If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Athens_County,_Ohio|Athens]] | | County: [[Athens_County,_Ohio|Athens]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Troy_Township,_Athens_County,_Ohio|Troy Township]] |
|- | |- | ||
| Operator Name: [[K & H PARTNERS LLC]] | | Operator Name: [[K & H PARTNERS LLC]] |
Well ID: 34-009-23824 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.235082231,"lon":-81.74831273,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Athens | |
Municipality: Troy Township | |
Operator Name: K & H PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: K & H (SWIW #11) | |
License Status: Active Injection | |
License Date: 2015-03-18 | |
Spud Date: 2015-04-08 | |
Spud Drilling Contractor: YOST DRILLING | |
Final Drill Date: 2015-04-23 | |
Well Total Depth: 4010 ft | |
Configuration: Vertical | |
Latitude: 39.235082231 | |
Longitude: -81.74831273 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-03-18 | Proposed Formations:OHIO SHALE/ MARCELLUS SHALE, Issued Date:3/18/2015, Expired Date:3/17/2017 12:00:00 PM, Drilling unit acres:21.5, Proposed Well Type:SWD, Proposed Well Class:SWIW |
Reached Total Depth | 2015-04-23 | |
Completion Report Received | 2015-05-21 | |
Last Compliance Report | 2015-06-24 | |
Construction Permit Expires | 2017-03-17 | |
Record Last Modified | 2017-10-05 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0007993178 | 2017-07-24 | Salt Water Injection Well | No Violations | My inspection today revealed company has delivered 120 barrels of 12 pound salt water to kill the well. Drilling rig arrived and has rigged up. Well was brought to static level using 80 barrel of 12 pound salt water. |
0012149061 | 2017-10-04 | Salt Water Injection Well | No Violations | My inspection today revealed the injection line pressure test. The test held for 15 minutes at 630 psi with no pressure loss. |
0060155987 | 2015-04-12 | Drill / Deepen / Reopen | No Violations | Appalachian wire line on site to run a cast iron bridge plug. K&H Drilling Consultant Kevin McDonald decided to not run the cast iron bridge plug and to order a drillable bridge plug. Job was rescheduled. A drillable bridge plug was ordered from Team Oil and delivered to location. Bridge plug was set at 300 feet inside 9.625 surface casing. Top of cement inside casing was 302 feet. The 9.625 surface casing was tested at 395 psi for 30 minutes with no loss in pressure. |
0062238271 | 2015-09-02 | Salt Water Injection Well | No Violations | Inspected the injection pressure and annulus pressure. Identification posted at well. |
0094662509 | 2015-05-06 | Salt Water Injection Well | No Violations | Mechanical Integrity Test. 2 3/8 Tubing and Rebuilt Parmaco Packer set at 2039 with 21,000 lbs. tension. Annulus filled with 73.4 barrels fresh water and inhibitor. Annulus was tested at 550 psi for 15 minutes with no loss in pressure. Injection line has not been installed from the facility. |
0099503004 | 2017-07-26 | Salt Water Injection Well | No Violations | KLX Energy Services on site. They used a wireline to blow off the tubing leaving one joint of tubing attached to the packer. They have prepared their tools to run in and fish for the packer that is stuck at 1500 feet. KLX Energy Services ran in the fishing tools and 6 joint of tubing. The remainder of the tubing will be run in on 7-27-17. |
0174484591 | 2016-02-10 | Salt Water Injection Well | No Violations | Inspected the injection pressure and annulus pressure. Inspected the K&H Surface Facility 3400923821. Identification posted at the well and facility. |
0207914669 | 2015-04-23 | Drill / Deepen / Reopen | No Violations | Review of Geophysical logging and running packer on tubing to complete well construction. |
0229237442 | 2015-04-23 | Salt Water Injection Well | No Violations | Install 2041 of New 2 3/8 4.70 lb., 8 round tubing with a new Parmaco 2/38 by 7 Tension Packer. Packer set at 2041 feet with 30,000 lbs. tension (15,000 lbs. over tubing string weight). Company decided to not fill the annulus today and to wait for a pump truck. Annulus test will be scheduled at a later date. |
0313036152 | 2018-08-15 | Surface Facility Construction | No Violations | K&H has installed a short pattern flanged control and choke valve at the manifold outside of the pump house. Tested the injection line from the pump house to the well. At 830 psi for 15 minutes at 5 minutes 820 psi, at 15 minutes 805 psi. Line test passed. |
