X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-013-20855"

m
m
Line 11: Line 11:
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
|-
 
|-
| Municipality: [[Washington Township,_Belmont_County,_Ohio|Washington Township]]
+
| Municipality: [[Washington_Township,_Belmont_County,_Ohio|Washington Township]]
 
|-
 
|-
 
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
| Operator Name: [[GULFPORT ENERGY CORPORATION]]

Revision as of 16:37, 31 August 2019

Well Details

Well ID: 34-013-20855
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID: US-OH-001119
Farm/Lease Name: EDGE 210126
License Status: Producing
License Date: 2014-09-05
Spud Date: 2015-02-12
Spud Drilling Contractor: PI0NEER DRLG
Final Drill Date: 2015-07-23
Well Total Depth: 18488 ft
Configuration: Horizontal
Latitude: 39.872814935
Longitude: -80.99206859

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-09-05 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/5/2014, Expired Date:9/4/2016 12:00:00 PM, Drilling unit acres:694.276, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2015-07-23 Status/TD depth based on Drill Survey 11-6-2015 ALE
Correction to Well 2016-03-25 change in target/takepoint per as-drilled plat-ALE
Completion Report Received 2016-06-15 Status/TD depth based on Drill Survey 11-6-2015 ALE
Construction Permit Expires 2016-09-04 Status/TD depth based on Drill Survey 11-6-2015 ALE
Record Last Modified 2017-10-23 Status/TD depth based on Drill Survey 11-6-2015 ALE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-06-16 10304 10448 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/12/2015 11/30/2015 9759 12,604,300.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 TCA 6038F X-Chem, LLC Corossion Inhibitor Methanol 67-56-1 20 0.000211698 0
Water 7732-18-5 80 0.000846791 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 1.04228 0
Ener-Slick 200A AMP Chemical Friction Reducer Petroleum Hydrotreated 64742-47-8 25 0.0234353 0
Water 7732-18-5 75 0.0703058 0
Fresh water Stingray Carrier Water 7732-18-5 100 89.2349 0
40/70 White Steubenville/Cadiz Proppant Sand 14808-60-7 100 9.35405 0
Plexsurf 215E Chemplex SOLVAY Demulsifier Water 7732-18-5 64 0.00309618 0
Methanol 67-56-1 30 0.00145133 0
Alcohol, C12-13, ethoxylated 66455-14-9 1 0.00004838 0
Alkyl(C9-11) alcohol,ethoxylated 68439-46-3 5 0.000241889 0
Muriatic Acid Axiall, LLC Acid Hydrogen chloride 7647-01-0 40 0.0906584 0
Water 7732-18-5 60 0.135988 0
B-84 X-Chem, LLC Biocide Water 7732-18-5 55.5 0.0180782 0
Glutaraldehyde 111-30-8 27 0.00879481 0
n-Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00179154 0
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.00260587 0
Ethanol 64-17-5 4 0.00130293 0
SC-30 X-Chem, LLC Scale Inhibitor Sodium Polyacrylate Proprietary 30 0.00298414 0
Water 7732-18-5 70 0.00696299 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-11-12 H2O 0 6146 Bbl 144300 STINGRAY PRESSURE PUMPING LLC STAGES 1/45

50 SHOTS STAGES 2-44 SEE IMAGES

2015-11-29 H2O 0 4967 Bbl 275880 STINGRAY PRESSURE PUMPING LLC STAGE 45/45

50 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION 3978393 0 319
2017 GULFPORT ENERGY CORPORATION 1654019 0 354
2018 GULFPORT ENERGY CORPORATION 739558 0 364
2019 GULFPORT ENERGY CORPORATION 114089 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION Brine 24499 319
2017 GULFPORT ENERGY CORPORATION Brine 8041 354
2018 GULFPORT ENERGY CORPORATION Brine 3968 364
2019 GULFPORT ENERGY CORPORATION Brine 726 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0010013639 2017-12-18 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit that is on location. The production area contains three 400-
0120093710 2017-01-23 Production Wells No Violations
0970583877 2015-06-29 Casing String Witnessed No Violations On this day Pioneer # 71 had reached a total depth of 2250. The 13.375 casing was ran and cemented into a 17.5 open hole. CalFrac Cementing was on site and cemented the casing with 1733 sacks of Class A cement. Cement to surface was established. See cement ticket for details.
1034167204 2015-12-16 Preliminary Restoration No Violations Vegetation has been established at this well site. Erosion and sediment controls are in place and functioning properly. Preliminary Restoration for this site has passed.
1256334636 2015-06-27 Casing String Witnessed No Violations On this day Pioneer # 71 had reached a total depth of 352. The 18.625 casing was ran and cemented into a 24 open hole. CalFrac Cementing was on site and cemented the casing with 530 sacks of Class A cement. Cement to surface was established. See cement ticket for details.
1435836147 2017-10-19 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains three 400-
1742955367 2018-08-07 Production Wells No Violations Status check inspection found the well pad surface and lease road has a gravel surface and is in good repair. There are 6 wells present on the pad all in production. The said well is equipped with a lower A section and upper B section with 2 diameter riser pipes present at the well head and equipped with valves and manual pressure gauges to monitor annular pressure. The 13.375 x 9.625 diameter casing pressure was 200 pounds per square inch (psi) the 9.625 x 5.5 diameter casing pressure was 250 psi. The 5.5 diameter production casing internal working pressure was 800 psi and the production flow line pressure was 365 psi. The well is equipped with production tubing and artificial lift technology. There is 2 gas processing units on location. At the right rear corner of the well pad is the production fluid facility consisting of 4 steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. There is also a Mark West midstream station at the right front corner entry point of the well pad. Fire extinguishers and emergency shut down control points are present at all the critical areas of the well pad.

For data sources see[10]

References