Difference between revisions of "34-127-27405"

m
m
Line 11: Line 11:
 
| County: [[Perry_County,_Ohio|Perry]]
 
| County: [[Perry_County,_Ohio|Perry]]
 
|-
 
|-
| Municipality: [[Monroe Township,_Perry_County,_Ohio|Monroe Township]]
+
| Municipality: [[Monroe_Township,_Perry_County,_Ohio|Monroe Township]]
 
|-
 
|-
 
| Operator Name: [[FOUTS WILLIAM BRUCE]]
 
| Operator Name: [[FOUTS WILLIAM BRUCE]]

Revision as of 08:58, 31 August 2019

Well Details

Well ID: 34-127-27405
Loading map...
Country: United States
State: Ohio
County: Perry
Municipality: Monroe Township
Operator Name: FOUTS WILLIAM BRUCE
Well Pad ID:
Farm/Lease Name: BOBCAT TRAIL
License Status: Well Drilled
License Date: 2013-04-01
Spud Date: 2013-07-14
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 39.557485450
Longitude: -82.09503843

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-01 Proposed Formations:BEREA, Issued Date:4/1/2013, Expired Date:4/1/2015 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL
Construction Permit Expires 2015-04-01
Record Last Modified 2018-04-06

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-09-06 GEL 0 106 Lbs 106 Keller brothers shot the well. It was an open hole shot.

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 FOUTS WILLIAM BRUCE 0 0 210
2015 FOUTS WILLIAM BRUCE 0 0 365
2016 FOUTS WILLIAM BRUCE 0 0 365
2017 FOUTS WILLIAM BRUCE 0 0 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 FOUTS WILLIAM BRUCE Brine 0 210
2015 FOUTS WILLIAM BRUCE Brine 0 365
2016 FOUTS WILLIAM BRUCE Brine 0 365
2017 FOUTS WILLIAM BRUCE Brine 0 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0166044336 2013-12-18 Drill / Deepen / Reopen No Violations The rods and tubing have been ran into the well. A pumping unit has been set at the wellhead. The rig is hooked back up to the rods at this time. No one was on location at the time of my inspection. They have a temporary tank set at this time to see if the well will do anything. If the well does produce they are going to move the tank and set a tank pad.
0184709609 2013-08-12 Drill / Deepen / Reopen No Violations I stopped by to check on the status of the drilling. Bruce Fouts and crew were not on location. I contacted Bruce to see how everything was going. He is 20ft into the sand and has a little show of oil. He is deciding if he is going to produce the well or plug it.
0435503759 2013-11-06 Drill / Deepen / Reopen No Violations I stopped by this well to see if it has been put in production yet. There is rods and tubing on location. I contacted Bruce to see when he is going to run the pipe and he informed me that they would be running it this weekend.
0436706480 2013-05-02 Drill / Deepen / Reopen No Violations Accompanied Justin Smith on Conductor cement job. 102 of 29 lb/ft conductor casing was cemented to surface with 45 sacks of Class A cement with 7.75 Bbls of fresh water as a displacement. Good returns seen at surface.
0478408583 2013-07-12 Drill / Deepen / Reopen No Violations I stopped by to see how operations were coming along. Bruce told me that they will be ready to run the casing in on 15th.
0829915871 2013-04-24 Drill / Deepen / Reopen No Violations They started drilling the well. They only made a couple of feet while I was there.
0854934339 2013-07-18 Completion Testing No Violations Bruce Fouts pressured up on this well to check the integrity of the cement job. We took the pressure up to 820lbs. The pressure test passed. It held at 820lbs.
1065345163 2014-06-03 Preliminary Restoration No Violations I went out to this well to do a preliminary Restoration. The grass has started to grow on location and the pits are filled in but Bruce does not have his tank pad set yet. He is currently pumping into a temporary 100barrel tank. I contacted Bruce and he said he would have it done in a week.
1279814055 2013-05-30 Drill / Deepen / Reopen No Violations I checked on the progress of drilling this well. They have made it down 230ft. The rig crew was shut down for a couple of weeks because someone stole all of the stuff off of the rig.
1366928785 2013-04-23 Drill / Deepen / Reopen No Violations They are about ready to start drilling. They were going to start today but had to redo the clutch on the rig.
1366990603 2013-04-26 Drill / Deepen / Reopen No Violations I went out to the well site to see some more drilling. They have made it down around 30ft. They have hit rock I believe. The drilling is going good.
1367515547 2013-05-02 Drill / Deepen / Reopen No Violations Accompanied Justin Smith on drilling inspection.
1367579945 2013-05-02 Casing String Witnessed No Violations The conductor was cemented to surface. The total amount of pipe in the hole was 102. Formation did the cement job. 45 sacks of class A cement with 30 cotton seed hulls at 100lbs acceleration. They displaced with 7.75 barrels.
1372867854 2013-07-01 Drill / Deepen / Reopen No Violations I stopped to see how the drilling was coming along. They are at 655ft in depth.
1393798174 2013-06-04 Plug / Plug Back No Violations I stopped at the well to see if clay had settled at all. It was still at the surface. I contacted Mark Hines and told him it could be dug down and cut off.
1510453263 2013-09-06 Completion Testing No Violations I was on site to witness the open hole shot on this well. They used 106lbs of gel.
1555149513 2013-07-15 Casing String Witnessed No Violations I was on site to witness the cement job of the surface casing. Everything went good. We had good returns on the cement. We will pressure test the well in a day or two. I tested the water before we cemented and it was fresh water.
1605210644 2014-09-16 Preliminary Restoration No Violations I went out to this well to do the Preliminary Restoration. The well is in production and has passed the Preliminary restoration.
1712689993 2013-05-06 Drill / Deepen / Reopen No Violations I stopped in to check on the status of drilling. They have reached 120.
1785033709 2013-04-30 Drill / Deepen / Reopen No Violations I stopped to check on the progress of drilling. They have made it down 49ft.
1862778680 2013-04-18 Drill / Deepen / Reopen No Violations I met with Bruce Fouts to discuss how he is going to drill this well. The rig is on location and some equipment. He plans on being ready by the beginning of next week. He was getting ready do dig the drill pit while I was there.
1871996462 2013-06-13 Drill / Deepen / Reopen No Violations I stopped by the well site to check on progress. The rig crew was there drilling. They are down 330ft at this point.
1969660462 2013-08-27 Administrative Inspection No Violations I talked with Bruce Fouts about his well to see if he plans to do anything with it. He has a little more of an oil show now. He plans on shooting the well next week as of now.

For data sources see[8]

References