If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Knox_County,_Ohio|Knox]] | | County: [[Knox_County,_Ohio|Knox]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Union_Township,_Knox_County,_Ohio|Union Township]] |
|- | |- | ||
| Operator Name: [[CAMPHIRE GEORGE E.]] | | Operator Name: [[CAMPHIRE GEORGE E.]] |
Well ID: 34-083-23640 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.458976364,"lon":-82.25492655,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Union Township | |
Operator Name: CAMPHIRE GEORGE E. | |
Well Pad ID: | |
Farm/Lease Name: SAPP ROBERT & HELEN | |
License Status: Producing | |
License Date: 2017-08-23 | |
Spud Date: 1985-10-16 | |
Spud Drilling Contractor: FERENBAUGH DRLG | |
Final Drill Date: 1985-11-11 | |
Well Total Depth: 2928 ft | |
Configuration: Vertical | |
Latitude: 40.458976364 | |
Longitude: -82.25492655 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1985-04-24 | Issued Date 4/24/85 Expired Date 10/21/85 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 02928 Proposed Drill Depth 02928 |
Original Spud | 1985-10-16 | |
Completed | 1985-11-11 | |
Reached Total Depth | 1985-11-11 | |
CO | 1987-06-03 | 2529 BCP ENERGY INC GeoDate 4/24/85 |
Completion Report Received | 1987-09-15 | |
CO | 1994-01-07 | 230 UNION OIL CO GeoDate 4/24/85 |
Change of Owner | 2005-02-22 | Operator changed from 230, UNION OIL CO to 1499, CAMPHIRE DRILLING-GEORGE |
APP | 2017-08-23 | Proposed Formations:CLINTON SAND, Issued Date:8/23/2017, Expired Date:8/23/2019 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
Record Last Modified | 2017-08-30 | |
Construction Permit Expires | 2019-08-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 2826 | 2882 | 0 |
2006-09-11 | 2838 | 2852 | 18 |
2006-09-11 | 2871 | 2882 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 66000 Gal | 30000 | FRAC: H2O,SAND,N2 | ||
CO2 | 0 | 15 Tons | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | BCP ENERGY INC | 4864 | 239 | 204 |
1988 | BCP ENERGY INC | 4974 | 214 | 365 |
1989 | BCP ENERGY INC | 3122 | 135 | 365 |
1990 | BCP ENERGY INC | 2111 | 131 | 365 |
1991 | BCP ENERGY INC | 1845 | 89 | 365 |
1992 | BCP ENERGY INC | 2031 | 282 | 365 |
1993 | BCP ENERGY INC | 1215 | 46 | 365 |
1994 | UNION OIL CO | 0 | 28 | 365 |
1995 | UNION OIL CO | 1020 | 0 | 365 |
1996 | UNION OIL CO | 749 | 40 | 365 |
1997 | UNION OIL CO | 695 | 40 | 250 |
1998 | UNION OIL CO | 664 | 0 | 90 |
1999 | UNION OIL CO | 387 | 0 | 90 |
2000 | UNION OIL CO | 437 | 37 | 250 |
2001 | UNION OIL CO | 0 | 0 | 60 |
2002 | UNION OIL CO | 316 | 0 | 225 |
2003 | UNION OIL CO | 168 | 36 | 200 |
2004 | UNION OIL CO | 175 | 0 | 100 |
2005 | CAMPHIRE GEORGE E. | 4 | 0 | 0 |
2006 | CAMPHIRE GEORGE E. | 0 | 30 | 156 |
2007 | CAMPHIRE GEORGE E. | 0 | 26 | 156 |
2008 | CAMPHIRE GEORGE E. | 104 | 43 | 365 |
2009 | CAMPHIRE GEORGE E. | 0 | 0 | 0 |
2010 | CAMPHIRE GEORGE E. | 214 | 0 | 0 |
2011 | CAMPHIRE GEORGE E. | 133 | 0 | 0 |
2012 | CAMPHIRE GEORGE E. | 241 | 83 | 0 |
2013 | CAMPHIRE GEORGE E. | 31 | 0 | 365 |
2014 | CAMPHIRE GEORGE E. | 12 | 0 | 365 |
2015 | CAMPHIRE GEORGE E. | 0 | 0 | 365 |
2016 | CAMPHIRE GEORGE E. | 0 | 0 | 365 |
2017 | CAMPHIRE GEORGE E. | 0 | 0 | 365 |
2018 | CAMPHIRE GEORGE E. | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | BCP ENERGY INC | Brine | 185 | 204 |
1988 | BCP ENERGY INC | Brine | 0 | 365 |
1989 | BCP ENERGY INC | Brine | 0 | 365 |
1990 | BCP ENERGY INC | Brine | 0 | 365 |
1991 | BCP ENERGY INC | Brine | 0 | 365 |
1992 | BCP ENERGY INC | Brine | 0 | 365 |
1993 | BCP ENERGY INC | Brine | 0 | 365 |
1994 | UNION OIL CO | Brine | 5 | 365 |
1995 | UNION OIL CO | Brine | 5 | 365 |
1996 | UNION OIL CO | Brine | 7 | 365 |
1997 | UNION OIL CO | Brine | 16 | 250 |
1998 | UNION OIL CO | Brine | 5 | 90 |
1999 | UNION OIL CO | Brine | 5 | 90 |
2000 | UNION OIL CO | Brine | 5 | 250 |
2001 | UNION OIL CO | Brine | 0 | 60 |
2002 | UNION OIL CO | Brine | 50 | 225 |
2003 | UNION OIL CO | Brine | 20 | 200 |
2004 | UNION OIL CO | Brine | 15 | 100 |
2005 | UNION OIL CO | Brine | 0 | 30 |
2006 | CAMPHIRE GEORGE E. | Brine | 0 | 156 |
