If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Medina_County,_Ohio|Medina]] | | County: [[Medina_County,_Ohio|Medina]] | ||
|- | |- | ||
− | | Municipality: [[Seville | + | | Municipality: [[Seville,_Medina_County,_Ohio|Seville]] |
|- | |- | ||
| Operator Name: [[BLEACHTECH LLC]] | | Operator Name: [[BLEACHTECH LLC]] |
Well ID: 34-103-25047 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02874502,"lon":-81.87236383,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Seville | |
Operator Name: BLEACHTECH LLC | |
Well Pad ID: | |
Farm/Lease Name: BLEACHTECH (SMP #2) | |
License Status: Active Injection | |
License Date: 2014-01-28 | |
Spud Date: 2014-02-22 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2014-03-03 | |
Well Total Depth: 2630 ft | |
Configuration: Vertical | |
Latitude: 41.028745020 | |
Longitude: -81.87236383 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-01-28 | Proposed Formations:SALINA F1 SALT, Issued Date:1/28/2014, Expired Date:1/28/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP |
Reached Total Depth | 2014-03-03 | |
Last Compliance Report | 2014-04-16 | |
Completion Report Received | 2014-04-23 | |
Construction Permit Expires | 2016-01-28 | |
Record Last Modified | 2018-11-30 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0150558545 | 2014-02-25 | Drill / Deepen / Reopen | No Violations | Visited location on 02/25/2014 for surface casing cement job. Rig drilled a 14 3/4 hole to 660, and ran 631 of 11 3/4, 32# surface casing with a collar on the bottom and 2 centralizers. Rigged up Petroset for cement job. Cement job went well; got 8 bbls good cement returns to surface. |
0582478629 | 2018-11-29 | Solution Mining Project | No Violations | I was on location to witness a Mechanical Integrity Test (MIT). After eight (8) hours the average test well pressure was 223.567 psi and the average reference well pressure was 80.603 with a difference of 142.964 psi. The calculated net pressure change resulted in 0.02 psi/hr., which is well below the maximum net pressure change of 0.05 psi/hr. MIT passed. |
0840077672 | 2014-03-02 | Drill / Deepen / Reopen | No Violations | Visited location on 03/02/2014 for production casing cement job. Rig drilled 11 hole to 2,427 and ran 2,388 of 8 5/8, 32# production casing. Rigged up Petroset for cement job. Cement job went well; 380 bbls good cement returns to surface. Performed MIT test after cement job. Pressured up well to 1150 psi for 15 minutes. No noticeable pressure lost during test; test passed. Plan forward is to wait on cement, and then drill-out to TD. |
0916608826 | 2017-05-18 | Solution Mining Project | No Violations | Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status. The well has been placed into production, and well identification is clearly displayed. The well status (AI) is correct. No problems were noted at the time of the inspection. |
1028310105 | 2014-04-03 | Drill / Deepen / Reopen | No Violations | Visited location on 04/03/2014 to witness logging job on the Bleachtech #13 well. The hole was loaded on 04/02/2014 with pit water (note: drilling operations had been completed the previous week, so solids in pit had settled out and water was taken from top of pit). Appalachian Well Services rigged up and logged the well. The cement bond on the 8 5/8 casing looked excellent throughout the entire length of the string. |
1033963541 | 2014-10-23 | Preliminary Restoration | No Violations | Visited location on 10/23/2014 to check on the restoration status of the well. The well is equipped for production; well identification is clearly displayed next to the wellhead. All pits have been closed and drilling equipment removed. Preliminary Restoration passes. |
1156372579 | 2017-12-01 | Solution Mining Project | No Violations | I found the injection well in operation on the day of my inspection. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time. |
1606667013 | 2018-03-30 | Solution Mining Project | No Violations | I found the injection well in operation on the day of my inspection. There is calcification build-up on the tubing. I observed no leaks or spills around the well. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time. |
1721455863 | 2014-04-10 | Drill / Deepen / Reopen | No Violations | Visited location on 04/10/2014. Crew was working to harden pit for Bleachtech #14 and #13 wells with fly ash from Chem Tech. No problems were noted at the time. |
1751501323 | 2014-02-22 | Drill / Deepen / Reopen | No Violations | Visited rig on 02/22/2014 for conductor casing cement job. Rig drilled 20 hole to 178 on freshwater mud. 4 joints of 16, 65# conductor casing was run to 161. Rigged up Petroset to cement well to surface. Cement job went well; got 14 bbls good cement returns to surface. Plan forward is to wait on cement. |
1946409363 | 2014-02-26 | Drill / Deepen / Reopen | No Violations | Visited rig to check on status of drilling operations. At the tim eof the inspection, rig was drilling ahead at 1,488. |
For data sources see[3]