0323626458 | 2015-04-30 | Salt Water Injection Well | No Violations | Service rig on well. Pulled 31,000 lbs. tension on packer. Packer set at 2039 Scheduled to fill the annulus and test on 5-1-15. |
0411358742 | 2015-12-08 | Salt Water Injection Well | No Violations | Inspected the K&H Facility API# 3400923821, injection pressure and annulus pressure. Identification posted at the well and facility. |
0475577141 | 2016-05-19 | Salt Water Injection Well | No Violations | Inspected the surface facility, containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. Witnessed trucks unloading on the pad. Reviewed brine hauling logs. Walked the injection line right of way to the well site. Identification posted at the facility and the wellhead. |
0479142654 | 2018-05-04 | Salt Water Injection Well | No Violations | Inspect the injection pressure and annulus pressure. Identification posted. |
0528589618 | 2017-05-04 | Surface Facility Construction | No Violations | Currently installing the primary Baker injection pump. Injection operations are off line during the pump installation. |
0540657800 | 2017-07-31 | Salt Water Injection Well | No Violations | Rosies Excavation has begun to excavate for the new 4 inch connection of the injection line. Bob Lane Welding is on site to fabricate the pipe and fittings. Once this is complete, the new line will be pressure tested. The fabrication was completed by 4:30 PM The new fitting was pressure tested at 530 PSI for 15 minutes with a pressure drop of 24 psi. |
0545906462 | 2018-11-11 | Salt Water Injection Well | No Violations | Witnessed installation of used 4.5 inch casing with a rebuilt Parmaco packer set at 2014 feet. MIT scheduled for 11-13-18. |
0549267926 | 2018-10-01 | Salt Water Injection Well | No Violations | Inspected the injection pump, injection pressure and annulus pressure. Identification is posted at the well and facility. |
0588638989 | 2015-05-01 | Salt Water Injection Well | No Violations | Producers Service Corp. pump truck on site to fill annulus with fresh water and inhibitor. Perkins Oil and Gas service rig is set up on the well. |
0727864116 | 2018-07-05 | Salt Water Injection Well | No Violations | Inspected the injection pressure and annulus pressure. Identification is posted at the well site. |
0776157137 | 2015-06-08 | Surface Facility Construction | No Violations | Currently installing the injection line from the K&H #1 surface facility to the well. |
0874879215 | 2016-09-07 | Salt Water Injection Well | No Violations | Inspected the injection pressure and annulus pressure. Identification posted . |
0985395748 | 2015-04-04 | Administrative Inspection | No Violations | Surface casing cement bond log has been sent to UIC Section for review. UIC Section has advised the company to install a retrievable bridge plug at approximately 300 or top of cement inside surface casing and test casing again. |
1062226146 | 2015-04-08 | Drill / Deepen / Reopen | No Violations | Currently drilling the hole for the conductor with a 17 1/2 hammer bit on air. |
1076168252 | 2015-04-16 | Drill / Deepen / Reopen | No Violations | Currently drilling on fluid at 1970. Pit level is being maintained at an acceptable level. |
1099698205 | 2017-10-03 | Salt Water Injection Well | No Violations | Key Drilling has finished milling out the obstruction. They cleared the 7 inch diameter casing down to the open hole section of the wellbore. The drill pipe was tripped out and the 4.5 inch diameter casing was ran back in with a Parmaco packer. The packer was set at 2015 feet. The bottom of the 7 inch diameter casing is set at 2071 feet. This puts the packer within the 100 foot allowed from the injection zone. |
1125425948 | 2017-10-02 | Salt Water Injection Well | No Violations | Central Environmental Services has Key Drilling and KLX Energy Service on site. They have milled a obstruction from 1500 feet to 1590 feet. The wellbore was then circulated with salt water to remove any obstructions they remained in the wellbore. Key Drilling has returned to milling the obstruction. |
1210576787 | 2016-10-19 | Salt Water Injection Well | No Violations | Inspected the K&H surface facility, injection pressure and annulus pressure. 19 roll off containers were observed along the access road to the K&H # 3. |
1268014985 | 2016-06-21 | Salt Water Injection Well | No Violations | Inspected the K&H Surface Facility. Recorded the injection and annulus pressures. |
