If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 9: | Line 9: | ||
| State: Ohio | | State: Ohio | ||
|- | |- | ||
− | | County: | + | | County: [[Wyandot_County,_Ohio|Wyandot]] |
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Tymochtee_Township,_Wyandot_County,_Ohio|Tymochtee Township]] |
|- | |- | ||
| Operator Name: [[EQUITABLE PRODUCTION COMPANY]] | | Operator Name: [[EQUITABLE PRODUCTION COMPANY]] |
Well ID: 34-175-20301 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.982918051,"lon":-83.19650503,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wyandot | |
Municipality: Tymochtee Township | |
Operator Name: EQUITABLE PRODUCTION COMPANY | |
Well Pad ID: | |
Farm/Lease Name: RUESS P | |
License Status: Final Restoration | |
License Date: 1995-05-15 | |
Spud Date: 1994-03-08 | |
Spud Drilling Contractor: H & D DRILLING | |
Final Drill Date: 1994-04-05 | |
Well Total Depth: 1753 ft | |
Configuration: Vertical | |
Latitude: 40.982918051 | |
Longitude: -83.19650503 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1994-01-10 | 1089 MITCHELL ENERGY CORP GeoDate 1/10/94 |
Oil and Gas | 1994-01-10 | Issued Date 1/10/94 Expired Date 1/10/95 Acres 0010000 Tool Type CT Proposed Formation TRENTON Proposed Depth 01753 Proposed Drill Depth 01753 |
Original Spud | 1994-03-08 | DF=766.5 |
Completed | 1994-04-05 | DF=766.5 |
Reached Total Depth | 1994-04-05 | DF=766.5 |
Completion Report Received | 1994-09-23 | DF=766.5 |
CO | 1995-03-14 | 440 EQUITABLE RESOURCES EXP GeoDate 1/10/94 |
CO | 1995-05-15 | 440 EQUITABLE RESOURCES EXP GeoDate 5/15/95 |
DRY HOLE | 1995-05-15 | Issued Date 5/15/95 Expired Date 5/14/96 Proposed Purpose OG Was Plug Supervised Y Who Superivsed FAUSTPlug and Abandon Date 11/1/95 |
Plugged/Abandoned | 1995-11-01 | DF=766.5 |
Construction Permit Expires | 1996-05-14 | DF=766.5 |
Record Last Modified | 2013-03-14 | DF=766.5 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | MITCHELL ENERGY CORP | 0 | 0 | 365 |
1995 | MITCHELL ENERGY CORP | 0 | 0 | 0 |
1996 | MITCHELL ENERGY CORP | 0 | 0 | 0 |
1997 | MITCHELL ENERGY CORP | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | MITCHELL ENERGY CORP | Brine | 0 | 365 |
1995 | MITCHELL ENERGY CORP | Brine | 0 | 0 |
1996 | MITCHELL ENERGY CORP | Brine | 0 | 0 |
1997 | MITCHELL ENERGY CORP | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000014637 | Final Restoration | No Violations | PASSED Y WITNESSED 1/17/96 INSPECTOR FAUST, SAMUEL E. DATE 01/1719/96 DATA FROM OLD VAX INFO |
For data sources see[7]