X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-009-23819"

m
m
Line 11: Line 11:
 
| County: [[Athens_County,_Ohio|Athens]]
 
| County: [[Athens_County,_Ohio|Athens]]
 
|-
 
|-
| Municipality: [[Rome Township,_Athens_County,_Ohio|Rome Township]]
+
| Municipality: [[Rome_Township,_Athens_County,_Ohio|Rome Township]]
 
|-
 
|-
 
| Operator Name: [[HAYES JAMES BRENT]]
 
| Operator Name: [[HAYES JAMES BRENT]]

Revision as of 06:08, 31 August 2019

Well Details

Well ID: 34-009-23819
Loading map...
Country: United States
State: Ohio
County: Athens
Municipality: Rome Township
Operator Name: HAYES JAMES BRENT
Well Pad ID:
Farm/Lease Name: JB HAYES
License Status: Producing
License Date: 2012-05-25
Spud Date: 2012-07-09
Spud Drilling Contractor: DECKER WELL SERVICE
Final Drill Date: 2012-07-17
Well Total Depth: 6200 ft
Configuration: Vertical
Latitude: 39.288246703
Longitude: -81.91074967

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-05-25 Proposed Formations:CLINTON/MEDINA/UTICA, Issued Date:5/25/2012, Expired Date:5/25/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2012-07-17
Completion Report Received 2012-11-27
End of Confidential Data 2013-07-17
Construction Permit Expires 2014-05-25
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-12-11 4747 4757 20

