If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Monroe_County,_Ohio|Monroe]] | | County: [[Monroe_County,_Ohio|Monroe]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Franklin_Township,_Monroe_County,_Ohio|Franklin Township]] |
|- | |- | ||
| Operator Name: [[B & N COAL INC]] | | Operator Name: [[B & N COAL INC]] |
Well ID: 34-111-62178 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74424131,"lon":-81.2913948,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Franklin Township | |
Operator Name: B & N COAL INC | |
Well Pad ID: | |
Farm/Lease Name: BAKER OIL CO | |
License Status: Producing | |
License Date: | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: 1969-09-20 | |
Well Total Depth: 5003 ft | |
Configuration: Vertical | |
Latitude: 39.744241310 | |
Longitude: -81.29139480 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Plugged Back | 1969-04-19 | PLUUGED 7/05/35 TO 135 FEET AND THEN IT WAS REOPENED AND DEEPENED ON 9/20/1969. OWDD 11-2-67 |
Completed | 1969-09-20 | PLUUGED 7/05/35 TO 135 FEET AND THEN IT WAS REOPENED AND DEEPENED ON 9/20/1969. OWDD 11-2-67 |
Reached Total Depth | 1969-09-20 | PLUUGED 7/05/35 TO 135 FEET AND THEN IT WAS REOPENED AND DEEPENED ON 9/20/1969. OWDD 11-2-67 |
Record Last Modified | 2013-10-03 | PLUUGED 7/05/35 TO 135 FEET AND THEN IT WAS REOPENED AND DEEPENED ON 9/20/1969. OWDD 11-2-67 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 3500 Bbl | 55000 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | BAKER OIL CO | 0 | 0 | 0 |
1985 | BAKER OIL CO | 1793 | 0 | 0 |
1986 | BAKER OIL CO | 0 | 0 | 0 |
1994 | B & N COAL INC | 0 | 0 | 0 |
1995 | B & N COAL INC | 0 | 0 | 0 |
1996 | B & N COAL INC | 0 | 0 | 365 |
1997 | B & N COAL INC | 0 | 0 | 0 |
1998 | B & N COAL INC | 0 | 0 | 0 |
1999 | B & N COAL INC | 0 | 0 | 0 |
2000 | B & N COAL INC | 0 | 0 | 0 |
2001 | B & N COAL INC | 0 | 0 | 0 |
2002 | B & N COAL INC | 0 | 0 | 0 |
2003 | B & N COAL INC | 0 | 0 | 0 |
2004 | B & N COAL INC | 0 | 0 | 0 |
2005 | B & N COAL INC | 0 | 0 | 0 |
2006 | B & N COAL INC | 0 | 0 | 0 |
2007 | B & N COAL INC | 0 | 0 | 0 |
2008 | B & N COAL INC | 0 | 0 | 0 |
2009 | B & N COAL INC | 0 | 46 | 0 |
2010 | B & N COAL INC | 31 | 190 | 0 |
2011 | B & N COAL INC | 2 | 50 | 0 |
2012 | B & N COAL INC | 0 | 22 | 0 |
2013 | B & N COAL INC | 0 | 42 | 0 |
2014 | B & N COAL INC | 17 | 0 | 120 |
2015 | B & N COAL INC | 8 | 0 | 120 |
2016 | B & N COAL INC | 6 | 0 | 120 |
2017 | B & N COAL INC | 14 | 0 | 120 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | BAKER OIL CO | Brine | 0 | 0 |
1985 | BAKER OIL CO | Brine | 0 | 0 |
1986 | BAKER OIL CO | Brine | 0 | 0 |
1994 | B & N COAL INC | Brine | 0 | 0 |
1995 | B & N COAL INC | Brine | 0 | 0 |
1996 | B & N COAL INC | Brine | 0 | 365 |
1997 | B & N COAL INC | Brine | 0 | |
1998 | B & N COAL INC | Brine | 0 | 0 |
1999 | B & N COAL INC | Brine | 0 | 0 |
2000 | B & N COAL INC | Brine | 0 | |
2001 | B & N COAL INC | Brine | 0 | 0 |
2002 | B & N COAL INC | Brine | 0 | 0 |
2003 | B & N COAL INC | Brine | 0 | 0 |
2004 | B & N COAL INC | Brine | 0 | 0 |
2005 | B & N COAL INC | Brine | 0 | 0 |
2006 | B & N COAL INC | Brine | 0 | 0 |
2007 | B & N COAL INC | Brine | 0 | 0 |
2008 | B & N COAL INC | Brine | 0 | 0 |
2009 | B & N COAL INC | Brine | 120 | 0 |
2010 | B & N COAL INC | Brine | 120 | 0 |
2011 | B & N COAL INC | Brine | 120 | 0 |
2012 | B & N COAL INC | Brine | 120 | 0 |
2013 | B & N COAL INC | Brine | 120 | 0 |
2014 | B & N COAL INC | Brine | 0 | 120 |
2015 | B & N COAL INC | Brine | 0 | 120 |
2016 | B & N COAL INC | Brine | 0 | 120 |
2017 | B & N COAL INC | Brine | 0 | 120 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0005604i31 | 2002-01-16 | Production Wells | No Violations | |
1431444178 | 2015-05-12 | Production Wells | No Violations | Status check inspection per request of the divisions permitting section Geologist Steve Riley in regards to the well identification being misidentified and the company reporting the production under the well identified as 3411121233-0000. This error was identified and determined by reviewing the Columbus RBDMS database records and finding (2) well records for the same well. Mr. Riley cross referenced the 2nd well records with Geo survey records to the 2nd completion records to confirm the correct identification. This finding was supported by my field inspection on this day finding an existing well with the following present at the well head-7 surface casing -4.5 production casing & 2.375 production tubing with the well set up to sell gas off the tubing only with a 1 sales line hooked to the tubing and a pressure gauge showing 120 psi on the tubing. RBDMS records show a recompletion permit to deepen the well in 1969 to a depth of 5,003, the well original completion date was in 1935 with the equipment present found to support the well history. |
For data sources see[8]