X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-169-24106"

m
m
Line 9: Line 9:
 
| State: Ohio
 
| State: Ohio
 
|-
 
|-
| County: <County>
+
| County: [[Wayne_County,_Ohio|Wayne]]
 
|-
 
|-
| Municipality: [[Wooster City,_Wayne_County,_Ohio|Wooster City]]
+
| Municipality: [[Wooster,_Ohio|Wooster]]
 
|-
 
|-
 
| Operator Name: [[JAMES R BERNHARDT INC]]
 
| Operator Name: [[JAMES R BERNHARDT INC]]

Revision as of 03:58, 31 August 2019

Well Details

Well ID: 34-169-24106
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Wooster
Operator Name: JAMES R BERNHARDT INC
Well Pad ID:
Farm/Lease Name: ROLLER KARL
License Status: Final Restoration
License Date: 2017-08-24
Spud Date: 1985-02-13
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1985-02-23
Well Total Depth: 3560 ft
Configuration: Vertical
Latitude: 40.824585638
Longitude: -81.89798354

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1985-02-12 Issued Date 2/12/85 Expired Date 8/11/85 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03560 Proposed Drill Depth 03560
Original Spud 1985-02-13
Completed 1985-02-23
Reached Total Depth 1985-02-23
CO 1985-03-15 1742 BROWN GREGORY L CO INC GeoDate 2/12/85
Completion Report Received 1985-04-01
CO 1992-03-30 120 BERNHARDT JAMES R INC GeoDate 2/12/85
APP 2017-08-24 Proposed Formations:CLINTON, Issued Date:8/24/2017, Expired Date:8/24/2019 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2017-10-20
Record Last Modified 2018-08-03
Construction Permit Expires 2019-08-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3472 3522 13

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 60000 Gal 0 FRAC: H2O

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1986 BROWN GREGORY L CO INC 8163 301 356
1987 BROWN GREGORY L CO INC 5489 140 345
1988 BROWN GREGORY L CO INC 2889 56 365
1989 BROWN GREGORY L CO INC 4276 0 365
1990 BROWN GREGORY L CO INC 4225 134 365
1991 BROWN GREGORY L CO INC 4601 0 365
1992 JAMES R BERNHARDT INC 3125 0 365
1993 JAMES R BERNHARDT INC 1994 77 365
1994 JAMES R BERNHARDT INC 1701 0 365
1995 JAMES R BERNHARDT INC 1618 0 365
1996 JAMES R BERNHARDT INC 976 34 365
1997 JAMES R BERNHARDT INC 913 0 365
1999 JAMES R BERNHARDT INC 522 21 365
2000 JAMES R BERNHARDT INC 504 0 365
2001 JAMES R BERNHARDT INC 457 0 365
2002 JAMES R BERNHARDT INC 242 0 365
2003 JAMES R BERNHARDT INC 308 0 365
2004 JAMES R BERNHARDT INC 570 0 365
2005 JAMES R BERNHARDT INC 831 0 365
2006 JAMES R BERNHARDT INC 1221 57 365
2007 JAMES R BERNHARDT INC 1112 58 365
2008 JAMES R BERNHARDT INC 988 47 365
2009 JAMES R BERNHARDT INC 925 0 365
2010 JAMES R BERNHARDT INC 764 0 365
2011 JAMES R BERNHARDT INC 939 45 0
2012 JAMES R BERNHARDT INC 857 0 366
2013 JAMES R BERNHARDT INC 912 0 365
2014 JAMES R BERNHARDT INC 1100 0 365
2015 JAMES R BERNHARDT INC 847 0 365
2016 JAMES R BERNHARDT INC 748 68 365
2017 JAMES R BERNHARDT INC 617 0 200

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1986 BROWN GREGORY L CO INC Brine 90 356
1987 BROWN GREGORY L CO INC Brine 40 345
1988 BROWN GREGORY L CO INC Brine 17 365
1989 BROWN GREGORY L CO INC Brine 0 365
1990 BROWN GREGORY L CO INC Brine 0 365
1991 BROWN GREGORY L CO INC Brine 0 365
1992 JAMES R BERNHARDT INC Brine 32 365
1993 JAMES R BERNHARDT INC Brine 15 365
1994 JAMES R BERNHARDT INC Brine 0 365
1995 JAMES R BERNHARDT INC Brine 0 365
1996 JAMES R BERNHARDT INC Brine 0 365
1997 JAMES R BERNHARDT INC Brine 0 365
1999 JAMES R BERNHARDT INC Brine 0 365
2000 JAMES R BERNHARDT INC Brine 0 365
2001 JAMES R BERNHARDT INC Brine 0 365
2002 JAMES R BERNHARDT INC Brine 0 365
2003 JAMES R BERNHARDT INC Brine 0 365
2004 JAMES R BERNHARDT INC Brine 160 365
2005 JAMES R BERNHARDT INC Brine 196 365
2006 JAMES R BERNHARDT INC Brine 101 365
2007 JAMES R BERNHARDT INC Brine 140 365
2008 JAMES R BERNHARDT INC Brine 20 365
2009 JAMES R BERNHARDT INC Brine 0 365
2010 JAMES R BERNHARDT INC Brine 80 365
2011 JAMES R BERNHARDT INC Brine 55
2012 JAMES R BERNHARDT INC Brine 0 366
2013 JAMES R BERNHARDT INC Brine 80 365
2014 JAMES R BERNHARDT INC Brine 38 365
2015 JAMES R BERNHARDT INC Brine 38 365
2016 JAMES R BERNHARDT INC Brine 65 365
2017 JAMES R BERNHARDT INC Brine 60 200

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
00000PL517 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0178645698 2017-06-27 Production Wells No Violations Inspected production well on 06/27/2017. The tank battery consists of 1-100 bbl steel tank and 1-1,700 gal plastic tank, located within an earthen dike; 1-vertical separator, 1-drip, and 1-meter box are located nearby. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a hitmiss motor. No problems were noted at the time of the inspection.
0209948193 2018-01-22 Final Restoration No Violations Performed final restoration inspection on 01/22/2018 at the request of Jon Bernhardt. The tank battery and all associated production equipment has been removed, the diked area graded-out, and vegetation (grass) has been re-established as well as weather permits. No surface expression of the well was noted. Mr. Bernhardt stated that all buried lines associated with the well have been removed. Will follow-up to allow vegetation to re-establish itself. No problems were noted at the time of the inspection.
0343690602 2018-04-16 Final Restoration No Violations Performed final restoration follow-up inspection on 04/16/2018. All equipment and lines have been removed, the diked area filled-in and regraded, lease roads removed, and adequate vegetation has established at both the wellhead and tank battery location. Final restoration passes.
0555397232 2016-10-24 Production Wells No Violations Inspected production well on 10/24/2016. The tank battery consists of 1-100 bbl steel tank and 1-1,600 gal plastic tank, located within an earthen dike; 1-vertical separator is located nearby. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a hitmiss motor. No problems were noted at the time of the inspection.
1373976818 2013-07-16 Production Wells No Violations This is a pump jack well. No apparent problems at this time.
1413550823 2014-10-17 Production Wells No Violations This producing pumping unit well has no apparent problems or violations at this time.
1541025792 2016-01-04 Production Wells No Violations Inspected production well on 01/04/2016. The tank battery consists of 1-100 bbl steel tank and 1-1,600 gal plastic tank located within an earthen dike; 1-vertical separator is located on a gravel pad nearby. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a hitmiss motor. No problems were noted at the time of the inspection.

For data sources see[9]

References