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-09-12 H2O 0 66652 Gal 34000 Producers Service Corporation Well TD 6200', Mechaniacal Bridge plug set at 4860' and the Medina was stimulated at 4757'-4747'.
2012-09-12 H2O 15 66652 Gal 34000 Producers Service Corporation Total Depth was 6200' in the Utica Shale vertically. A Mechanical Bridge Plug was set at 4860' in order to perforate the Medina.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 HAYES JAMES BRENT 1545 284 365
2014 HAYES JAMES BRENT 2214 230 225
2015 HAYES JAMES BRENT 973 107 210
2016 HAYES JAMES BRENT 71 59 200
2017 HAYES JAMES BRENT 325 134 365
2018 HAYES JAMES BRENT 610 191 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 HAYES JAMES BRENT Brine 120 365
2014 HAYES JAMES BRENT Brine 80 225
2015 HAYES JAMES BRENT Brine 200 210
2016 HAYES JAMES BRENT Brine 35 200
2017 HAYES JAMES BRENT Brine 55 365
2018 HAYES JAMES BRENT Brine 86 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0050550464 2012-07-11 Drill / Deepen / Reopen No Violations A mixture of 50 sacks Salt gel, 25 sacks of 50 lb starch, and 160 sacks of Barite were mixed with 120 Barrels of water and pumped down the well at 8 Barrels per minute to successfully stabilize the well.
0162659483 2012-07-11 Drill / Deepen / Reopen No Violations Superior well service was brought onto site to stabilize well. Two attempts were made to pump a gel mixture of 120 Barrels of water and 110 sacks of gel down the hole at a rate of 8 Barrels per minute. Neither attempt was successful so a barite additive will be brought in to thicken the gel.
0205888764 2017-07-27 Production Wells No Violations This well is produced using a pumping unit, tubing, rods and an electric motor. The tank battery consists of 2-210 barrel steel tanks with a vertical separator. The identification sign was face down inside the dike.
0281072019 2012-07-16 Drill / Deepen / Reopen No Violations Total Depth reached at 6200 feet. Well will be logged this evening and the longstring will be run tomorrow. Gas had created a micro annulus around the intermediate casing. I spoke with the company about installation of a well head to control the gas.
0314411928 2012-06-28 Field Inspected, Well Not Found No Violations Checking stake distance to road.
0975708628 2012-07-24 Drill / Deepen / Reopen No Violations I had spoken to Randy Wolfe about placing a pressure gauge and a pop-off valve on the surface-intermediate annular space on 7/19/12. The well did not have this equipment on it as of the time of inspection.
1070148011 2012-07-05 Drill / Deepen / Reopen No Violations The pit is being constructed and the conductor will be set tomorrow morning.
1155791366 2012-07-10 Drill / Deepen / Reopen No Violations Currently drilling at 12227 feet. Plan to set intermediate string this evening.
1192195969 2013-03-01 Drill / Deepen / Reopen No Violations Follow up to 1237419020. Casing still on site. Dike not done yet. Gauge on surface and intermediate casing reads 0 psi.
1237419020 2013-02-01 Drill / Deepen / Reopen No Violations The pits have been closed and there is adequate vegetative cover. There is a small pile of casing on site including 4 1/2 production casing, conductor, rods, and 2 tubing. Failure to remove drilling equipment with in two months after completion. All equipment used in drilling shall be removed from the site.
1273037103 2012-09-27 Production Wells No Violations The pits have been closed. The pumping unit has been set and two 210 Barrel tanks are on site colleting flow-back water.
1340226600 2012-06-20 Production Wells No Violations Pre-site review with R. Wolfe.
1341589896 2012-07-06 Drill / Deepen / Reopen No Violations Twenty five feet of 13 3/8 conductor set in 17 borehole today. Bedrock encountered at 15-20 feet.
1341839054 2012-07-09 Drill / Deepen / Reopen No Violations 60 of blow line staked out. Pit lined and fenced. Entry gated and signed. Currently drilling at 85.
1341933080 2012-07-09 Drill / Deepen / Reopen No Violations 500 feet of 26 lb/ft 9 5/8 inch steel casing set in 540 feet of 12 1/4 inch borehole with 190 sack class A cement. Circulation established and good returns stayed at the surface.
1343228425 2012-07-25 Drill / Deepen / Reopen No Violations No pop-off or gauge on valve. I spoke with R. Wolfe and he let me know hed be putting a gauge on the surface casing head later this week.
1343413013 2012-07-27 Drill / Deepen / Reopen No Violations No gauge or pop-off yet.
1343766936 2012-07-31 Drill / Deepen / Reopen No Violations Filling pit today.
1344872283 2012-08-13 Drill / Deepen / Reopen No Violations A gauge has been placed on the annular space between the surface casing and the intermediate casing. It read zero psi.
1347462396 2012-09-12 Completion Testing No Violations Witnessed frac job. 50,000 gallons used to treat well in the Medina formation. Perforations from 4747-4757. Formation break at 2286 psi, Instantaneous Shut-In Pressure 478 psi, 5-minute Shut-In 450 psi.
1355861731 2012-12-18 Drill / Deepen / Reopen No Violations The pits have bee filled and there is adequate vegetative cover on site. There is still some drilling equipment on site. The dike is not finished yet.
1363702847 2013-03-19 Preliminary Restoration No Violations Follow up to 1237419020. The casing has been removed.
1638573758 2012-07-10 Drill / Deepen / Reopen No Violations Received call from R. Wolfe letting me know rig encountered large show of gas in the first Berea. Finished drilling 8 7/8 hole for intermediate string to 1600 feet. Formation Cementing was brought on site to pump gel to stabilize well. 48 sacks of gel were pumped at a rate of 4 Barrels per minute. Rate was insufficient and Superior Well service was called.
1768686907 2012-07-12 Drill / Deepen / Reopen No Violations Witnessed Blow-out preventer (BOP) test. After several attempts, the BOP held 500 psi. for 15 minutes.
2005319615 2012-07-11 Drill / Deepen / Reopen No Violations 1574 feet of new 7 and 17lb/ft intermediate casing set in 1600 feet of 8 7/8 wellbore with 250 sacks of class A cement. 600 lb Bentonite gel, 600 lb CaCl, and 70 lb celloflake used as additives. Cement was circulated to the surface and stayed at the surface. The lift pressure was 500 pounds.

For data sources see[9]

References