If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Belmont_County,_Ohio|Belmont]] | | County: [[Belmont_County,_Ohio|Belmont]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Washington_Township,_Belmont_County,_Ohio|Washington Township]] |
|- | |- | ||
| Operator Name: [[GULFPORT ENERGY CORPORATION]] | | Operator Name: [[GULFPORT ENERGY CORPORATION]] |
Well ID: 34-013-20855 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.872814935,"lon":-80.99206859,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Washington Township | |
Operator Name: GULFPORT ENERGY CORPORATION | |
Well Pad ID: US-OH-001119 | |
Farm/Lease Name: EDGE 210126 | |
License Status: Producing | |
License Date: 2014-09-05 | |
Spud Date: 2015-02-12 | |
Spud Drilling Contractor: PI0NEER DRLG | |
Final Drill Date: 2015-07-23 | |
Well Total Depth: 18488 ft | |
Configuration: Horizontal | |
Latitude: 39.872814935 | |
Longitude: -80.99206859 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-05 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/5/2014, Expired Date:9/4/2016 12:00:00 PM, Drilling unit acres:694.276, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2015-07-23 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Correction to Well | 2016-03-25 | change in target/takepoint per as-drilled plat-ALE |
Completion Report Received | 2016-06-15 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Construction Permit Expires | 2016-09-04 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Record Last Modified | 2017-10-23 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-06-16 | 10304 | 10448 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/12/2015 | 11/30/2015 | 9759 | 12,604,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | TCA 6038F | X-Chem, LLC | Corossion Inhibitor | Methanol | 67-56-1 | 20 | 0.000211698 | 0 |
Water | 7732-18-5 | 80 | 0.000846791 | 0 | ||||
100 mesh | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 1.04228 | 0 | |
Ener-Slick 200A | AMP Chemical | Friction Reducer | Petroleum Hydrotreated | 64742-47-8 | 25 | 0.0234353 | 0 | |
Water | 7732-18-5 | 75 | 0.0703058 | 0 | ||||
Fresh water | Stingray | Carrier | Water | 7732-18-5 | 100 | 89.2349 | 0 | |
40/70 White | Steubenville/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 9.35405 | 0 | |
Plexsurf 215E | Chemplex SOLVAY | Demulsifier | Water | 7732-18-5 | 64 | 0.00309618 | 0 | |
Methanol | 67-56-1 | 30 | 0.00145133 | 0 | ||||
Alcohol, C12-13, ethoxylated | 66455-14-9 | 1 | 0.00004838 | 0 | ||||
Alkyl(C9-11) alcohol,ethoxylated | 68439-46-3 | 5 | 0.000241889 | 0 | ||||
Muriatic Acid | Axiall, LLC | Acid | Hydrogen chloride | 7647-01-0 | 40 | 0.0906584 | 0 | |
Water | 7732-18-5 | 60 | 0.135988 | 0 | ||||
B-84 | X-Chem, LLC | Biocide | Water | 7732-18-5 | 55.5 | 0.0180782 | 0 | |
Glutaraldehyde | 111-30-8 | 27 | 0.00879481 | 0 | ||||
n-Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.00179154 | 0 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 8 | 0.00260587 | 0 | ||||
Ethanol | 64-17-5 | 4 | 0.00130293 | 0 | ||||
SC-30 | X-Chem, LLC | Scale Inhibitor | Sodium Polyacrylate | Proprietary | 30 | 0.00298414 | 0 | |
Water | 7732-18-5 | 70 | 0.00696299 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-11-12 | H2O | 0 | 6146 Bbl | 144300 | STINGRAY PRESSURE PUMPING LLC | STAGES 1/45
50 SHOTS STAGES 2-44 SEE IMAGES |
2015-11-29 | H2O | 0 | 4967 Bbl | 275880 | STINGRAY PRESSURE PUMPING LLC | STAGE 45/45
50 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | 3978393 | 0 | 319 |
2017 | GULFPORT ENERGY CORPORATION | 1654019 | 0 | 354 |
2018 | GULFPORT ENERGY CORPORATION | 739558 | 0 | 364 |
2019 | GULFPORT ENERGY CORPORATION | 114089 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | Brine | 24499 | 319 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 8041 | 354 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 3968 | 364 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 726 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0010013639 | 2017-12-18 | Production Wells | No Violations | This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit that is on location. The production area contains three 400- |
0120093710 | 2017-01-23 | Production Wells | No Violations | |
0970583877 | 2015-06-29 | Casing String Witnessed | No Violations | On this day Pioneer # 71 had reached a total depth of 2250. The 13.375 casing was ran and cemented into a 17.5 open hole. CalFrac Cementing was on site and cemented the casing with 1733 sacks of Class A cement. Cement to surface was established. See cement ticket for details. |
1034167204 | 2015-12-16 | Preliminary Restoration | No Violations | Vegetation has been established at this well site. Erosion and sediment controls are in place and functioning properly. Preliminary Restoration for this site has passed. |
1256334636 | 2015-06-27 | Casing String Witnessed | No Violations | On this day Pioneer # 71 had reached a total depth of 352. The 18.625 casing was ran and cemented into a 24 open hole. CalFrac Cementing was on site and cemented the casing with 530 sacks of Class A cement. Cement to surface was established. See cement ticket for details. |
1435836147 | 2017-10-19 | Production Wells | No Violations | This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains three 400- |
1742955367 | 2018-08-07 | Production Wells | No Violations | Status check inspection found the well pad surface and lease road has a gravel surface and is in good repair. There are 6 wells present on the pad all in production. The said well is equipped with a lower A section and upper B section with 2 diameter riser pipes present at the well head and equipped with valves and manual pressure gauges to monitor annular pressure. The 13.375 x 9.625 diameter casing pressure was 200 pounds per square inch (psi) the 9.625 x 5.5 diameter casing pressure was 250 psi. The 5.5 diameter production casing internal working pressure was 800 psi and the production flow line pressure was 365 psi. The well is equipped with production tubing and artificial lift technology. There is 2 gas processing units on location. At the right rear corner of the well pad is the production fluid facility consisting of 4 steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. There is also a Mark West midstream station at the right front corner entry point of the well pad. Fire extinguishers and emergency shut down control points are present at all the critical areas of the well pad. |
For data sources see[10]