If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Mahoning_County,_Ohio|Mahoning]] | | County: [[Mahoning_County,_Ohio|Mahoning]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Boardman_Township,_Mahoning_County,_Ohio|Boardman Township]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-099-22791 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.035514375,"lon":-80.65546492,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Boardman Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: UNTCH UNIT | |
License Status: Producing | |
License Date: 1998-03-09 | |
Spud Date: 1998-04-01 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 1998-04-12 | |
Well Total Depth: 6094 ft | |
Configuration: Directional | |
Latitude: 41.035514375 | |
Longitude: -80.65546492 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1998-03-09 | Proposed Formations:CLINTON, Issued Date:3/9/98, Expired Date:3/9/99 6:00:00 AM, Drilling unit acres:82.25, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 1998-04-01 | RBDMS Rec |
Completed | 1998-04-12 | RBDMS Rec |
Reached Total Depth | 1998-04-12 | RBDMS Rec |
Completion Report Received | 1998-07-01 | RBDMS Rec |
Correction to Well | 1999-01-15 | AS DRILLED LOCATION: TARGET: 380'SL & 1175'EL OF LOT 6, DIV. 3(N). TARGET X COORD: 2,508,200, Y COORD: 505,702. TARGET ELEV: 1060. ACRES: 86.50. |
Construction Permit Expires | 1999-03-09 | RBDMS Rec |
Correction to Well | 2008-02-01 | UNIT SIZE INCREASED TO 81.11 ACRES. |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1998-09-04 | 5961 | 6042 | 97 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 117310 Gal | 75000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | EVERFLOW EASTERN PTNS L P | 0 | 0 | 365 |
1999 | EVERFLOW EASTERN PTNS L P | 76722 | 231 | 365 |
2000 | EVERFLOW EASTERN PTNS L P | 50697 | 121 | 365 |
2001 | EVERFLOW EASTERN PTNS L P | 19583 | 24 | 365 |
2002 | EVERFLOW EASTERN PTNS L P | 13384 | 30 | 365 |
2003 | EVERFLOW EASTERN PTNS L P | 16151 | 38 | 365 |
2004 | EVERFLOW EASTERN PTNS L P | 12293 | 29 | 365 |
2005 | EVERFLOW EASTERN PTNS L P | 11013 | 24 | 365 |
2006 | EVERFLOW EASTERN PTNS L P | 10566 | 33 | 365 |
2007 | EVERFLOW EASTERN PTNS L P | 5513 | 13 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | 8648 | 42 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | 7342 | 1 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | 7696 | 17 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | 9494 | 7 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | 6242 | 4 | 246 |
2013 | EVERFLOW EASTERN PTNS L P | 7568 | 6 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | 8306 | 15 | 290 |
2015 | EVERFLOW EASTERN PTNS L P | 301 | 0 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | 767 | 0 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | 3854 | 0 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | 3562 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
1999 | EVERFLOW EASTERN PTNS L P | Brine | 409 | 365 |
2000 | EVERFLOW EASTERN PTNS L P | Brine | 109 | 365 |
2001 | EVERFLOW EASTERN PTNS L P | Brine | 36 | 365 |
2002 | EVERFLOW EASTERN PTNS L P | Brine | 11 | 365 |
2003 | EVERFLOW EASTERN PTNS L P | Brine | 31 | 365 |
2004 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2005 | EVERFLOW EASTERN PTNS L P | Brine | 17 | 365 |
2006 | EVERFLOW EASTERN PTNS L P | Brine | 36 | 365 |
2007 | EVERFLOW EASTERN PTNS L P | Brine | 9 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | Brine | 137 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | Brine | 23 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | Brine | 9 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | Brine | 10 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | Brine | 6 | 246 |
2013 | EVERFLOW EASTERN PTNS L P | Brine | 20 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | Brine | 11 | 290 |
2015 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | Brine | 12 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0795182419 | 2008-05-15 | Production Wells | No Violations | I performed a random field inspection. I GPSd the wellhead and the tank battery. The ID signs were posted and the tank battery was in good shape. I found no violations at this time. |
1429097481 | 2004-01-29 | Production Wells | No Violations | The tank battery is shared with permits: 2111 and 2790 and consists of: 1-100 bbl storage tank, 2-separators and a dike. |
1760669480 | 2012-01-27 | UrbanProduction Wells | No Violations | I conducted a status check on this site and found that the well is equipped with a plunger lift system and connects to a tank battery that consists of one 100 barrel stock tank and three separators. There was no brine storage tank. The thief hatch was closed and there was a bull plug installed in the draw valve. The dike was free of vegetation and debris. The tank battery is shared with permits 2790, 2111 and 3069. Proper identification was posted. I found no leaks or spills at the well head or the tank battery. I took new GPS coordinates of the well head and tank battery. No violations at this time. |
iDIAN00034 | 1998-08-17 | Preliminary Restoration | No Violations |
For data sources see[9]