X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-055-21461"

m
m
Line 11: Line 11:
 
| County: [[Geauga_County,_Ohio|Geauga]]
 
| County: [[Geauga_County,_Ohio|Geauga]]
 
|-
 
|-
| Municipality: [[Burton Township,_Geauga_County,_Ohio|Burton Township]]
+
| Municipality: [[Burton_Township,_Geauga_County,_Ohio|Burton Township]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
Line 33: Line 33:
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: <Latitude>
+
| Latitude: 41.484137103
 
|-
 
|-
 
| Longitude: -81.14028260
 
| Longitude: -81.14028260

Revision as of 13:27, 31 August 2019

Well Details

Well ID: 34-055-21461
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Burton Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: KENT STATE UNIVERSITY
License Status: Producing
License Date: 1987-05-26
Spud Date: 1987-07-07
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1987-07-11
Well Total Depth: 4204 ft
Configuration: Vertical
Latitude: 41.484137103
Longitude: -81.14028260

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1987-05-26 Issued Date 5/26/87 Expired Date 5/25/88 Acres 0000000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04204 Proposed Drill Depth 04204
Original Spud 1987-07-07
Completed 1987-07-11
Reached Total Depth 1987-07-11
Completion Report Received 1987-08-10
CO 1987-08-11 84 EVERFLOW EASTERN PTNS L P GeoDate 5/26/87
Construction Permit Expires 1988-05-25
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3980 4090 0
2006-09-11 4002 4088 40

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 100000 Gal 60000 FRAC W/100M GAL H20 & 600 SX SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 EVERFLOW EASTERN PTNS L P 0 0 0
1988 EVERFLOW EASTERN PTNS L P 18013 1508 365
1989 EVERFLOW EASTERN PTNS L P 16608 574 365
1992 EVERFLOW EASTERN PTNS L P 11566 349 365
1993 EVERFLOW EASTERN PTNS L P 5959 195 365
1994 EVERFLOW EASTERN PTNS L P 7126 391 365
1995 EVERFLOW EASTERN PTNS L P 8336 284 365
1996 EVERFLOW EASTERN PTNS L P 6695 285 365
1997 EVERFLOW EASTERN PTNS L P 4320 187 365
1998 EVERFLOW EASTERN PTNS L P 3491 94 365
1999 EVERFLOW EASTERN PTNS L P 2384 144 365
2000 EVERFLOW EASTERN PTNS L P 1188 72 365
2001 EVERFLOW EASTERN PTNS L P 1644 180 365
2002 EVERFLOW EASTERN PTNS L P 3596 276 365
2003 EVERFLOW EASTERN PTNS L P 2847 101 365
2004 EVERFLOW EASTERN PTNS L P 4297 277 365
2005 EVERFLOW EASTERN PTNS L P 3540 199 365
2006 EVERFLOW EASTERN PTNS L P 3725 164 365
2007 EVERFLOW EASTERN PTNS L P 4191 174 365
2008 EVERFLOW EASTERN PTNS L P 3837 91 365
2009 EVERFLOW EASTERN PTNS L P 2883 85 365
2010 EVERFLOW EASTERN PTNS L P 2280 185 365
2011 EVERFLOW EASTERN PTNS L P 2174 109 365
2012 EVERFLOW EASTERN PTNS L P 2899 285 336
2013 EVERFLOW EASTERN PTNS L P 3048 219 365
2014 EVERFLOW EASTERN PTNS L P 2808 225 365
2015 EVERFLOW EASTERN PTNS L P 2857 133 365
2016 EVERFLOW EASTERN PTNS L P 2850 207 365
2017 EVERFLOW EASTERN PTNS L P 3126 199 365
2018 EVERFLOW EASTERN PTNS L P 2782 277 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 EVERFLOW EASTERN PTNS L P Brine 0 0
1988 EVERFLOW EASTERN PTNS L P Brine 713 365
1989 EVERFLOW EASTERN PTNS L P Brine 178 365
1992 EVERFLOW EASTERN PTNS L P Brine 148 365
1993 EVERFLOW EASTERN PTNS L P Brine 42 365
1994 EVERFLOW EASTERN PTNS L P Brine 80 365
1995 EVERFLOW EASTERN PTNS L P Brine 121 365
1996 EVERFLOW EASTERN PTNS L P Brine 80 365
1997 EVERFLOW EASTERN PTNS L P Brine 57 365
1998 EVERFLOW EASTERN PTNS L P Brine 37 365
1999 EVERFLOW EASTERN PTNS L P Brine 0 365
2000 EVERFLOW EASTERN PTNS L P Brine 40 365
2001 EVERFLOW EASTERN PTNS L P Brine 40 365
2002 EVERFLOW EASTERN PTNS L P Brine 38 365
2003 EVERFLOW EASTERN PTNS L P Brine 82 365
2004 EVERFLOW EASTERN PTNS L P Brine 36 365
2005 EVERFLOW EASTERN PTNS L P Brine 37 365
2006 EVERFLOW EASTERN PTNS L P Brine 38 365
2007 EVERFLOW EASTERN PTNS L P Brine 30 365
2008 EVERFLOW EASTERN PTNS L P Brine 41 365
2009 EVERFLOW EASTERN PTNS L P Brine 41 365
2010 EVERFLOW EASTERN PTNS L P Brine 38 365
2011 EVERFLOW EASTERN PTNS L P Brine 131 365
2012 EVERFLOW EASTERN PTNS L P Brine 179 336
2013 EVERFLOW EASTERN PTNS L P Brine 97 365
2014 EVERFLOW EASTERN PTNS L P Brine 0 365
2015 EVERFLOW EASTERN PTNS L P Brine 100 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 27 365
2018 EVERFLOW EASTERN PTNS L P Brine 81 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000010459 Preliminary Restoration No Violations PASSED Y WITNESSED 11/7/89 INSPECTOR DATE 11/0719/89 DATA FROM OLD VAX INFO
0100510227 2014-04-24 Production Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus is open to a pop off valve that is plumbed into the flow line. The well and the tank battery are in good condition and are surrounded by a locked chain link fence. The tank battery consists of two 100 BBL production tanks, two buried concrete brine tanks, and two mechanical separators. The proper identification is located on the tank battery and the well. The lease road is in stable condition. The tank battery and lease road are being shared by permit number 2-1462.
0855960195 2015-07-21 Production Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus is open to a pop off valve that is plumbed into the flow line. The well and the tank battery are in good condition and are surrounded by a locked chain link fence. The tank battery consists of two 100 BBL production tanks, two buried concrete brine tanks, and two mechanical separators. The proper identification is located on the tank battery and the well. The lease road is in stable condition. The tank battery and lease road are being shared by permit number 2-1462.

For data sources see[9]

References