1271035385 | 2015-10-26 | Salt Water Injection Well | No Violations | Inspected the K&H # 1 Facility API# 3400923821, Injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. Water bars have been constructed on the access road. |
1309142198 | 2019-02-11 | Salt Water Injection Well | No Violations | Inspected the K&H containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. |
1313332887 | 2018-06-20 | Salt Water Injection Well | No Violations | K&H crew has installed an .65 orifice plate at the injection line valve, located just outside of the pump house. The injection line is connected to a manifold at the pump house, connecting the K&H #1, #2, #3. All three injection lines were tested from the pump house to the wells. Line tested at 890 psi, at 5 minutes 885 psi, at 15 minutes 870 psi. Inspected the containment dike, tanks, unloading pads, injection pump. Tested the specific gravity of the brine from inside the pump house. The specific gravity was 1.13. |
1417565714 | 2017-08-16 | Salt Water Injection Well | No Violations | The injection well was inspected for annulus pressure and injection tubing pressure. The injection pressure was 310 PSI, the annulus pressure was 560 PSI. The unloading pad and pump house were clean and free of fluids. |
1428411601 | 2015-04-06 | Drill / Deepen / Reopen | No Violations | Review of drilling location construction. There is a large pit that has been lined and fenced off. The pit is roughly 35 feet from the survey stake. The site is bermed on three of the four sides and has a gentle slope away from the ingress point. A large road has been constructed to provide access to the site with stream crossing. |
1428689905 | 2015-03-31 | Drill / Deepen / Reopen | No Violations | Currently building the drill location and access road from the K&H Surface facility to the drill location. Meet with John Morrison on site. |
1428693675 | 2015-04-07 | Drill / Deepen / Reopen | No Violations | Moving Yost #2 drill rig onto location. |
1429282014 | 2015-04-14 | Drill / Deepen / Reopen | No Violations | Currently drilling on fluid at 1455. Drill pit level is being maintained at an acceptable level. |
1429290014 | 2015-04-17 | Drill / Deepen / Reopen | No Violations | Drill was stuck at 2058, Currently drilling on fluid at 2060. Pit level is being maintained at acceptable level. |
1429815638 | 2015-04-18 | Administrative Inspection | No Violations | Installed and cemented 2071 feet of 7 casing on 4-18-15. |
1430310894 | 2015-04-28 | Drill / Deepen / Reopen | No Violations | Currently solidifying drill pit and hauling material to the land fill. Yost Drilling is moving equipment off location. Company is filling annulus with fresh water. |
1430394260 | 2015-04-29 | Drill / Deepen / Reopen | No Violations | Drill pit solidification and removal of material to landfill. Attempted to fill annulus with fresh water. Fluid level consistently dropping. Company decided to get a service rig and pull the tubing and packer. |
1434132329 | 2015-06-11 | Surface Facility Construction | No Violations | 3 Flex Pipe Systems (FC801W 10-18-2014 made in Canada. 10354m)Injection line installed from the K&H #1 surface facility to the K&H #3 SWIW. The 3 line was installed inside a 6 SDR 21 Sleeve that extends from the Facility to the SWIW. A tracer wire was installed on the entire length of the line. 3 line has flanged transition fitting on each end with stainless steel line connecting to the facility and the injection tubing. Tested the 3 line at 650 psi for 15 minutes with no loss in pressure. |
1437160581 | 2015-07-16 | Surface Facility Construction | No Violations | Request for injectivity test was authorized on July 6, 2015. 48 hour duration test. Authorization expires on July 30, 2015. The injection pump was turned on and injection test started at 12:12pm on 7-16-15. The test was shut off at 1;12pm due to electrical and remote monitoring issues. The high pressure limit switch was not operational. The injectivity test has been rescheduled. There were no leaks observed at the wellhead and the injection pressure did not exceed the max injection pressure on the permit. |
1437418097 | 2015-07-20 | Surface Facility Construction | No Violations | Request for injectivity test was authorized on July 6, 2015. 48 hour duration test. Authorization expires on July 30, 2015. The injection pump was turned on and injection test started at 8:00 am. High limit cutoff switch is installed. Injection pressure and annulus are monitored continuously. Inspected the pump house, containment dike, unloading pad, injection pump, injection pressure and annulus pressure. Collected a brine sample from the injection line after the filters for specific gravity of fluid. Used the State issued Hydrometer. Recorded 1.11 SG. |
