen / Reopen No Violations Rick Conley of Columbia Gas requested a meeting to discuss drilling plans and the casing program. Rick is anticipating drilling rig arrival 5/14/18 and is planning to set surface casing with the top hole rig. The pad location has been excavated and leveled. A subcontractor installed liner and is installing rig mats. Construction should be completed by 5/11/18.
1929751751 2018-06-22 Drill / Deepen / Reopen No Violations HAD Drilling is rigging down and moving the rig off location. A different HAD rig will be moving in to complete the drilling.

For data sources see[4]

References