2007 | CAMPHIRE GEORGE E. | Brine | 17 | 156 |
2008 | CAMPHIRE GEORGE E. | Brine | 0 | 365 |
2009 | CAMPHIRE GEORGE E. | Brine | 0 | 0 |
2010 | CAMPHIRE GEORGE E. | Brine | 0 | 0 |
2011 | CAMPHIRE GEORGE E. | Brine | 0 | 0 |
2012 | CAMPHIRE GEORGE E. | Brine | 0 | 0 |
2013 | CAMPHIRE GEORGE E. | Brine | 0 | 365 |
2014 | CAMPHIRE GEORGE E. | Brine | 0 | 365 |
2015 | CAMPHIRE GEORGE E. | Brine | 0 | 365 |
2016 | CAMPHIRE GEORGE E. | Brine | 0 | 365 |
2017 | CAMPHIRE GEORGE E. | Brine | 0 | 365 |
2018 | CAMPHIRE GEORGE E. | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000PL14567 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
001287i344 | 2001-09-12 | Production Wells | Violations Noted | oil around well head 6 wide by 15 long no id at well head |
001287i375 | 2001-09-28 | Production Wells | No Violations | well head id , area cleaned up at well head |
0073717153 | 2018-07-02 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well with prepared clay. The rods and tubbing have been pulled and removed from location. 2.5 tons of prepared clay was washed in for the start of the bottom hole plug. |
0091910852 | 2017-08-30 | Production Wells | No Violations | Met with surveyor Thomas Wright to get a final survey before they plug this well. |
0561543989 | 2018-07-09 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well with prepared clay. The 8 5/8 surface casing was pulled today and prepared clay is being washed in to continue plugging of this well. |
0751133488 | 2018-07-10 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well with prepared clay. They finished washing he first 10 tons of prepared clay today, removed the 8 5/8 surface casing from the location, and are in the process of getting another load of clay to finish plugging this well. |
0837134724 | 2018-06-25 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well. There was no one on site today during this inspection. |
0841224921 | 2018-07-12 | Plug / Plug Back | No Violations | This well is plugged and today the identification plated was placed and the covered and they have started the reclamation of the well site. |
1116880340 | 2018-07-05 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well with prepared clay. 7/4/2018 the 4 1/2 production casing was ripped at 1421 feet and 12 joints were pulled and laid down to prepared to wash in prepared clay for the rest of the bottom hole plug. 7/5/2018 2.5 tons of prepared clay was washed in to finish the bottom hole plug. The rest of the 4 1/2 inch production casing was pulled and a 7 inch precast seat was set at 925 feet and prepared clay was washed in to begin plugging the well the rest of the way out. |
1504009667 | 2017-08-29 | Production Wells | No Violations | This well is permitted to be plugged. This inspection is a pre plug inspection to identify the location and get a good GPS on the well. |
1593043279 | 2018-06-21 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well with prepared clay. Today they were working on the rig. |
1625830222 | 2018-07-03 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well with prepared clay. Today they were working on getting the 4 1/2 inch production casing ripped. |
1830059140 | 2018-07-06 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well with prepared clay. Today they were washing in prepared clay from the 7 inch seat and precast plug to finish plugging this well. A 8 5/8 inch nipple was welded on the 8 5/8 surface casing to prepare to pull it from the well. The 8 5/8 casing was ripped at 360 feet. |
1927679870 | 2018-07-11 | Plug / Plug Back | No Violations | Plugging operations continue with the plugging of this well with prepared clay. Today another 9 tons of prepared clay was washed in to finish plugging this well, an identification plate is being placed on top of the drive pipe 3 feet below the ground level surface and covered. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
001287i344 | US-OH-108038 | 2001-09-12 | Well operation causing pollution and contamination | |
001287i344 | US-OH-108039 | 2001-09-12 | Failure to legibly identify well |
For data sources see[9]