1437589034 | 2015-07-22 | Surface Facility Construction | No Violations | Injectivity test ended at 7am. Inspected the surface facility for the K&H, injection pressure and annulus pressure. The master valve on the injection tubing and the injection line valve were both closed and locked during the inspection . |
1438111970 | 2015-07-28 | Salt Water Injection Well | No Violations | Chiefs Order 2015-358 authorizes injection. Witnessed the initial injection operations. Inspected the injection pump, injection pressure, annulus pressure and the K&H # 1 surface facility. |
1446653912 | 2018-11-07 | Salt Water Injection Well | No Violations | The tubing and packer have been removed from the well. Drill rig is currently on the well at 2430 feet to mill out a piece of an old packer. Milling operations are shut down while drill mud is brought up to weight for well control. BOP is installed on the well casing. All fluid is being stored in tanks on site. Brine trucks are hauling circulated fluid from the open tank to the K&H facility for disposal. |
1500989638 | 2017-07-25 | Salt Water Injection Well | No Violations | Key Drilling on site, they have released the packer and began pulling tubing at 8:00 AM. The packer became stuck at approximately 1500 feet. Key drilling pulled 50,000 pounds for .5 hours in an attempt to free the packer with no success. |
1501169460 | 2017-07-27 | Salt Water Injection Well | No Violations | KLX Energy Services provided the tools to remove the packer that was stuck at 1530 feet. The hydraulic jars removed the packer. When the packer was brought to surface, it was found the slips, rubber and end collar remained in the well bore. I instructed well owner Central Environmental Services to have Key Energy service rig attempt to recover the remaining pieces of the packer. |
1501256010 | 2017-07-28 | Salt Water Injection Well | No Violations | The parmaco packer was set today at 1519 feet. The annulus was tested at 521 PSI for 15 minutes. The pressure drop was 7 psi in 15 minutes. |
1505752779 | 2017-09-18 | Salt Water Injection Well | No Violations | K&H Partners has excavated at the wellhead to expose the injection tubing. The tubing was cut off and a new 4.5 inch diameter fitting was crimped onto the cut off tubing. New 4.5 inch diameter stainless steel casing was plumbed into the wellhead. The new casing was pressure tested at 600 psi for 15 minutes with 5 psi loss. The test passed as the allowable loss 30 psi. |
1506604150 | 2017-09-28 | Salt Water Injection Well | No Violations | Key Energy arrived on site on 9.27.17 and attempted to pull out the packer. I did not witness this attempt. I arrived at 8:15 Am and met with Central Environmental Services engineer Robert Rudoff. Robert informed me the packer is stuck at approximately 1524 feet. They have attempted to lower the packer to see if this will allow the packer to release. KLX Energy Services has used bumper jars to push the packer down hole. After several attempts the packer was moved down hole where it was released and removed. KLX ran a gauge ring down hole and found a obstruction at 1500 feet. The obstruction will be pushed down hole below where the packer will be set. This work will be performed on 9.29.2017. If the obstruction cannot be pushed down hole, then they will mill out the obstruction. |
1516979148 | 2017-05-09 | Salt Water Injection Well | No Violations | Inspected the K&H facility, the injection pressure and annulus pressure. Identification is posted at the well and facility. |
1533880330 | 2019-04-18 | Salt Water Injection Well | No Violations | Inspection with ODNR DOGRM UIC Supervisor. Inspected the injection pressure and annulus pressure. Identification is posted. |
1571668123 | 2015-04-23 | Drill / Deepen / Reopen | No Violations | Appalachian Well Surveys Logged the well bore. Gamma Ray / Neutron, Density / Induction, and Temperature. |
1579990136 | 2018-05-31 | Surface Facility Construction | No Violations | A new pressure reducing valve has been installed at the well site. Pressure tested the injection line from the injection line valve to the injection tubing master valve at 530 psi. at 5 minutes 528 psi, at 15 minutes 520 psi. |
1650578702 | 2018-03-01 | Salt Water Injection Well | Violations Noted | The Division received annual report form 204. Review of the form 204 revealed an exceedance of the maximum allowable injection pressure. The injection pressure shall be reduced and the auto shut down switch shall be adjusted to the maximum allowable injection pressure. A follow-up inspection will be conducted. |
1720522946 | 2018-09-17 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure, annulus pressure and unloading pad. Collected a brine sample from the pump house to measure specific gravity with the state issued Hydrometer. Specific gravity was 1.12. |
1824276449 | 2015-04-20 | Drill / Deepen / Reopen | No Violations | Test 2071 feet of 7 casing. Tested at 510 psi for 30 minutes with zero loss in pressure. Witnessed the pressure being released from the casing after the test. Drill pit level is acceptable. |
1848855615 | 2018-11-13 | Salt Water Injection Well | No Violations | Injection tubing and packer installed on 11-11-18. Mechanical Integrity Test on the annulus today. Test at 820 psi, at 5 minutes 820 psi, at 15 minutes 810 psi. Tested the injection line fittings from the injection line valve at the surface to the injection tubing master valve at 645 psi, at 5 minutes 645 psi, at 15 minutes 645 psi. |
1904705465 | 2018-03-05 | Salt Water Injection Well | No Violations | The salt water injection well was written up for 1501: 9-3-07 (D) exceeding maximum allowable injection pressure. The injection tubing had 355 psi and the annulus had 4 psi. The containment dike was free of fluids. This satisfies the compliance notice issued on 3.1.2018. |
1920471335 | 2015-04-10 | Drill / Deepen / Reopen | No Violations | Surface casing pressure test. Casing was tested multiple times with leaks visible at the surface on test equipment. Test equipment leaks were fixed and new test equipment was installed. After all visible leaks were stopped the test was unable to maintain the required pressure for 30 minutes. A cement bond log has been scheduled. |
1945287810 | 2015-04-09 | Drill / Deepen / Reopen | No Violations | Surface casing wellbore total depth 367 feet. Wellbore diameter 12.25 inches. Inspected 333.35 feet of new 9.625 inch Surface casing. Witnessed the installation of 333.35 feet of surface casing. Severe storms in area shut down rig operations multiple times. Formation Cementing circulated water and gel to the surface. Circulation was maintained during the entire cement job. Good cement returns at the surface. Cement stayed at the surface. |
1952473019 | 2016-01-13 | Salt Water Injection Well | No Violations | Inspected the K&H Surface facility, injection pressure and annulus pressure. |
1981484565 | 2015-04-15 | Drill / Deepen / Reopen | No Violations | I inspected this well to determine if they were keeping their drilling pit low enough to allow a influx of water from drilling. The pit is half full. No violations noted. |
1998763220 | 2015-05-04 | Drill / Deepen / Reopen | No Violations | Removed the tubing and packer from the well. Packer had damage on the lower portion of the element. Packer was sent to be rebuilt. Ran rebuilt Parmaco packer. Packer set at 2039 with 21,000 lbs. tension. Company plans to fill the annulus slowly with fresh water and inhibitor on 5-5-15. |
2029214050 | 2015-07-16 | Preliminary Restoration | No Violations | Drill pit has been reclaimed and the entire site has been graded to allow positive drainage of the well site. A diversion ditch was constructed upslope from the well that is channeling the surface runoff from the wood line away from the well site. The access road is graded and water bars have been installed. Good vegetative cover has been established on the well site and all affected areas along the sides of the access road. |
2042664486 | 2017-03-07 | Salt Water Injection Well | No Violations | Inspected the K&H # 1 surface facility, injection pressure and annulus pressure. Identification posted. |
2135893234 | 2015-04-08 | Drill / Deepen / Reopen | No Violations | Witnessed 117 of new 13 3/8 conductor casing set in 137 of 17 1/2 bore hole with 105 sacks of Class A cement. A centralizer was ran on the first collar down. Circulation was established and cement was seen at the surface and did not fall back. The 9 5/8 casing that was to be used for the surface job was inspected and rejected due to collar irregularities and questionable condition. New casing will be purchased and inspected before it is ran into the hole. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1650578702 | US-OH-116277 | 2018-03-27 | 9-3-07(D) | Exceeding maximum allowable injection pressure |
For data sources see[3]